blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2330626

EP2330626 - COPLANAR HIGH FILL FACTOR PIXEL ARCHITECTURE [Right-click to bookmark this link]
Former [2011/23]Coplanar high fill factor pixel architecture
[2017/02]
StatusNo opposition filed within time limit
Status updated on  18.05.2018
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  09.06.2017
FormerGrant of patent is intended
Status updated on  17.01.2017
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
Carestream Health, Inc.
150 Verona Street
Rochester, NY 14608-1733 / US
[2011/23]
Inventor(s)01 / Chang, Jeff Hsin
600 Kirk Road
Rochester, NY 14612 / US
02 / Tredwell, Timothy J.
79 County Clar Crescent
Fairport, NY 14450 / US
03 / Heiler, Gregory N.
212 Buttonwood Drive
Hilton, NY 14468 / US
 [2011/23]
Representative(s)Wagner, Karl H.
Wagner & Geyer Partnerschaft mbB
Patent- und Rechtsanwälte
Gewürzmühlstrasse 5
80538 München / DE
[N/P]
Former [2017/28]Wagner, Karl H.
Wagner & Geyer
Gewürzmühlstrasse 5
80538 Munich / DE
Former [2011/23]Wagner, Karl H.
Wagner & Geyer Gewürzmühlstrasse 5
80538 Munich / DE
Application number, filing date10014569.712.11.2010
[2011/23]
Priority number, dateUS2009063095904.12.2009         Original published format: US 630959
[2011/23]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2330626
Date:08.06.2011
Language:EN
[2011/23]
Type: B1 Patent specification 
No.:EP2330626
Date:12.07.2017
Language:EN
[2017/28]
Search report(s)(Supplementary) European search report - dispatched on:EP29.03.2011
ClassificationIPC:H01L27/146
[2011/23]
CPC:
H01L27/14658 (EP,KR,US); H01L27/14603 (EP,KR,US); H01L27/14609 (EP,KR,US);
H01L27/14612 (EP,KR,US); H01L27/14636 (EP,KR,US); H01L27/14659 (EP,KR,US);
H01L27/14692 (KR); H01L31/022408 (EP,KR,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/28]
Former [2011/23]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KOPLANARE PIXELARCHITEKTUR MIT HOHEM FÜLLFAKTOR[2017/02]
English:COPLANAR HIGH FILL FACTOR PIXEL ARCHITECTURE[2017/02]
French:ARCHITECTURE DE PIXEL À FACTEUR ÉLEVÉ DE REMPLISSAGE COPLANAIRE[2017/02]
Former [2011/23]Koplanare Pixelarchitektur mit hohem Füllfaktor
Former [2011/23]Coplanar high fill factor pixel architecture
Former [2011/23]Architecture de pixel à facteur élevé de remplissage coplanaire
Examination procedure12.11.2010Examination requested  [2011/23]
08.12.2011Amendment by applicant (claims and/or description)
02.07.2012Despatch of a communication from the examining division (Time limit: M07)
12.02.2013Reply to a communication from the examining division
18.12.2014Despatch of a communication from the examining division (Time limit: M06)
29.06.2015Reply to a communication from the examining division
10.03.2016Despatch of a communication from the examining division (Time limit: M04)
20.07.2016Reply to a communication from the examining division
18.01.2017Communication of intention to grant the patent
26.05.2017Fee for grant paid
26.05.2017Fee for publishing/printing paid
26.05.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.07.2012
Opposition(s)13.04.2018No opposition filed within time limit [2018/25]
Fees paidRenewal fee
07.11.2012Renewal fee patent year 03
07.11.2013Renewal fee patent year 04
07.11.2014Renewal fee patent year 05
06.11.2015Renewal fee patent year 06
07.11.2016Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.11.2010
AL12.07.2017
AT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
MK12.07.2017
NL12.07.2017
PL12.07.2017
PT12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
TR12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
GB12.11.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
BE30.11.2017
CH30.11.2017
LI30.11.2017
[2020/33]
Former [2020/27]HU12.11.2010
AT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
MK12.07.2017
NL12.07.2017
PL12.07.2017
PT12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
TR12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
GB12.11.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
BE30.11.2017
CH30.11.2017
LI30.11.2017
Former [2020/15]HU12.11.2010
AT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
MK12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
TR12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
GB12.11.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
BE30.11.2017
CH30.11.2017
LI30.11.2017
Former [2019/51]HU12.11.2010
AT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
MK12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
GB12.11.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
BE30.11.2017
CH30.11.2017
LI30.11.2017
Former [2019/46]HU12.11.2010
AT12.07.2017
CY12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
GB12.11.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
BE30.11.2017
CH30.11.2017
LI30.11.2017
Former [2019/31]HU12.11.2010
AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
GB12.11.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
BE30.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/50]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
GB12.11.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
BE30.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/45]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IE12.11.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/43]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
LU12.11.2017
MT12.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/39]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SI12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
LU12.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/33]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
MC12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/25]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
IT12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SK12.07.2017
SM12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/23]AT12.07.2017
CZ12.07.2017
DK12.07.2017
EE12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RO12.07.2017
RS12.07.2017
SE12.07.2017
SK12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/21]AT12.07.2017
CZ12.07.2017
DK12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RS12.07.2017
SE12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/12]AT12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
LT12.07.2017
LV12.07.2017
NL12.07.2017
PL12.07.2017
RS12.07.2017
SE12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/11]AT12.07.2017
ES12.07.2017
FI12.07.2017
HR12.07.2017
LT12.07.2017
NL12.07.2017
PL12.07.2017
RS12.07.2017
SE12.07.2017
BG12.10.2017
NO12.10.2017
GR13.10.2017
IS12.11.2017
Former [2018/10]AT12.07.2017
FI12.07.2017
HR12.07.2017
LT12.07.2017
NL12.07.2017
RS12.07.2017
SE12.07.2017
NO12.10.2017
Former [2018/09]FI12.07.2017
LT12.07.2017
NL12.07.2017
SE12.07.2017
NO12.10.2017
Former [2018/08]FI12.07.2017
LT12.07.2017
NL12.07.2017
NO12.10.2017
Former [2018/07]LT12.07.2017
NO12.10.2017
Documents cited:Search[XAI]US2008001091  (KOBAYASHI ISAO [JP], et al) [X] 1,2,4-6,9,10 * paragraph [0063] - paragraph [0064] * * paragraph [0099] - paragraph [0101] * * paragraph [0103] * * claims 26,32 * * figures 4A-4B,13,14 * [A] 7 [I] 3,8;
 [XI]US5789737  (STREET ROBERT A [US]) [X] 1-8 * column 3, line 23 - column 4, line 39 * * figures 1-3 * [I] 9,10;
 [XAI]EP2086006  (FUJIFILM CORP [JP]) [X] 1,5-7 * paragraph [0035] - paragraph [0056] * * paragraph [0121] * * figures 1-4,12 * [A] 4 [I] 2,3,8-10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.