EP2218888 - Combined cycle power plant burning low BTU fuel [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 30.01.2015 Database last updated on 13.07.2024 | Most recent event Tooltip | 30.01.2015 | Application deemed to be withdrawn | published on 04.03.2015 [2015/10] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2010/33] | Inventor(s) | 01 /
Mazumder, Indrajit No. 441, 5th B Main 11 Block, HRBR Layout Kalyan Nagar 560043, Bangalore / IN | 02 /
Saha, Rajarshi Flat No. 003, Vishnu Enclave Behind SKR Convention Hall Kundana Halli Gate Post- Thubara Halli 560066, Karnataka / IN | 03 /
L., Shivaprasad "Bhagyajyothi", Near Ayyakere Iddya Surathkal 575014, Mangalore / IN | 04 /
Baikampady Gopalkrishna, Vinod Kumar JFWTC, Plot No. 22, EPIP, Phase 2 Whitefield Road Bangalore 560066, Karnataka / IN | [2010/33] | Representative(s) | Cleary, Fidelma, et al GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | [N/P] |
Former [2013/08] | Cleary, Fidelma, et al GE International Inc. Global Patent Operation-Europe 15 John Adam Street London WC2N 6LU / GB | ||
Former [2010/33] | Gray, Thomas, et al GE International Inc. Global Patent Operation - Europe 15 John Adam Street London WC2N 6LU / GB | Application number, filing date | 10152845.3 | 05.02.2010 | [2010/33] | Priority number, date | US20090369180 | 11.02.2009 Original published format: US 369180 | [2010/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2218888 | Date: | 18.08.2010 | Language: | EN | [2010/33] | Classification | IPC: | F02C3/20 | [2010/33] | CPC: |
F02C7/224 (EP,US);
F01K23/10 (EP,US);
F02C3/20 (EP,US);
F02C6/08 (EP,US);
F02C6/18 (EP,US);
F22B1/1815 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2010/33] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | Kombinierter Kraftwerkkreislauf mit Verbrennung von Brennstoffen mit niedrigem Heizwert | [2010/33] | English: | Combined cycle power plant burning low BTU fuel | [2010/33] | French: | Centrale à cycle combiné avec combustion des combustibles à bas pouvoir calorifique | [2010/33] | Examination procedure | 02.09.2014 | Application deemed to be withdrawn, date of legal effect [2015/10] | 17.10.2014 | Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time [2015/10] | Fees paid | Renewal fee | 29.02.2012 | Renewal fee patent year 03 | 28.02.2013 | Renewal fee patent year 04 | Penalty fee | Additional fee for renewal fee | 28.02.2014 | 05   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. |