EP2386493 - Standing pouch made of a heat sealable plastic film [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.07.2018 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 04.08.2017 | ||
Former | Grant of patent is intended Status updated on 10.05.2017 | ||
Former | Examination is in progress Status updated on 11.11.2016 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Mondi Halle GmbH Wielandstrasse 2 33790 Halle / DE | [2017/34] |
Former [2011/46] | For all designated states Nordenia Deutschland Halle GmbH Wielandstrasse 2 33790 Halle / DE | Inventor(s) | 01 /
Brauer, Jochen Christoph-Bernard-Strasse 39 49393 Lohne / DE | 02 /
Kruse, Alfons Christoph-Bernard-Strasse 24 49413 Dinklage / DE | [2011/46] | Representative(s) | Lorenz, Bernd Ingo Thaddeus, et al Andrejewski - Honke Patent- und Rechtsanwälte Partnerschaft mbB Postfach 10 02 54 45002 Essen / DE | [N/P] |
Former [2017/36] | Lorenz, Bernd Ingo Thaddeus, et al Andrejewski - Honke Patent -und Rechtsanwälte Postfach 10 02 54 45002 Essen / DE | ||
Former [2011/46] | Albrecht, Rainer Harald Andrejewski - Honke Patent- und Rechtsanwälte An der Reichsbank 8 45127 Essen / DE | Application number, filing date | 10162623.2 | 12.05.2010 | [2011/46] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2386493 | Date: | 16.11.2011 | Language: | DE | [2011/46] | Type: | B1 Patent specification | No.: | EP2386493 | Date: | 06.09.2017 | Language: | DE | [2017/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.08.2010 | Classification | IPC: | B65D75/56, B65D75/58, B65D75/00, A41B9/02, A41B9/04 | [2017/18] | CPC: |
B65D75/008 (EP,US);
B65D75/56 (EP,US);
B65D75/5883 (EP,US);
A41B9/02 (US);
A41B9/023 (US);
A41B9/04 (US);
Y02W30/80 (EP,US)
(-)
|
Former IPC [2013/35] | B65D75/56, B65D75/58, B65D75/00 | ||
Former IPC [2011/46] | B65D5/46, B65D75/00, B65D33/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2017/36] |
Former [2011/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Standbodenbeutel aus einer heißsiegelfähigen Kunststofffolie | [2011/46] | English: | Standing pouch made of a heat sealable plastic film | [2011/46] | French: | Sac à fond plat tenant debout composé d'une feuille plastique pouvant être scellée à chaud | [2011/46] | Examination procedure | 13.10.2010 | Examination requested [2011/46] | 28.03.2011 | Despatch of a communication from the examining division (Time limit: M06) | 06.10.2011 | Reply to a communication from the examining division | 02.02.2012 | Despatch of a communication from the examining division (Time limit: M06) | 10.08.2012 | Reply to a communication from the examining division | 27.04.2015 | Despatch of a communication from the examining division (Time limit: M04) | 28.08.2015 | Reply to a communication from the examining division | 02.05.2016 | Despatch of a communication from the examining division (Time limit: M06) | 10.11.2016 | Reply to a communication from the examining division | 11.05.2017 | Communication of intention to grant the patent | 30.06.2017 | Fee for grant paid | 30.06.2017 | Fee for publishing/printing paid | 02.08.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.03.2011 | Opposition(s) | 07.06.2018 | No opposition filed within time limit [2018/33] | Fees paid | Renewal fee | 30.03.2012 | Renewal fee patent year 03 | 18.04.2013 | Renewal fee patent year 04 | 27.03.2014 | Renewal fee patent year 05 | 29.04.2015 | Renewal fee patent year 06 | 18.05.2016 | Renewal fee patent year 07 | 22.05.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 06.09.2017 | CY | 06.09.2017 | CZ | 06.09.2017 | DK | 06.09.2017 | EE | 06.09.2017 | ES | 06.09.2017 | FI | 06.09.2017 | HR | 06.09.2017 | LT | 06.09.2017 | LV | 06.09.2017 | MC | 06.09.2017 | MK | 06.09.2017 | MT | 06.09.2017 | NL | 06.09.2017 | PL | 06.09.2017 | PT | 06.09.2017 | RO | 06.09.2017 | SE | 06.09.2017 | SI | 06.09.2017 | SK | 06.09.2017 | SM | 06.09.2017 | TR | 06.09.2017 | BG | 06.12.2017 | NO | 06.12.2017 | GR | 07.12.2017 | IS | 06.01.2018 | AT | 12.05.2018 | IE | 12.05.2018 | LU | 12.05.2018 | BE | 31.05.2018 | CH | 31.05.2018 | LI | 31.05.2018 | [2020/33] |
Former [2020/31] | CY | 06.09.2017 | |
CZ | 06.09.2017 | ||
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MK | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
PT | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
TR | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
AT | 12.05.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/27] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
PT | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
TR | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
AT | 12.05.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/16] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
TR | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
AT | 12.05.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/46] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
AT | 12.05.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/24] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/19] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/17] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
LU | 12.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/12] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/06] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MC | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
Former [2018/43] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
MT | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
Former [2018/39] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SI | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
Former [2018/35] | CZ | 06.09.2017 | |
DK | 06.09.2017 | ||
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
Former [2018/24] | CZ | 06.09.2017 | |
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SK | 06.09.2017 | ||
SM | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
Former [2018/23] | CZ | 06.09.2017 | |
EE | 06.09.2017 | ||
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
NL | 06.09.2017 | ||
PL | 06.09.2017 | ||
RO | 06.09.2017 | ||
SE | 06.09.2017 | ||
SK | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
IS | 06.01.2018 | ||
Former [2018/21] | CZ | 06.09.2017 | |
ES | 06.09.2017 | ||
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
NL | 06.09.2017 | ||
SE | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
Former [2018/15] | ES | 06.09.2017 | |
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
NL | 06.09.2017 | ||
SE | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
Former [2018/12] | ES | 06.09.2017 | |
FI | 06.09.2017 | ||
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
LV | 06.09.2017 | ||
SE | 06.09.2017 | ||
BG | 06.12.2017 | ||
NO | 06.12.2017 | ||
GR | 07.12.2017 | ||
Former [2018/10] | FI | 06.09.2017 | |
HR | 06.09.2017 | ||
LT | 06.09.2017 | ||
SE | 06.09.2017 | ||
NO | 06.12.2017 | ||
Former [2018/09] | FI | 06.09.2017 | |
LT | 06.09.2017 | ||
SE | 06.09.2017 | ||
NO | 06.12.2017 | ||
Former [2018/08] | FI | 06.09.2017 | |
LT | 06.09.2017 | ||
NO | 06.12.2017 | ||
Former [2018/07] | LT | 06.09.2017 | |
NO | 06.12.2017 | Documents cited: | Search | [X]US2004109616 (WINIECKI JERRY [US]) [X] 1-4 * paragraphs [0045] - [0052]; figures 3, 4 *; | [X]US2003077006 (SIEGEL KENNETH D [US]) [X] 1,4 * paragraphs [0020] - [0021]; figures 1, 5 *; | [X]WO02085729 (ECO LEAN RES & DEV AS [DK], et al) [X] 1,4 * page 4, paragraph 1; figures 1, 2 *; | [X]DE7833490U (NAUMANN WILLI) [X] 1,4 * page 4; figures 1, 2 *; | [Y]WO2008145164 (NORDENIA D HALLE GMBH [DE], et al) [Y] 1-4 * page 14, lines 6-11; figure 2 *; | [Y]EP1798157 (HOSOKAWA YOKO KK [JP], et al) [Y] 1-4 * paragraph [0040]; figure 2 *; | [Y]WO03047993 (LEE JUNG-MIN [KR]) [Y] 1-4 * page 7, lines 11-16; figure 9 * | Examination | JP2002012234 | JP3516031B |