EP2336291 - Apparatus for pretreating biomass using internal heat [Right-click to bookmark this link] | |||
Former [2011/25] | Method and apparatus for pretreating biomass using internal heat | ||
[2020/45] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 26.02.2021 | ||
Former | Grant of patent is intended Status updated on 27.10.2020 | ||
Former | Examination is in progress Status updated on 18.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do, 443-742 / KR | [2012/39] |
Former [2011/25] | For all designated states Samsung Electronics Co., Ltd. 416 Maetan-dong, Yeongtong-gu Suwon-si, Gyeonggi-do 506-762 / KR | Inventor(s) | 01 /
Kim, Jin Woo 138-2302, Jamsil els Apt. 19, Jamsil-dong Songpa-gu Seoul / KR | 02 /
Park, Jae Chan 104-1101, LG XI Apt., Jukhyeon Maeul, Bojeong-dong, Giheung-gu Yongin-si Gyeonggi-do / KR | 03 /
Park, Sung Min 302-201, Imgwang Kukdong Apt., Sinjeong Maeul 1018 Pungdeokcheon-dong, Suji-gu Yongin-si Gyeonggi-do / KR | 04 /
Park, Young Kyoung GreenD308, Samsung Advanced Institute of Technology Nongseo-dong, Giheung-gu Yongin-si Gyeonggi-do / KR | [2021/13] |
Former [2011/25] | 01 /
Kim, Jin Woo 138-2302, Jamsil els Apt. 19, Jamsil-dong Songpa-gu Seoul / KR | ||
02 /
Park, Jae Chan 104-1101, LG XI Apt., Jukhyeon Maeul, Bojeong-dong, Giheung-gu Yongin-si Gyeonggi-do / KR | |||
03 /
Park, Sung Min 302-201, Imgwang Kukdong Apt., Sinjeong Maeul 1018 Pungdeokcheon-dong, Suji-gi Yongin-si Gyeonggi-do / KR | |||
04 /
Park, Young Kyoung GreenD308, Samsung Advanced Institute of Technology Nongseo-dong, Giheung-gu Yongin-si Gyeonggi-do / KR | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2021/13] |
Former [2011/25] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Leopoldstrasse 4 80802 München / DE | Application number, filing date | 10195031.9 | 15.12.2010 | [2011/25] | Priority number, date | KR20090124803 | 15.12.2009 Original published format: KR 20090124803 | [2011/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2336291 | Date: | 22.06.2011 | Language: | EN | [2011/25] | Type: | B1 Patent specification | No.: | EP2336291 | Date: | 31.03.2021 | Language: | EN | [2021/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.04.2011 | Classification | IPC: | C12M1/04, C12P7/10, D21C1/06, D21C3/04, C12M1/33 | [2020/45] | CPC: |
C12P7/08 (EP,US);
C12P7/06 (KR);
C12M41/12 (EP,US);
C12M45/02 (EP,US);
C12M45/04 (EP);
C12M45/06 (EP,US);
C12P7/10 (EP);
C12P7/16 (KR);
D21C1/00 (US);
D21C1/02 (EP,US);
D21C1/04 (EP,US);
D21C1/06 (EP,US);
D21C1/10 (US);
D21C3/20 (EP,US);
B01J8/10 (US);
|
Former IPC [2011/25] | C12M1/04, C12P7/06, D21C3/02, D21C3/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/13] |
Former [2011/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Vorrichtung zur Vorbehandlung von Biomasse mittels Innenwärme | [2020/45] | English: | Apparatus for pretreating biomass using internal heat | [2020/45] | French: | Appareil permettant de prétraiter la biomasse à l'aide de la chaleur interne | [2020/45] |
Former [2011/25] | Verfahren und Vorrichtung zur Vorbehandlung von Biomasse mittels Innenwärme | ||
Former [2011/25] | Method and apparatus for pretreating biomass using internal heat | ||
Former [2011/25] | Procédé et appareil permettant de prétraiter la biomasse à l'aide de la chaleur interne | Examination procedure | 15.12.2011 | Amendment by applicant (claims and/or description) | 15.12.2011 | Examination requested [2012/04] | 21.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 27.03.2017 | Reply to a communication from the examining division | 18.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.10.2019 | Reply to a communication from the examining division | 20.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 15.05.2020 | Reply to a communication from the examining division | 28.10.2020 | Communication of intention to grant the patent | 23.02.2021 | Fee for grant paid | 23.02.2021 | Fee for publishing/printing paid | 23.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.11.2016 | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 30.09.2012 | Renewal fee patent year 03 | 23.12.2013 | Renewal fee patent year 04 | 26.11.2014 | Renewal fee patent year 05 | 23.12.2015 | Renewal fee patent year 06 | 28.12.2016 | Renewal fee patent year 07 | 27.12.2017 | Renewal fee patent year 08 | 21.12.2018 | Renewal fee patent year 09 | 20.12.2019 | Renewal fee patent year 10 | 28.12.2020 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.12.2010 | AL | 31.03.2021 | AT | 31.03.2021 | CY | 31.03.2021 | CZ | 31.03.2021 | DK | 31.03.2021 | EE | 31.03.2021 | ES | 31.03.2021 | FI | 31.03.2021 | GR | 31.03.2021 | HR | 31.03.2021 | IT | 31.03.2021 | LT | 31.03.2021 | LV | 31.03.2021 | MC | 31.03.2021 | MK | 31.03.2021 | MT | 31.03.2021 | NL | 31.03.2021 | PL | 31.03.2021 | RO | 31.03.2021 | RS | 31.03.2021 | SE | 31.03.2021 | SI | 31.03.2021 | SK | 31.03.2021 | SM | 31.03.2021 | TR | 31.03.2021 | BG | 30.06.2021 | NO | 30.06.2021 | IS | 31.07.2021 | PT | 02.08.2021 | GB | 15.12.2021 | IE | 15.12.2021 | LU | 15.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | FR | 31.12.2021 | LI | 31.12.2021 | [2024/41] |
Former [2024/29] | HU | 15.12.2010 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
GR | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
MK | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
TR | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2024/22] | HU | 15.12.2010 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
GR | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
MK | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/36] | HU | 15.12.2010 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
GR | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 15.12.2010 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/24] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
FR | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
BE | 31.12.2021 | ||
FR | 31.12.2021 | ||
Former [2022/48] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
IE | 15.12.2021 | ||
LU | 15.12.2021 | ||
Former [2022/47] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 15.12.2021 | ||
LU | 15.12.2021 | ||
Former [2022/46] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
LU | 15.12.2021 | ||
Former [2022/36] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/33] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/29] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/23] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/10] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
IS | 29.12.2021 | ||
Former [2022/08] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/07] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/52] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/51] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/50] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
Former [2021/48] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/47] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/46] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/38] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/37] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/36] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/35] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
NO | 30.06.2021 | ||
Former [2021/33] | FI | 31.03.2021 | |
NO | 30.06.2021 | Documents cited: | Search | [XI]US2003068415 (TAYLOR FRANK [US], et al) [X] 1,5,7-10,13 * claims 1-14 * * page 2, paragraph 18 * * page 3, paragraph 28; figure 1 * [I] 2-4,6,11,12; | [X]US2009053771 (DALE BRUCE [US], et al) [X] 1,14 * page 6, paragraph 59 * * page 4, paragraph 41 * * claims 1-20 *; | [X]CA2136143 (HEINZ ELROY [CA]) [X] 1 * claims 1-9 * * page 4, line 6 - line 8 * | [X] - SULBARAN-DE-FERRER B ET AL, "ENZYMATIC HYDROLYSIS OF AMMONIA-TREATED RICE STRAW", APPLIED BIOCHEMISTRY AND BIOTECHNOLOGY, THE HUMANA PRESS, INC, US, (20030101), vol. 105-108, doi:10.1385/ABAB:105:1-3:155, ISSN 0273-2289, pages 155 - 164, XP009056737 [X] 1,2,7-11,14,15,17,19,20 * page 156 - page 157 * * page 162, paragraph l - page 164, line 5 * DOI: http://dx.doi.org/10.1385/ABAB:105:1-3:155 | Examination | US3726756 | US3740311 | US4064276 | WO0214598 | US2009056889 |