EP2382304 - FERMENTER FEED SYSTEM FOR FERMENTABLE BIOMASS OF A BIOGAS SYSTEM AND METHOD FOR OPERATING THE FEED SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.01.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 07.02.2020 | ||
Former | Grant of patent is intended Status updated on 25.09.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states BTS Biogas Srl/GmbH St. Lorenznerstrasse 34 39031 Bruneck / IT | [2020/08] |
Former [2013/51] | For all designated states Niederbacher, Michael Jacobiweg 6 39031 Bruneck / IT | ||
Former [2011/44] | For all designated states Niederbacher, Michael Andreas Hofer Strasse 3 39031 Bruneck / IT | Inventor(s) | 01 /
Niederbacher, Michael Jacobiweg 6 39031 Bruneck / IT | [2020/08] |
Former [2011/44] | 01 /
see applicant ... | Representative(s) | Liebl, Thomas Neubauer - Liebl - Bierschneider - Massinger Münchener Straße 49 85051 Ingolstadt / DE | [N/P] |
Former [2011/44] | Liebl, Thomas Neubauer - Liebl - Bierschneider Patentanwälte Münchener Straße 49 85051 Ingolstadt / DE | Application number, filing date | 10702430.9 | 27.01.2010 | [2020/11] | WO2010EP00497 | Priority number, date | EP20090001148 | 28.01.2009 Original published format: EP 09001148 | [2011/44] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2010086158 | Date: | 05.08.2010 | Language: | DE | [2010/31] | Type: | A2 Application without search report | No.: | EP2382304 | Date: | 02.11.2011 | Language: | DE | The application published by WIPO in one of the EPO official languages on 05.08.2010 takes the place of the publication of the European patent application. | [2011/44] | Type: | B1 Patent specification | No.: | EP2382304 | Date: | 11.03.2020 | Language: | DE | [2020/11] | Search report(s) | International search report - published on: | EP | 29.12.2010 | Classification | IPC: | C12M1/107, C12M1/113 | [2011/44] | CPC: |
C12M21/04 (EP,US);
C12M41/12 (EP,US);
C12M41/40 (EP,US);
C12M45/02 (EP,US);
Y02E50/30 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/11] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | FERMENTER-BESCHICKUNGSANLAGE FÜR VERGÄRBARE BIOMASSE EINER BIOGASANLAGE UND VERFAHREN ZUM BETRIEB DER BESCHICKUNGSANLAGE | [2011/44] | English: | FERMENTER FEED SYSTEM FOR FERMENTABLE BIOMASS OF A BIOGAS SYSTEM AND METHOD FOR OPERATING THE FEED SYSTEM | [2011/44] | French: | INSTALLATION DE CHARGEMENT POUR FERMENTEUR POUR UNE BIOMASSE FERMENTABLE D'UNE INSTALLATION DE PRODUCTION DE BIOGAZ, ET PROCÉDÉ DE FONCTIONNEMENT DE CETTE INSTALLATION | [2011/44] | Entry into regional phase | 11.06.2011 | National basic fee paid | 11.06.2011 | Designation fee(s) paid | 11.06.2011 | Examination fee paid | Examination procedure | 11.06.2011 | Examination requested [2011/44] | 05.03.2012 | Amendment by applicant (claims and/or description) | 14.06.2012 | Despatch of a communication from the examining division (Time limit: M04) | 16.10.2012 | Reply to a communication from the examining division | 26.10.2015 | Despatch of a communication from the examining division (Time limit: M06) | 04.05.2016 | Reply to a communication from the examining division | 26.09.2019 | Communication of intention to grant the patent | 24.01.2020 | Fee for grant paid | 24.01.2020 | Fee for publishing/printing paid | 24.01.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.06.2012 | Opposition(s) | 14.12.2020 | No opposition filed within time limit [2021/07] | Fees paid | Renewal fee | 30.01.2012 | Renewal fee patent year 03 | 28.01.2013 | Renewal fee patent year 04 | 17.01.2014 | Renewal fee patent year 05 | 26.01.2015 | Renewal fee patent year 06 | 27.01.2016 | Renewal fee patent year 07 | 30.01.2017 | Renewal fee patent year 08 | 29.01.2018 | Renewal fee patent year 09 | 29.01.2019 | Renewal fee patent year 10 | 29.01.2020 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.01.2010 | CY | 11.03.2020 | CZ | 11.03.2020 | DK | 11.03.2020 | EE | 11.03.2020 | ES | 11.03.2020 | FI | 11.03.2020 | HR | 11.03.2020 | LT | 11.03.2020 | LV | 11.03.2020 | MC | 11.03.2020 | MK | 11.03.2020 | MT | 11.03.2020 | NL | 11.03.2020 | PL | 11.03.2020 | RO | 11.03.2020 | SE | 11.03.2020 | SI | 11.03.2020 | SK | 11.03.2020 | SM | 11.03.2020 | BG | 11.06.2020 | NO | 11.06.2020 | GR | 12.06.2020 | IS | 11.07.2020 | PT | 05.08.2020 | [2024/41] |
Former [2024/22] | HU | 27.01.2010 | |
CY | 11.03.2020 | ||
CZ | 11.03.2020 | ||
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
MC | 11.03.2020 | ||
MK | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2023/27] | HU | 27.01.2010 | |
CY | 11.03.2020 | ||
CZ | 11.03.2020 | ||
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
MC | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2023/24] | CY | 11.03.2020 | |
CZ | 11.03.2020 | ||
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
MC | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2021/40] | CZ | 11.03.2020 | |
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
MC | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2021/13] | CZ | 11.03.2020 | |
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2021/08] | CZ | 11.03.2020 | |
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/50] | CZ | 11.03.2020 | |
EE | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/49] | CZ | 11.03.2020 | |
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/48] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
SE | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/47] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
Former [2020/46] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
Former [2020/45] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
Former [2020/39] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
Former [2020/38] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
SE | 11.03.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
Former [2020/37] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
SE | 11.03.2020 | ||
NO | 11.06.2020 | ||
Former [2020/35] | FI | 11.03.2020 | |
NO | 11.06.2020 | Cited in | International search | [A]EP0201928 (NAGAO MASAMICHI) [A] 1,11 * page 2 - page 6 *; | [A]DE3844700 (BOEHNENSIEKER FRANZ [DE]) [A] 1,11 * column 1, lines 58-63 * * column 2, lines 26-32,48-58 *; | [A]EP0555792 (ASAM ERICH [DE]) [A] 1,11 * column 2 - column 3 * * figure -; claim - *; | [A]EP0613870 (ANALYSA BODENBERATUNG [CH]) [A] 1,11 * column 1, lines 3-8 * * column 4, lines 11,12 * * column 5, lines 1-17 * * column 10, lines 48-50 * * column 11, lines 23-27 * * column 13, line 55 - column 14, line 19 * * figure -; claim - *; | [A]EP0781742 (KONISHI TOSHIAKI [JP], et al) [A] 1,11 * column 3 * * column 5, lines 20-27 * * column 9, lines 1-10 * * column 10, lines 26-32 * * figure -; claim - *; | [A]EP1125894 (FRIEDRICH BAUER GMBH ING [AT]) [A] 1,11 * paragraphs [0008] - [0012] - [0022] *; | [A]US2005026262 (YOSHITANI JUN [US], et al) [A] 1,11 * paragraphs [0002] , [0012] , [0013] , [0017] ** figure -; claim - *; | [A]WO2005028375 (BIONIK GMBH INNOVATIVE TECHNIK [DE], et al) [A] 1,11 * page 1, paragraphs 4,5 * * page 2, paragraphs 1,2 * * page 3, paragraph 2 * * page 4, paragraphs 2,5 * * page 9, paragraphs 3,4 * * figure -; claim - *; | [A]WO2008029163 (NASAMAX LTD [BS], et al) [A] 1,11 * the whole document *; | [AD]EP1978086 (STIRL ANLAGENTECHNIK GMBH [DE]) [AD] 1-11 * paragraphs [0005] , [0007] , [0012] - [0014] - [0018] * * figure -; claim - *; | [A]DE102007029700 (FELDMANN MICHAEL [DE]) [A] 1,11 * the whole document * | by applicant | EP0613870 | DE4444745 | DE19514975 | EP0781742 | EP1125894 | WO2005028375 | EP1978086 |