blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2233697

EP2233697 - A nozzle assembly for a turbine [Right-click to bookmark this link]
Former [2010/39]Duct member based nozzle for turbine
[2019/09]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  17.05.2019
FormerGrant of patent is intended
Status updated on  18.02.2019
FormerRequest for examination was made
Status updated on  16.11.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
General Electric Company
1 River Road
Schenectady, NY 12345 / US
[2010/39]
Inventor(s)01 / Roberts III, Herbert Chidsey
204 Baldwin Pines Court
Simpsonville, SC 29680 / US
 [2019/25]
Former [2010/39]01 / Roberts III, Herbert Chidsey
204 Baldwin Pines Court
Simpsonville, SC 29680 / US
Representative(s)Freigutpartners IP Law Firm
Hahnrainweg 4
5400 Baden / CH
[2019/25]
Former [2013/08]Cleary, Fidelma, et al
GE International Inc.
Global Patent Operation-Europe
15 John Adam Street
London WC2N 6LU / GB
Former [2010/39]Gray, Thomas
GE International Inc. Global Patent Operation - Europe 15 John Adam Street
London WC2N 6LU / GB
Application number, filing date10156532.315.03.2010
[2010/39]
Priority number, dateUS2009041162226.03.2009         Original published format: US 411622
[2010/39]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2233697
Date:29.09.2010
Language:EN
[2010/39]
Type: A3 Search report 
No.:EP2233697
Date:09.05.2018
Language:EN
[2018/19]
Type: B1 Patent specification 
No.:EP2233697
Date:19.06.2019
Language:EN
[2019/25]
Search report(s)(Supplementary) European search report - dispatched on:EP11.04.2018
ClassificationIPC:F01D9/04
[2010/39]
CPC:
F01D9/042 (EP,US); F05D2230/61 (EP,US); F05D2240/40 (EP,US);
F05D2300/603 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2018/51]
Former [2010/39]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Düsenanordnung für eine Turbine[2019/09]
English:A nozzle assembly for a turbine[2019/09]
French:Ensemble d'aubes de guidage pour une turbine[2019/09]
Former [2010/39]Leitschaufelkanalelement für eine Turbine
Former [2010/39]Duct member based nozzle for turbine
Former [2010/39]Elément de conduit d'aube de guidage pour une turbine
Examination procedure05.11.2018Amendment by applicant (claims and/or description)
09.11.2018Examination requested  [2018/51]
09.11.2018Date on which the examining division has become responsible
19.02.2019Communication of intention to grant the patent
02.05.2019Fee for grant paid
02.05.2019Fee for publishing/printing paid
02.05.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.02.2019
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Fees paidRenewal fee
31.03.2012Renewal fee patent year 03
02.04.2013Renewal fee patent year 04
31.03.2014Renewal fee patent year 05
31.03.2015Renewal fee patent year 06
31.03.2016Renewal fee patent year 07
31.03.2017Renewal fee patent year 08
03.04.2018Renewal fee patent year 09
01.04.2019Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2010
AT19.06.2019
CY19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
MC19.06.2019
MK19.06.2019
MT19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
GB15.03.2020
IE15.03.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
[2022/32]
Former [2022/27]HU15.03.2010
AT19.06.2019
CY19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
MC19.06.2019
MT19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
GB15.03.2020
IE15.03.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/22]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
MC19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
GB15.03.2020
IE15.03.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/12]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
MC19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
IE15.03.2020
LU15.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/07]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
MC19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
IE15.03.2020
LU15.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/04]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
MC19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
LU15.03.2020
Former [2020/49]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
MC19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
Former [2020/37]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SI19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
Former [2020/36]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
Former [2020/24]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
PL19.06.2019
RO19.06.2019
SE19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
PT21.10.2019
IS24.02.2020
Former [2020/22]AT19.06.2019
CZ19.06.2019
DK19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
RO19.06.2019
SE19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
Former [2020/17]AT19.06.2019
CZ19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
RO19.06.2019
SE19.06.2019
SK19.06.2019
SM19.06.2019
TR19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
Former [2020/13]AT19.06.2019
CZ19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
RO19.06.2019
SE19.06.2019
SK19.06.2019
SM19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
Former [2020/12]AT19.06.2019
CZ19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
IT19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
RO19.06.2019
SE19.06.2019
SK19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
IS19.10.2019
PT21.10.2019
Former [2020/11]AT19.06.2019
CZ19.06.2019
EE19.06.2019
ES19.06.2019
FI19.06.2019
HR19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
RO19.06.2019
SE19.06.2019
SK19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
PT21.10.2019
Former [2020/10]AT19.06.2019
CZ19.06.2019
FI19.06.2019
HR19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
RO19.06.2019
SE19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
PT21.10.2019
Former [2020/09]CZ19.06.2019
FI19.06.2019
HR19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
SE19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
Former [2020/07]FI19.06.2019
HR19.06.2019
LT19.06.2019
LV19.06.2019
NL19.06.2019
SE19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
Former [2019/51]FI19.06.2019
HR19.06.2019
LT19.06.2019
LV19.06.2019
SE19.06.2019
BG19.09.2019
NO19.09.2019
GR20.09.2019
Former [2019/50]FI19.06.2019
HR19.06.2019
LT19.06.2019
LV19.06.2019
SE19.06.2019
NO19.09.2019
GR20.09.2019
Former [2019/49]FI19.06.2019
HR19.06.2019
LT19.06.2019
SE19.06.2019
NO19.09.2019
Former [2019/48]FI19.06.2019
LT19.06.2019
SE19.06.2019
NO19.09.2019
Former [2019/47]FI19.06.2019
LT19.06.2019
NO19.09.2019
Documents cited:Search[XY]US4827588  (MEYER ROBERT H [US]) [X] 1,4-6 * column 2, lines 6-31; figures 2-4 * [Y] 3;
 [X]US2005241149  (LUNDGREN JAN [SE], et al) [X] 1,2,4-6 * paragraphs [0018] - [0020] - [0028]; figures 2,6,7 *;
 [Y]US2006171809  (ALBRECHT HARRY A [US], et al) [Y] 3 * paragraph [0028] *;
 [X]US2007116562  (WEST JAMES A [US], et al) [X] 1,4-6 * paragraphs [0025] , [0039]; figure 5 *;
 [X]EP1803901  (GEN ELECTRIC [US]) [X] 1,3-6* paragraphs [0008] , [0012] - [0019]; figures 3,4 *;
 [X]EP1975373  (SIEMENS AG [DE]) [X] 1-6 * paragraphs [0044] - [0046]; figures 1,2,6; claim 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.