EP2230813 - A method and node for establishing a network connection by way of a connectionless transport layer protocol [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.11.2012 Database last updated on 08.10.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Sling Media PVT Ltd PSS Plaza Nr. 6 Wind Tunnel Road Murugesh Palya 560017 Bangalore / IN | [2010/38] | Inventor(s) | 01 /
Bajpai, Parimal 109, 1A Cross 4 Main, Domlur 2 Stage 560071, Bangalore / IN | 02 /
Jain, Vikal Kumar 425/5, 8th Main, 11th Cross Vinayaka Nagar 'B' Block Murugesh Palya 560017, Bangalore / IN | 03 /
Akella, Aparna Sarma 107, Vars Fantasy Apartment Kodihalli I Main, HAL 2nd Stage 560008, Bangalore / IN | [2012/03] |
Former [2010/38] | 01 /
Bajpai, Parimal 109, 1A Cross 4 Main, Domlur 2 Stage 560071, Bangalore / IN | ||
02 /
Jain, Vikal Kumar 425/5, 8th Main, 11th Cross Vinayaka Nagar 'B' Block Murugesh Palya 560017, Bangalore / IN | |||
03 /
Akella, Aparna Sarma 107, Vars Fantasy Apartment Kodihalli I Main, HAL 2nd Stage 560008, Bangalore / IN | Representative(s) | Needle, Jacqueline Beck Greener Fulwood House 12 Fulwood Place GB-London WC1V 6HR / GB | [N/P] |
Former [2012/03] | Needle, Jacqueline Beck Greener Fulwood House 12 Fulwood Place London WC1V 6HR / GB | ||
Former [2010/38] | Needle, Jacqueline Beck Greener Fulwood House 12 Fulwood Place London WC1V 6HR / GB | Application number, filing date | 10156613.1 | 16.03.2010 | [2010/38] | Priority number, date | US20090405062 | 16.03.2009 Original published format: US 405062 | [2010/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2230813 | Date: | 22.09.2010 | Language: | EN | [2010/38] | Type: | B1 Patent specification | No.: | EP2230813 | Date: | 18.01.2012 | Language: | EN | [2012/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.08.2010 | Classification | IPC: | H04L29/06 | [2010/38] | CPC: |
H04L69/16 (EP,US);
H04L45/38 (US);
H04L69/161 (EP,US);
H04L69/162 (EP,US);
H04L69/164 (EP,US);
H04L69/22 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2010/38] | Title | German: | Verfahren und Knoten zur Erzeugung einer Netzwerkverbindung mithilfe eines verbindungslosen Transportschichtprotokolls | [2011/09] | English: | A method and node for establishing a network connection by way of a connectionless transport layer protocol | [2010/38] | French: | Procédé et noeud pour établir une connexion de réseau au moyen d'un protocole de couche de transport sans connexion | [2011/09] |
Former [2010/38] | Procédé et noeud pour établir une connexion de réseau au moyen d'un protocole de couche de transport sans connexion | ||
Former [2010/38] | Verfahren und Knoten zur Erzeugung einer Netzwerkverbindung mithilfe eines verbindungslosen Transportschichtprotokolls | Examination procedure | 22.03.2011 | Amendment by applicant (claims and/or description) | 22.03.2011 | Examination requested [2011/17] | 27.07.2011 | Communication of intention to grant the patent | 24.11.2011 | Fee for grant paid | 24.11.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.07.2011 | Opposition(s) | 19.10.2012 | No opposition filed within time limit [2012/52] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.03.2010 | AT | 18.01.2012 | BE | 18.01.2012 | CY | 18.01.2012 | CZ | 18.01.2012 | DK | 18.01.2012 | EE | 18.01.2012 | FI | 18.01.2012 | HR | 18.01.2012 | IT | 18.01.2012 | LT | 18.01.2012 | LV | 18.01.2012 | MK | 18.01.2012 | MT | 18.01.2012 | PL | 18.01.2012 | RO | 18.01.2012 | SE | 18.01.2012 | SI | 18.01.2012 | SK | 18.01.2012 | SM | 18.01.2012 | TR | 18.01.2012 | IE | 16.03.2012 | LU | 16.03.2012 | MC | 31.03.2012 | BG | 18.04.2012 | NO | 18.04.2012 | GR | 19.04.2012 | ES | 29.04.2012 | IS | 18.05.2012 | PT | 18.05.2012 | [2014/34] |
Former [2014/27] | AT | 18.01.2012 | |
BE | 18.01.2012 | ||
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
MK | 18.01.2012 | ||
MT | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
SM | 18.01.2012 | ||
TR | 18.01.2012 | ||
IE | 16.03.2012 | ||
LU | 16.03.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
ES | 29.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2014/21] | AT | 18.01.2012 | |
BE | 18.01.2012 | ||
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
MK | 18.01.2012 | ||
MT | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
TR | 18.01.2012 | ||
IE | 16.03.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
ES | 29.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2013/35] | AT | 18.01.2012 | |
BE | 18.01.2012 | ||
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
MK | 18.01.2012 | ||
MT | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
IE | 16.03.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
ES | 29.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2013/22] | AT | 18.01.2012 | |
BE | 18.01.2012 | ||
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
MK | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
IE | 16.03.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
ES | 29.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2013/12] | AT | 18.01.2012 | |
BE | 18.01.2012 | ||
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
MK | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
IE | 16.03.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2013/08] | AT | 18.01.2012 | |
BE | 18.01.2012 | ||
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
IE | 16.03.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2013/07] | AT | 18.01.2012 | |
BE | 18.01.2012 | ||
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/50] | BE | 18.01.2012 | |
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
IT | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
SK | 18.01.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/49] | BE | 18.01.2012 | |
CY | 18.01.2012 | ||
CZ | 18.01.2012 | ||
DK | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
RO | 18.01.2012 | ||
SE | 18.01.2012 | ||
SI | 18.01.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/48] | BE | 18.01.2012 | |
CY | 18.01.2012 | ||
EE | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
SE | 18.01.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/47] | BE | 18.01.2012 | |
CY | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
MC | 31.03.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/41] | BE | 18.01.2012 | |
CY | 18.01.2012 | ||
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/39] | BE | 18.01.2012 | |
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
LT | 18.01.2012 | ||
LV | 18.01.2012 | ||
PL | 18.01.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/37] | BE | 18.01.2012 | |
FI | 18.01.2012 | ||
HR | 18.01.2012 | ||
LT | 18.01.2012 | ||
PL | 18.01.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
PT | 18.05.2012 | ||
Former [2012/36] | BE | 18.01.2012 | |
HR | 18.01.2012 | ||
LT | 18.01.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
GR | 19.04.2012 | ||
IS | 18.05.2012 | ||
Former [2012/35] | BE | 18.01.2012 | |
LT | 18.01.2012 | ||
BG | 18.04.2012 | ||
NO | 18.04.2012 | ||
IS | 18.05.2012 | ||
Former [2012/34] | BE | 18.01.2012 | |
LT | 18.01.2012 | ||
NO | 18.04.2012 | ||
IS | 18.05.2012 | Documents cited: | Search | [A]US2003115357 (CHU HAO-HUA [US], et al) [A] 1-11 * paragraph [0074] *; | [A]US2008075048 (SUSZKO AUGUST J [US]) [A] 1-11 * paragraph [0007] *; | [A]US2008281976 (KEMP DEVON JAMES [US]) [A] 1-11* paragraph [0028] * |