blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2213407

EP2213407 - Hydraulic machine newly manufactured component, method for manufacturing or repairing such a component [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.02.2013
Database last updated on 15.07.2024
Most recent event   Tooltip17.07.2015Lapse of the patent in a contracting state
New state(s): HU
published on 19.08.2015  [2015/34]
Applicant(s)For all designated states
Alstom Hydro France
3 Avenue André Malraux
92300 Levallois Perret / FR
[2010/31]
Inventor(s)01 / Prigent, Serge
/ Les Quartelles
38700 Le Sappey en Chartreuse / FR
 [2012/14]
Former [2010/31]01 / Prigent, Serge
Les Quartelles
38700 Le Sappey en Chartreuse / FR
Representative(s)Myon, Gérard Jean-Pierre, et al
Cabinet Lavoix
62, rue de Bonnel
69448 Lyon Cedex 03 / FR
[N/P]
Former [2012/14]Myon, Gérard Jean-Pierre, et al
Cabinet Lavoix Lyon 62, rue de Bonnel
69448 Lyon Cedex 03 / FR
Former [2010/31]Myon, Gérard Jean-Pierre, et al
Cabinet Lavoix 62, Rue de Bonnel
69448 Lyon Cedex 03 / FR
Application number, filing date10151968.428.01.2010
[2010/31]
Priority number, dateFR2009005059430.01.2009         Original published format: FR 0950594
[2010/31]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2213407
Date:04.08.2010
Language:FR
[2010/31]
Type: B1 Patent specification 
No.:EP2213407
Date:04.04.2012
Language:FR
[2012/14]
Search report(s)(Supplementary) European search report - dispatched on:EP26.04.2010
ClassificationIPC:B23P15/00, F03B1/02, B23P6/00
[2011/31]
CPC:
B23P15/006 (EP); B23P6/005 (EP); F03B1/02 (EP);
F05B2230/232 (EP); F05B2230/237 (EP); F05B2230/80 (EP);
F05B2280/20041 (EP); F05B2280/20071 (EP); F05B2280/20073 (EP);
F05B2280/2008 (EP); F05B2280/5007 (EP); F05B2280/6011 (EP);
F05C2203/0817 (EP); F05C2203/0826 (EP); F05C2203/083 (EP);
F05C2203/0869 (EP); F05C2251/10 (EP); F05C2253/12 (EP);
Y02E10/20 (EP); Y02P70/50 (EP) (-)
Former IPC [2010/31]B23P15/00, F03B3/00, F03B1/02
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2010/31]
TitleGerman:Neue Komponente einer Hydraulischen Maschine, Verfahren zur Herstellung oder Reparatur einer solchen Komponente[2011/32]
English:Hydraulic machine newly manufactured component, method for manufacturing or repairing such a component[2010/31]
French:Composant neuf de machine hydraulique, procédé de fabrication ou de maintenance d'un tel composant[2011/31]
Former [2010/31]Neue Komponente von einer Hydraulischen Maschine, Verfahren zur Herstellung oder Reparatur einer solchen Komponente
Former [2010/31]Composant neuf de machine hydraulique, procede de fabrication ou de maintenance d'un tel composant
Examination procedure01.02.2011Amendment by applicant (claims and/or description)
01.02.2011Examination requested  [2011/10]
02.11.2011Communication of intention to grant the patent
21.02.2012Fee for grant paid
21.02.2012Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.11.2011
Opposition(s)07.01.2013No opposition filed within time limit [2013/11]
Fees paidRenewal fee
09.01.2012Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.01.2010
CY04.04.2012
CZ04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
MK04.04.2012
MT04.04.2012
NL04.04.2012
PL04.04.2012
RO04.04.2012
SE04.04.2012
SI04.04.2012
SK04.04.2012
SM04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
ES15.07.2012
IS04.08.2012
PT06.08.2012
[2015/34]
Former [2015/32]CY04.04.2012
CZ04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
MK04.04.2012
MT04.04.2012
NL04.04.2012
PL04.04.2012
RO04.04.2012
SE04.04.2012
SI04.04.2012
SK04.04.2012
SM04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
ES15.07.2012
IS04.08.2012
PT06.08.2012
Former [2015/24]CY04.04.2012
CZ04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
MT04.04.2012
NL04.04.2012
PL04.04.2012
RO04.04.2012
SE04.04.2012
SI04.04.2012
SK04.04.2012
SM04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
ES15.07.2012
IS04.08.2012
PT06.08.2012
Former [2014/32]CY04.04.2012
CZ04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
MT04.04.2012
NL04.04.2012
PL04.04.2012
RO04.04.2012
SE04.04.2012
SI04.04.2012
SK04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
ES15.07.2012
IS04.08.2012
PT06.08.2012
Former [2013/34]CY04.04.2012
CZ04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
PL04.04.2012
RO04.04.2012
SE04.04.2012
SI04.04.2012
SK04.04.2012
BG04.07.2012
NO04.07.2012
GR05.07.2012
ES15.07.2012
IS04.08.2012
PT06.08.2012
Former [2013/22]CY04.04.2012
CZ04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
PL04.04.2012
RO04.04.2012
SE04.04.2012
SI04.04.2012
SK04.04.2012
NO04.07.2012
GR05.07.2012
ES15.07.2012
IS04.08.2012
PT06.08.2012
Former [2013/10]CY04.04.2012
CZ04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
PL04.04.2012
RO04.04.2012
SE04.04.2012
SI04.04.2012
SK04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
PT06.08.2012
Former [2013/09]CY04.04.2012
DK04.04.2012
EE04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
PL04.04.2012
SE04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
PT06.08.2012
Former [2013/08]CY04.04.2012
DK04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
NL04.04.2012
PL04.04.2012
SE04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
PT06.08.2012
Former [2013/01]CY04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
PL04.04.2012
SE04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
PT06.08.2012
Former [2012/50]CY04.04.2012
FI04.04.2012
HR04.04.2012
LT04.04.2012
LV04.04.2012
PL04.04.2012
SE04.04.2012
SI04.04.2012
NO04.07.2012
GR05.07.2012
IS04.08.2012
Former [2012/49]CY04.04.2012
FI04.04.2012
LT04.04.2012
PL04.04.2012
SE04.04.2012
SI04.04.2012
NO04.07.2012
IS04.08.2012
Former [2012/48]FI04.04.2012
LT04.04.2012
SE04.04.2012
NO04.07.2012
Former [2012/47]LT04.04.2012
NO04.07.2012
Documents cited:Search[A]CH216126  (BURGER AMANZ [CH]) [A] 1-15 * page 1, line 21 - page 2, line 5; figures 1-3 * * the whole document *;
 [A]GB723248  (MARKHAM & COMPANY LTD, et al) [A] 1-15 * page 3, line 24 - line 28; figure 3 * * the whole document *;
 [XA]GB995654  (DOMINION ENG WORKS LTD) [X] 6 * page 1, line 79 - line 86 * * page 2, line 16 - line 45 * * figures 1,2 * * the whole document * [A] 1-5,7-15;
 [A]JPH01219301  (HITACHI LTD) [A] 1-15* abstract *;
 [A]JP2001153019  (TOSHIBA CORP, et al) [A] 1-15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.