EP2458793 - Method of exchanging routing information between network nodes in a packet switched network [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.08.2014 Database last updated on 06.07.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states ALCATEL LUCENT 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | [2014/34] |
Former [2012/22] | For all designated states Alcatel Lucent 3, avenue Octave Gréard 75007 Paris / FR | Inventor(s) | 01 /
Puricelli, Paolo Via Vittorio Emanuele, 43 20867 Caponago / IT | 02 /
Ciammarughi, Laura Via Vittorio Emanuele, 43 20867 Caponago / IT | [2013/29] |
Former [2012/22] | 01 /
Puricelli, Paolo Via Vittorio Emanuele, 43 20040 Caponago / IT | ||
02 /
Ciammarughi, Laura Via Vittorio Emanuele, 43 20040 Caponago / IT | Representative(s) | Mildner, Volker, et al Alcatel-Lucent Intellectual Property & Standards 70430 Stuttgart / DE | [2012/22] | Application number, filing date | 10306291.5 | 24.11.2010 | [2012/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2458793 | Date: | 30.05.2012 | Language: | EN | [2012/22] | Type: | B1 Patent specification | No.: | EP2458793 | Date: | 25.09.2013 | Language: | EN | [2013/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.03.2011 | Classification | IPC: | H04L12/46, H04L12/721, H04L12/781, H04L12/741, H04L12/751 | [2013/27] | CPC: |
H04L45/54 (EP);
H04L12/4633 (EP);
H04L45/03 (EP);
H04L45/124 (EP);
H04L45/52 (EP);
H04L45/70 (EP)
|
Former IPC [2012/22] | H04L12/56 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/22] | Title | German: | Verfahren zum Austauschen von Routinginformationen zwischen Netzknoten in einem Paketvermittlungsnetz | [2012/22] | English: | Method of exchanging routing information between network nodes in a packet switched network | [2012/22] | French: | Procédé d'échange d'information d'acheminement entre noeuds de réseau dans un réseau commuté par paquets | [2012/22] | Examination procedure | 28.11.2012 | Amendment by applicant (claims and/or description) | 30.11.2012 | Examination requested [2013/02] | 20.06.2013 | Communication of intention to grant the patent | 13.08.2013 | Fee for grant paid | 13.08.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.06.2013 | Opposition(s) | 26.06.2014 | No opposition filed within time limit [2014/36] | Fees paid | Renewal fee | 23.11.2012 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Rights in Rem or Legal Means of Execution | ID: | 01 | For: | all designated states | Date: | 10.04.2013 | [2013/40] | Lapses during opposition Tooltip | HU | 24.11.2010 | AL | 25.09.2013 | AT | 25.09.2013 | BE | 25.09.2013 | BG | 25.09.2013 | CY | 25.09.2013 | CZ | 25.09.2013 | DK | 25.09.2013 | EE | 25.09.2013 | ES | 25.09.2013 | FI | 25.09.2013 | HR | 25.09.2013 | IT | 25.09.2013 | LT | 25.09.2013 | LV | 25.09.2013 | MC | 25.09.2013 | MK | 25.09.2013 | MT | 25.09.2013 | NL | 25.09.2013 | PL | 25.09.2013 | RO | 25.09.2013 | RS | 25.09.2013 | SE | 25.09.2013 | SI | 25.09.2013 | SK | 25.09.2013 | SM | 25.09.2013 | TR | 25.09.2013 | IE | 24.11.2013 | LU | 24.11.2013 | NO | 25.12.2013 | GR | 26.12.2013 | IS | 25.01.2014 | PT | 27.01.2014 | [2018/46] |
Former [2015/41] | HU | 24.11.2010 | |
AT | 25.09.2013 | ||
BE | 25.09.2013 | ||
BG | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
DK | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
MK | 25.09.2013 | ||
MT | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
SM | 25.09.2013 | ||
TR | 25.09.2013 | ||
IE | 24.11.2013 | ||
LU | 24.11.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2015/34] | HU | 24.11.2010 | |
AT | 25.09.2013 | ||
BE | 25.09.2013 | ||
BG | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
DK | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
MK | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
SM | 25.09.2013 | ||
TR | 25.09.2013 | ||
IE | 24.11.2013 | ||
LU | 24.11.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2015/33] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
DK | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
MK | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
SM | 25.09.2013 | ||
TR | 25.09.2013 | ||
IE | 24.11.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2015/32] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
DK | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
MK | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
SM | 25.09.2013 | ||
TR | 25.09.2013 | ||
IE | 24.11.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2015/25] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
DK | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
SM | 25.09.2013 | ||
IE | 24.11.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2014/48] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
DK | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
IE | 24.11.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2014/41] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
DK | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2014/38] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
IT | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2014/33] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
MC | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2014/28] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
PT | 27.01.2014 | ||
Former [2014/26] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CY | 25.09.2013 | ||
CZ | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
Former [2014/24] | AT | 25.09.2013 | |
BE | 25.09.2013 | ||
CZ | 25.09.2013 | ||
EE | 25.09.2013 | ||
ES | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
NL | 25.09.2013 | ||
PL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
Former [2014/23] | BE | 25.09.2013 | |
CZ | 25.09.2013 | ||
EE | 25.09.2013 | ||
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
NL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
SK | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
IS | 25.01.2014 | ||
Former [2014/22] | BE | 25.09.2013 | |
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
NL | 25.09.2013 | ||
RO | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
Former [2014/18] | BE | 25.09.2013 | |
FI | 25.09.2013 | ||
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
Former [2014/12] | FI | 25.09.2013 | |
HR | 25.09.2013 | ||
LT | 25.09.2013 | ||
LV | 25.09.2013 | ||
RS | 25.09.2013 | ||
SE | 25.09.2013 | ||
SI | 25.09.2013 | ||
NO | 25.12.2013 | ||
GR | 26.12.2013 | ||
Former [2014/09] | HR | 25.09.2013 | |
LT | 25.09.2013 | ||
SE | 25.09.2013 | ||
NO | 25.12.2013 | ||
Former [2014/08] | LT | 25.09.2013 | |
NO | 25.12.2013 | ||
Former [2014/07] | NO | 25.12.2013 | Documents cited: | Search | [I]EP1392026 (NORTEL NETWORKS LTD [CA]) [I] 1-8 * abstract * * paragraph [0020] - paragraph [0050] * * paragraph [0058] - paragraph [0134] * * figures 1A-2, 24A-G *; | [A]EP2175593 (ALCATEL LUCENT [FR]) [A] 1-8 * abstract * * paragraph [0012] - paragraph [0088] * * figure 5 *; | [A] - CHRISTIAN P ET AL, "IS-IS Automatic Encapsulation; draft-ietf-isis-auto-encap-00.txt", IETF STANDARD-WORKING-DRAFT, INTERNET ENGINEERING TASK FORCE, IETF, CH, (20020701), vol. isis, ISSN 0000-0004, XP015021579 [A] 1-8 * abstract, Chapters 2-4, Annex A * | [A] - PRZYGIENDA Z2 SAGL N SHEN CISCO SYSTEMS N SHETH JUNIPER NETWORKS T, "M-ISIS: Multi Topology (MT) Routing in Intermediate System to Intermediate Systems (IS-ISs); rfc5120.txt", IETF STANDARD, INTERNET ENGINEERING TASK FORCE, IETF, CH, (20080201), ISSN 0000-0003, XP015055189 [A] 1-8 * the whole document * |