EP2409189 - ASSEMBLY COMPRISING AN ELECTRIC CONDUCTIVE TRACK CARRIER AND AN OPTOELECTRONIC COMPONENT AND METHOD FOR PRODUCING SUCH AN ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 12.07.2019 | ||
Former | Grant of patent is intended Status updated on 19.03.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Finisar Germany GmbH Reuchlinstraße 10/11 10553 Berlin / DE | [2019/45] |
Former [2019/16] | For all designated states u2t Photonics AG Reuchlinstr. 10/11 10553 Berlin / DE | ||
Former [2012/04] | For all designated states U2t Photonics Ag Reuchlinstr. 10-11 10553 Berlin / DE | Inventor(s) | 01 /
MATISS, Andreas Paretzer Strasse 1 10713 Berlin / DE | 02 /
JACOB, Alexander Kleineweg 18 12101 Berlin / DE | 03 /
LEONHARDT, Christoph Malmöer Str. 1 10439 Berlin / DE | [2012/04] | Representative(s) | Fischer, Uwe Patentanwalt Moritzstraße 22 13597 Berlin / DE | [2019/33] |
Former [2012/04] | Fischer, Uwe Patentanwalt Moritzstraße 22 13597 Berlin / DE | Application number, filing date | 10706902.3 | 21.01.2010 | [2019/33] | WO2010DE00079 | Priority number, date | DE20091013866 | 18.03.2009 Original published format: DE102009013866 | [2012/04] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2010105588 | Date: | 23.09.2010 | Language: | DE | [2010/38] | Type: | A1 Application with search report | No.: | EP2409189 | Date: | 25.01.2012 | Language: | DE | The application published by WIPO in one of the EPO official languages on 23.09.2010 takes the place of the publication of the European patent application. | [2012/04] | Type: | B1 Patent specification | No.: | EP2409189 | Date: | 14.08.2019 | Language: | DE | [2019/33] | Search report(s) | International search report - published on: | EP | 23.09.2010 | Classification | IPC: | G02B6/42, H05K1/02, H05K3/34 | [2019/12] | CPC: |
H05K1/0243 (EP,US);
G02B6/4201 (EP,US);
G02B6/4274 (EP,US);
H05K1/024 (EP,US);
H05K2201/09909 (EP,US);
H05K2201/10121 (EP,US);
|
Former IPC [2012/04] | G02B6/42 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/04] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | ANORDNUNG MIT EINEM ELEKTRISCHEN LEITERBAHNTRÄGER UND EINEM OPTOELEKTRONISCHEN BAUELEMENT SOWIE VERFAHREN ZUM HERSTELLEN EINER SOLCHEN ANORDNUNG | [2012/04] | English: | ASSEMBLY COMPRISING AN ELECTRIC CONDUCTIVE TRACK CARRIER AND AN OPTOELECTRONIC COMPONENT AND METHOD FOR PRODUCING SUCH AN ASSEMBLY | [2012/04] | French: | ENSEMBLE COMPRENANT UN SUPPORT DE PISTE CONDUCTRICE ÉLECTRIQUE ET UN COMPOSANT OPTOÉLECTRONIQUE AINSI QUE PROCÉDÉ POUR FABRIQUER UN TEL ENSEMBLE | [2012/04] | Entry into regional phase | 01.07.2011 | National basic fee paid | 01.07.2011 | Designation fee(s) paid | 01.07.2011 | Examination fee paid | Examination procedure | 07.06.2011 | Amendment by applicant (claims and/or description) | 01.07.2011 | Examination requested [2012/04] | 26.01.2015 | Despatch of a communication from the examining division (Time limit: M06) | 22.07.2015 | Reply to a communication from the examining division | 20.03.2019 | Communication of intention to grant the patent | 04.07.2019 | Fee for grant paid | 04.07.2019 | Fee for publishing/printing paid | 04.07.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.01.2015 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 16.01.2012 | Renewal fee patent year 03 | 23.01.2013 | Renewal fee patent year 04 | 22.01.2014 | Renewal fee patent year 05 | 27.01.2015 | Renewal fee patent year 06 | 28.01.2016 | Renewal fee patent year 07 | 24.01.2017 | Renewal fee patent year 08 | 24.01.2018 | Renewal fee patent year 09 | 24.01.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.01.2010 | CY | 14.08.2019 | CZ | 14.08.2019 | DK | 14.08.2019 | EE | 14.08.2019 | ES | 14.08.2019 | FI | 14.08.2019 | HR | 14.08.2019 | LT | 14.08.2019 | LV | 14.08.2019 | MC | 14.08.2019 | MK | 14.08.2019 | MT | 14.08.2019 | NL | 14.08.2019 | PL | 14.08.2019 | RO | 14.08.2019 | SE | 14.08.2019 | SI | 14.08.2019 | SK | 14.08.2019 | SM | 14.08.2019 | TR | 14.08.2019 | BG | 14.11.2019 | NO | 14.11.2019 | GR | 15.11.2019 | IS | 14.12.2019 | PT | 16.12.2019 | AT | 21.01.2020 | IE | 21.01.2020 | LU | 21.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | [2022/32] |
Former [2022/27] | HU | 21.01.2010 | |
CY | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
MT | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
AT | 21.01.2020 | ||
IE | 21.01.2020 | ||
LU | 21.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2021/25] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
AT | 21.01.2020 | ||
IE | 21.01.2020 | ||
LU | 21.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2021/08] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
IE | 21.01.2020 | ||
LU | 21.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/51] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
LU | 21.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/46] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
LU | 21.01.2020 | ||
Former [2020/39] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/37] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/36] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/27] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | CZ | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | DK | 14.08.2019 | |
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | DK | 14.08.2019 | |
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/22] | DK | 14.08.2019 | |
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/17] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/12] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/11] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
Former [2020/10] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NL | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
PT | 16.12.2019 | ||
Former [2020/09] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NL | 14.08.2019 | ||
NO | 14.11.2019 | ||
Former [2020/08] | LT | 14.08.2019 | |
NO | 14.11.2019 | Cited in | International search | [Y]WO0073831 (INFINEON TECHNOLOGIES AG [DE], et al) [Y] 6* the whole document *; | [X]US6377742 (GO HISAO [JP]) [X] 1,14 * column 4, line 62 - column 5, line 23; figures 7,8 *; | [X]US2003059177 (SUZUKI FUMITAKE [JP], et al) [X] 1,14 * paragraphs [0032] , [0050]; figures 1,10 *; | [XY]EP1885026 (JAPAN AVIATION ELECTRON [JP]) [X] 1-5,7,9-15 * the whole document * [Y] 6 |