Extract from the Register of European Patents

EP About this file: EP2437019

EP2437019 - Method for use when carrying out combustion in an industrial furnace [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.10.2013
Database last updated on 21.03.2026
Most recent event   Tooltip03.07.2015Lapse of the patent in a contracting state
New state(s): MK
published on 05.08.2015  [2015/32]
Applicant(s)For all designated states
Linde AG
Klosterhofstrasse 1
80331 München / DE
[2012/14]
Inventor(s)01 / Ekman, Tomas
Risvägen 10
132 37 Saltsjö-Boo / SE
02 / Lugnet, Anders
Ösbylund 5542
762 92 Rimbo / SE
 [2012/14]
Representative(s)Gellner, Bernd
Linde GmbH
Intellectual Property EMEA
Dr.-Carl-von-Linde-Straße 6-14
82049 Pullach / DE
[N/P]
Former [2012/14]Gellner, Bernd
Linde AG Legal Services Intellectual Property Dr.-Carl-von-Linde-Strasse 6-14
82049 Pullach / DE
Application number, filing date10196090.421.12.2010
[2012/14]
Priority number, dateSE2010005101930.09.2010         Original published format: SE 1051019
[2012/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2437019
Date:04.04.2012
Language:EN
[2012/14]
Type: B1 Patent specification 
No.:EP2437019
Date:12.12.2012
Language:EN
[2012/50]
Search report(s)(Supplementary) European search report - dispatched on:EP17.03.2011
ClassificationIPC:F27B9/30, C03B5/235
[2012/14]
CPC:
F27B9/3011 (EP,US); F23C7/00 (SE); F23C99/00 (KR);
C03B5/2353 (EP,US); F23C5/08 (SE); F23L7/00 (KR);
F23L7/007 (SE); F23L9/00 (SE); F27D7/00 (KR);
Y02E20/34 (EP); Y02P40/50 (EP,US); Y02P40/57 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/14]
TitleGerman:Verfahren zur Verwendung beim Ausführen eines Brennvorgangs in einem Industrieofen[2012/14]
English:Method for use when carrying out combustion in an industrial furnace[2012/14]
French:Procédé d'utilisation lors de la combustion dans un four industriel[2012/14]
Examination procedure22.03.2012Amendment by applicant (claims and/or description)
22.03.2012Examination requested  [2012/18]
20.08.2012Communication of intention to grant the patent
25.10.2012Fee for grant paid
25.10.2012Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  20.08.2012
Opposition(s)13.09.2013No opposition filed within time limit [2013/47]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL12.12.2012
CY12.12.2012
EE12.12.2012
HR12.12.2012
IT12.12.2012
LT12.12.2012
LV12.12.2012
MK12.12.2012
MT12.12.2012
RS12.12.2012
SI12.12.2012
SM12.12.2012
IE21.12.2012
LU21.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
PT12.04.2013
[2015/32]
Former [2014/27]AL12.12.2012
CY12.12.2012
EE12.12.2012
HR12.12.2012
IT12.12.2012
LT12.12.2012
LV12.12.2012
MT12.12.2012
RS12.12.2012
SI12.12.2012
SM12.12.2012
IE21.12.2012
LU21.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
PT12.04.2013
Former [2014/03]AL12.12.2012
CY12.12.2012
EE12.12.2012
HR12.12.2012
IT12.12.2012
LT12.12.2012
LV12.12.2012
MT12.12.2012
RS12.12.2012
SI12.12.2012
IE21.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
PT12.04.2013
Former [2013/52]AL12.12.2012
CY12.12.2012
EE12.12.2012
HR12.12.2012
LT12.12.2012
LV12.12.2012
MT12.12.2012
RS12.12.2012
SI12.12.2012
IE21.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
PT12.04.2013
Former [2013/51]AL12.12.2012
EE12.12.2012
HR12.12.2012
LT12.12.2012
LV12.12.2012
MT12.12.2012
RS12.12.2012
SI12.12.2012
IE21.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
PT12.04.2013
Former [2013/47]EE12.12.2012
LT12.12.2012
LV12.12.2012
RS12.12.2012
SI12.12.2012
IE21.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
PT12.04.2013
Former [2013/40]EE12.12.2012
LT12.12.2012
LV12.12.2012
RS12.12.2012
SI12.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
PT12.04.2013
Former [2013/35]EE12.12.2012
LT12.12.2012
LV12.12.2012
RS12.12.2012
SI12.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
Former [2013/34]LT12.12.2012
LV12.12.2012
RS12.12.2012
SI12.12.2012
MC31.12.2012
BG12.03.2013
GR13.03.2013
IS12.04.2013
Former [2013/33]LT12.12.2012
LV12.12.2012
RS12.12.2012
SI12.12.2012
MC31.12.2012
GR13.03.2013
Former [2013/32]LT12.12.2012
LV12.12.2012
RS12.12.2012
SI12.12.2012
GR13.03.2013
Former [2013/26]LT12.12.2012
LV12.12.2012
SI12.12.2012
GR13.03.2013
Former [2013/24]LT12.12.2012
LV12.12.2012
GR13.03.2013
Former [2013/23]LT12.12.2012
LV12.12.2012
Former [2013/20]LT12.12.2012
Documents cited:Search[A] US6350118  (PHILIPPE LOUIS et al.) [A] 1-13 * figure 1 * * column 1, line 36 - line 40 * * column 2 - column 3 *
 [A] DE3406956  (MESSER GRIESHEIM GMBH et al.) [A] 1-13 * page 5, line 21 - page 7, line 7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.