EP2302526 - METHOD FOR DISTRIBUTING CPU LOAD IN DATA PROCESSING DEVICES WHEN EXECUTING BLOCK-BASED COMPUTATION PROCESSES [Right-click to bookmark this link] | |||
Former [2011/13] | Method for distributing CPU load in data processing devices when executing block-based computation processes | ||
[2018/35] | Status | No opposition filed within time limit Status updated on 01.11.2019 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 23.11.2018 | ||
Former | Grant of patent is intended Status updated on 30.07.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Native Instruments GmbH Schlesische Strasse 29-30 10997 Berlin / DE | [2018/51] |
Former [2011/13] | For all designated states Native Instruments GmbH Schlesische Strasse 27 10997 Berlin / DE | Inventor(s) | 01 /
Le Goff, Mickael Muskauer Staße 27 10997 Berlin / DE | 02 /
Noppeney, Dennis Aachener Straße 1372 50859, Köln / DE | [2018/52] |
Former [2011/13] | 01 /
Le Goff, Mickael Muskauer Staße 27 10997 Berlin / DE | ||
02 /
Noppeney, Dennis Aachener Straße 1372 50859, Köln / DE | Representative(s) | Gulde & Partner Patent- und Rechtsanwaltskanzlei mbB Wallstraße 58/59 10179 Berlin / DE | [2018/52] |
Former [2011/13] | Gulde Hengelhaupt Ziebig & Schneider Patentanwälte - Rechtsanwälte Wallstrasse 58/59 10179 Berlin / DE | Application number, filing date | 10180597.6 | 28.09.2010 | [2011/13] | Priority number, date | DE20091045094 | 29.09.2009 Original published format: DE102009045094 | DE20101002111 | 18.02.2010 Original published format: DE102010002111 | [2011/13] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2302526 | Date: | 30.03.2011 | Language: | DE | [2011/13] | Type: | A3 Search report | No.: | EP2302526 | Date: | 30.10.2013 | Language: | DE | [2013/44] | Type: | B1 Patent specification | No.: | EP2302526 | Date: | 26.12.2018 | Language: | DE | [2018/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.10.2013 | Classification | IPC: | G06F17/15, G06F17/10, G06F9/50 | [2013/44] | CPC: |
G06F17/156 (EP,US);
G06F17/10 (EP,US);
G06F9/5083 (EP,US)
|
Former IPC [2011/13] | G06F17/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/52] |
Former [2011/13] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR VERTEILUNG DER RECHENLAST IN DATENVERARBEITUNGSEINRICHTUNGEN BEI EINER DURCHFÜHRUNG VON BLOCKBASIERTEN RECHENVORSCHRIFTEN | [2018/35] | English: | METHOD FOR DISTRIBUTING CPU LOAD IN DATA PROCESSING DEVICES WHEN EXECUTING BLOCK-BASED COMPUTATION PROCESSES | [2018/35] | French: | PROCÉDÉ DE RÉPARTITION DE LA CHARGE DE CALCUL DANS DES DISPOSITIFS DE TRAITEMENT DE DONNÉES LORS DE L'EXÉCUTION DE CALCULS PAR BLOCS | [2018/35] |
Former [2011/13] | Verfahren zur Verteilung der Rechenlast in Datenverarbeitungseinrichtungen bei einer Durchführung von blockbasierten Rechenvorschriften | ||
Former [2011/13] | Method for distributing CPU load in data processing devices when executing block-based computation processes | ||
Former [2011/13] | Procédé de répartition de la charge de calcul dans des dispositifs de traitement de données lors de l'exécution de calculs par blocs | Examination procedure | 30.04.2014 | Amendment by applicant (claims and/or description) | 30.04.2014 | Examination requested [2014/24] | 05.04.2016 | Despatch of a communication from the examining division (Time limit: M04) | 02.08.2016 | Reply to a communication from the examining division | 31.07.2018 | Communication of intention to grant the patent | 13.11.2018 | Fee for grant paid | 13.11.2018 | Fee for publishing/printing paid | 13.11.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.04.2016 | Opposition(s) | 27.09.2019 | No opposition filed within time limit [2019/49] | Fees paid | Renewal fee | 27.09.2012 | Renewal fee patent year 03 | 25.09.2013 | Renewal fee patent year 04 | 25.09.2014 | Renewal fee patent year 05 | 28.09.2015 | Renewal fee patent year 06 | 28.09.2016 | Renewal fee patent year 07 | 26.09.2017 | Renewal fee patent year 08 | 25.09.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.09.2010 | AL | 26.12.2018 | CY | 26.12.2018 | CZ | 26.12.2018 | DK | 26.12.2018 | EE | 26.12.2018 | ES | 26.12.2018 | FI | 26.12.2018 | HR | 26.12.2018 | IT | 26.12.2018 | LT | 26.12.2018 | LV | 26.12.2018 | MC | 26.12.2018 | MK | 26.12.2018 | MT | 26.12.2018 | NL | 26.12.2018 | PL | 26.12.2018 | RO | 26.12.2018 | SE | 26.12.2018 | SI | 26.12.2018 | SK | 26.12.2018 | SM | 26.12.2018 | TR | 26.12.2018 | BG | 26.03.2019 | NO | 26.03.2019 | GR | 27.03.2019 | IS | 26.04.2019 | PT | 26.04.2019 | [2022/31] |
Former [2021/34] | HU | 28.09.2010 | |
AL | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
MT | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2021/32] | HU | 28.09.2010 | |
AL | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2021/26] | AL | 26.12.2018 | |
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/25] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/17] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/13] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/48] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/39] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/37] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/35] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/34] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/33] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/30] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/26] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/24] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/23] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/22] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/21] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
NO | 26.03.2019 | ||
Former [2019/20] | LT | 26.12.2018 | |
NO | 26.03.2019 | Documents cited: | Search | [AD]US2003046637 (ZHANG JIAN [US]) [AD] 1-10 * paragraph [0092] - paragraph [0102] *; | [XD] - GARDNER W G, "EFFICIENT CONVOLUTION WITHOUT INPUT-OUTPUT DELAY", JOURNAL OF THE AUDIO ENGINEERING SOCIETY, AUDIO ENGINEERING SOCIETY, NEW YORK, NY, US, (19950301), vol. 43, no. 3, ISSN 1549-4950, pages 127 - 135, XP000730158 [XD] 1-10 * sections 0-3 * | [A] - GUILLERMO GARCÍA, "Optimal Filter Partition for Efficient Convolution with Short Input/Output Delay", 113TH AES CONVENTION, Los Angeles, CA, USA, (20021005), pages 1 - 9, XP055080918 [A] 1-10 * page 1 - page 3 * | Examination | - M Fink ET AL, "Load-Balanced Implementation of a Delayless Partitioned Block Frequency-Domain Adaptive Filter", GI-Jahrestagung, volume 220 of LNI, (20130916), pages 2868 - 2879, URL: https://pdfs.semanticscholar.org/1f26/c437d657fe41300e4dc44373b44e7230cca4.pdf, (20160329), XP055261286 | by applicant | US2003004663 | - WILLIAM G., "Efficient Convolution without Input-Output Delay", JAES, (199503), vol. 43, no. 3, pages 127 - 136, XP000730158 |