blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2288221

EP2288221 - System and connection initialization method thereof [Right-click to bookmark this link]
Former [2011/08]E-Node-B, relay node and connection initialization method thereof
[2015/20]
StatusNo opposition filed within time limit
Status updated on  26.08.2016
Database last updated on 28.09.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Institute for Information Industry
11 Fl. No. 106, Sec. 2
Ho-Ping E. Road
Taipei / TW
[2015/43]
Former [2011/08]For all designated states
Institute for Imformation Industry
11 Fl. No. 106, Sec. 2 Ho-Ping E. Road
Taipei / TW
Inventor(s)01 / Wu, Chih-Chiang
No. 87. Jhengde Rd., Shalu Township,
Taichung, County
Taipei / TW
02 / Loa, Kanchei
2F., No. 57, Alley 7, Lane 397
Mingshuei Rd.
Taipei / TW
03 / Liu, Shu-Tsz
4F No. 2, Aly14 Ln251 Futch St.
Taipei / TW
 [2015/43]
Former [2011/08]01 / Wu, Chih-Chiang
No. 87. Jhengde Rd., Shalu Township, Taichung, County
Taipei / TW
02 / Loa, Kanchei
2F., No. 57, Alley 7, Lane 397 Mingshuei Rd.
Taipei / TW
03 / Liu, Shu-Tsz
4F No. 2, Aly14 Ln251 Futch St.
Taipei / TW
Representative(s)Michalski Hüttermann & Partner Patentanwälte mbB
Kaistraße 16A
40221 Düsseldorf / DE
[N/P]
Former [2015/43]Michalski Hüttermann & Partner Patentanwälte mbB
Speditionstraße 21
40221 Düsseldorf / DE
Former [2013/10]Michalski Hüttermann & Partner Patentanwälte
Hafenspitze
Speditionstrasse 21
40221 Düsseldorf / DE
Former [2011/08]Michalski, Stefan
Michalski Hüttermann & Partner Patentanwälte Neuer Zollhof 2
D-40221 Düsseldorf / DE
Application number, filing date10173195.818.08.2010
[2011/08]
Priority number, dateUS20090234639P18.08.2009         Original published format: US 234639 P
US20090242817P16.09.2009         Original published format: US 242817 P
US20090245262P23.09.2009         Original published format: US 245262 P
[2011/08]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2288221
Date:23.02.2011
Language:EN
[2011/08]
Type: A3 Search report 
No.:EP2288221
Date:30.05.2012
Language:EN
[2012/22]
Type: B1 Patent specification 
No.:EP2288221
Date:21.10.2015
Language:EN
[2015/43]
Search report(s)(Supplementary) European search report - dispatched on:EP25.04.2012
ClassificationIPC:H04W76/02
[2011/08]
CPC:
H04W76/11 (EP,US); H04B7/2606 (EP,US); H04W76/12 (EP,US);
H04W84/047 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2015/43]
Former [2011/08]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:System und Verbindungsaufbauverfahren dafür[2015/20]
English:System and connection initialization method thereof[2015/20]
French:Système et procédé d'initialisation de connexion correspondant[2015/20]
Former [2011/08]E-Node-B, Verzögerungsknoten und Verbindungsaufbauverfahren dafür
Former [2011/08]E-Node-B, relay node and connection initialization method thereof
Former [2011/08]E-Node-B, noeud de relais et procédé d'initialisation de connexion correspondant
Examination procedure28.11.2012Amendment by applicant (claims and/or description)
28.11.2012Examination requested  [2013/02]
13.03.2013Despatch of a communication from the examining division (Time limit: M04)
04.07.2013Reply to a communication from the examining division
05.08.2014Despatch of a communication from the examining division (Time limit: M04)
03.12.2014Reply to a communication from the examining division
21.04.2015Communication of intention to grant the patent
20.08.2015Fee for grant paid
20.08.2015Fee for publishing/printing paid
20.08.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.03.2013
Opposition(s)22.07.2016No opposition filed within time limit [2016/39]
Fees paidRenewal fee
31.08.2012Renewal fee patent year 03
28.08.2013Renewal fee patent year 04
29.07.2014Renewal fee patent year 05
25.08.2015Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.08.2010
AL21.10.2015
AT21.10.2015
BE21.10.2015
BG21.10.2015
CY21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
MC21.10.2015
MK21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
TR21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
[2018/46]
Former [2018/38]HU18.08.2010
AT21.10.2015
BE21.10.2015
BG21.10.2015
CY21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
MC21.10.2015
MK21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
TR21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2018/33]HU18.08.2010
AT21.10.2015
BE21.10.2015
CY21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
MC21.10.2015
MK21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
TR21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2018/29]HU18.08.2010
AT21.10.2015
BE21.10.2015
CY21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
MC21.10.2015
MK21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
TR21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2018/28]HU18.08.2010
AT21.10.2015
BE21.10.2015
CY21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
MC21.10.2015
MK21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2017/23]AT21.10.2015
BE21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
MC21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2017/03]AT21.10.2015
BE21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/49]AT21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SI21.10.2015
SK21.10.2015
SM21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/39]AT21.10.2015
CZ21.10.2015
DK21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SK21.10.2015
SM21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/38]AT21.10.2015
CZ21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SK21.10.2015
SM21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/36]AT21.10.2015
CZ21.10.2015
EE21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
NL21.10.2015
PL21.10.2015
RO21.10.2015
SE21.10.2015
SK21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/34]AT21.10.2015
CZ21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
NL21.10.2015
PL21.10.2015
SE21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/25]AT21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
LV21.10.2015
NL21.10.2015
PL21.10.2015
SE21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/24]AT21.10.2015
ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
NL21.10.2015
PL21.10.2015
SE21.10.2015
NO21.01.2016
GR22.01.2016
IS21.02.2016
PT22.02.2016
Former [2016/23]ES21.10.2015
HR21.10.2015
IT21.10.2015
LT21.10.2015
NL21.10.2015
SE21.10.2015
NO21.01.2016
IS21.02.2016
Former [2016/22]ES21.10.2015
IT21.10.2015
LT21.10.2015
NL21.10.2015
NO21.01.2016
IS21.02.2016
Former [2016/21]ES21.10.2015
IT21.10.2015
LT21.10.2015
NO21.01.2016
Former [2016/20]ES21.10.2015
LT21.10.2015
Documents cited:Search[A]  - III ET AL, "Type 1 Relay Architecture", 3GPP DRAFT; R2-093680, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090623), no. Los Angeles, USA; 20090623, XP050351923 [A] 1-42 * paragraph [02.1] * * paragraph [02.2] * * paragraph [02.3] *
 [A]  - ERICSSON, "Termination of the S1/X2 interfaces in relay node", 3GPP DRAFT; R2-092953, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090428), no. San Francisco, USA; 20090428, XP050340749 [A] 1-42 * paragraph [02.2] *
 [A]  - HUAWEI, "Type 1 Relay Architecture Consideration", 3GPP DRAFT; R2-093106 TYPE 1 RELAY ARCHITECTURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090428), no. San Francisco, USA; 20090428, XP050340848 [A] 1-42 * table 1 * * paragraph [0009] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.