EP2399006 - METHOD OF PRODUCING A ROTOR CONTAINING A PLURALITY OF BLADES AND ROTOR [Right-click to bookmark this link] | |||
Former [2011/52] | METHOD FOR THE PRODUCTION OF AN INTEGRALLY BLADED ROTOR, AND ROTOR | ||
[2017/11] | Status | No opposition filed within time limit Status updated on 29.06.2018 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 21.07.2017 | ||
Former | Grant of patent is intended Status updated on 05.07.2017 | ||
Former | Examination is in progress Status updated on 09.06.2017 | ||
Former | Grant of patent is intended Status updated on 07.03.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states MTU Aero Engines AG Dachauer Strasse 665 80995 München / DE | [2013/45] |
Former [2011/52] | For all designated states MTU Aero Engines GmbH Dachauer Strasse 665 80995 München / DE | Inventor(s) | 01 /
UIHLEIN, Thomas Richard-Graef-Weg 15 85221 Dachau / DE | 02 /
STEINHARDT, Erich Waldklausenweg 25a 81377 München / DE | [2011/52] | Representative(s) | (deleted) | [2011/52] | Application number, filing date | 10708092.1 | 30.01.2010 | [2017/34] | WO2010DE00100 | Priority number, date | DE20091010025 | 21.02.2009 Original published format: DE102009010025 | [2011/52] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2010094255 | Date: | 26.08.2010 | Language: | DE | [2010/34] | Type: | A1 Application with search report | No.: | EP2399006 | Date: | 28.12.2011 | Language: | DE | The application published by WIPO in one of the EPO official languages on 26.08.2010 takes the place of the publication of the European patent application. | [2011/52] | Type: | B1 Patent specification | No.: | EP2399006 | Date: | 23.08.2017 | Language: | DE | [2017/34] | Search report(s) | International search report - published on: | EP | 26.08.2010 | Classification | IPC: | F01D5/30, F01D5/06, B23K15/00, B23K35/30 | [2011/52] | CPC: |
B23K15/0053 (EP,US);
B23K15/0086 (EP,US);
B23K26/211 (EP,US);
B23K26/32 (EP,US);
B23K26/342 (EP,US);
B23K35/0238 (EP,US);
B23K35/3033 (EP,US);
F01D5/34 (EP,US);
B23K2101/001 (EP,US);
B23K2103/18 (EP,US);
B23K2103/26 (EP,US);
F05D2230/22 (EP,US);
F05D2230/233 (EP,US);
F05D2230/234 (EP,US);
F05D2250/232 (EP,US);
Y10T29/49316 (EP,US)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2017/34] |
Former [2011/52] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUM HERSTELLEN EINES INTEGRAL BESCHAUFELTEN ROTORS SOWIE ROTOR | [2011/52] | English: | METHOD OF PRODUCING A ROTOR CONTAINING A PLURALITY OF BLADES AND ROTOR | [2017/11] | French: | PROCÉDÉ DE FABRICATION D'UN ROTEUR AYANT DES AUBES ET ROTEUR | [2017/11] |
Former [2011/52] | METHOD FOR THE PRODUCTION OF AN INTEGRALLY BLADED ROTOR, AND ROTOR | ||
Former [2011/52] | PROCÉDÉ DE FABRICATION D'UN ROTOR À AUBAGE MONOBLOC ET ROTOR | Entry into regional phase | 04.05.2011 | National basic fee paid | 04.05.2011 | Designation fee(s) paid | 04.05.2011 | Examination fee paid | Examination procedure | 16.06.2010 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 04.05.2011 | Examination requested [2011/52] | 22.05.2012 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 30.05.2012 | Amendment by applicant (claims and/or description) | 10.07.2012 | Despatch of a communication from the examining division (Time limit: M04) | 09.11.2012 | Reply to a communication from the examining division | 25.04.2013 | Despatch of a communication from the examining division (Time limit: M04) | 05.08.2013 | Reply to a communication from the examining division | 22.08.2013 | Despatch of a communication from the examining division (Time limit: M04) | 16.12.2013 | Reply to a communication from the examining division | 08.03.2017 | Communication of intention to grant the patent | 02.06.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.06.2017 | Fee for grant paid | 28.06.2017 | Fee for publishing/printing paid | 11.07.2017 | Communication of intention to grant the patent | 18.07.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.07.2012 | Opposition(s) | 24.05.2018 | No opposition filed within time limit [2018/31] | Request for further processing for: | 30.05.2012 | Request for further processing filed | 30.05.2012 | Full payment received (date of receipt of payment) Request granted | 18.06.2012 | Decision despatched | Fees paid | Renewal fee | 25.01.2012 | Renewal fee patent year 03 | 30.01.2013 | Renewal fee patent year 04 | 30.01.2014 | Renewal fee patent year 05 | 29.01.2015 | Renewal fee patent year 06 | 28.01.2016 | Renewal fee patent year 07 | 30.01.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.01.2010 | CY | 23.08.2017 | CZ | 23.08.2017 | DK | 23.08.2017 | EE | 23.08.2017 | ES | 23.08.2017 | FI | 23.08.2017 | HR | 23.08.2017 | IT | 23.08.2017 | LT | 23.08.2017 | LV | 23.08.2017 | MC | 23.08.2017 | MK | 23.08.2017 | MT | 23.08.2017 | NL | 23.08.2017 | PL | 23.08.2017 | PT | 23.08.2017 | RO | 23.08.2017 | SI | 23.08.2017 | SK | 23.08.2017 | SM | 23.08.2017 | TR | 23.08.2017 | BG | 23.11.2017 | NO | 23.11.2017 | GR | 24.11.2017 | IS | 23.12.2017 | AT | 30.01.2018 | IE | 30.01.2018 | LU | 30.01.2018 | BE | 31.01.2018 | CH | 31.01.2018 | LI | 31.01.2018 | [2020/31] |
Former [2020/27] | HU | 30.01.2010 | |
CZ | 23.08.2017 | ||
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MC | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
PT | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
TR | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
AT | 30.01.2018 | ||
IE | 30.01.2018 | ||
LU | 30.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2020/16] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MC | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
TR | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
AT | 30.01.2018 | ||
IE | 30.01.2018 | ||
LU | 30.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/30] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MC | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
AT | 30.01.2018 | ||
IE | 30.01.2018 | ||
LU | 30.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/23] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
AT | 30.01.2018 | ||
IE | 30.01.2018 | ||
LU | 30.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2019/09] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
IE | 30.01.2018 | ||
LU | 30.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/52] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
LU | 30.01.2018 | ||
BE | 31.01.2018 | ||
CH | 31.01.2018 | ||
LI | 31.01.2018 | ||
Former [2018/50] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
LU | 30.01.2018 | ||
BE | 31.01.2018 | ||
Former [2018/47] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
LU | 30.01.2018 | ||
Former [2018/43] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
MT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
Former [2018/39] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SI | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
Former [2018/24] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
IT | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SK | 23.08.2017 | ||
SM | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
Former [2018/23] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
EE | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
RO | 23.08.2017 | ||
SK | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
Former [2018/21] | CZ | 23.08.2017 | |
DK | 23.08.2017 | ||
ES | 23.08.2017 | ||
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
Former [2018/12] | ES | 23.08.2017 | |
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
LT | 23.08.2017 | ||
LV | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
Former [2018/11] | ES | 23.08.2017 | |
FI | 23.08.2017 | ||
HR | 23.08.2017 | ||
LT | 23.08.2017 | ||
NL | 23.08.2017 | ||
PL | 23.08.2017 | ||
BG | 23.11.2017 | ||
NO | 23.11.2017 | ||
GR | 24.11.2017 | ||
IS | 23.12.2017 | ||
Former [2018/08] | FI | 23.08.2017 | |
LT | 23.08.2017 | ||
NL | 23.08.2017 | ||
NO | 23.11.2017 | ||
Former [2018/07] | LT | 23.08.2017 | |
NO | 23.11.2017 | Cited in | International search | [XI]DE102004032975 (MTU AERO ENGINES GMBH [DE]) [X] 1-5,9,10 * paragraph [0001] * * paragraph [0007] - paragraph [0024] * * figures 1,2 * [I] 8; | [I]WO2005075140 (MTU AERO ENGINES GMBH [DE], et al) [I] 1-4,9,10 * page 1 - page 4 * * figures 1,2 *; | [XP]EP2047938 (HITACHI PLANT TECHNOLOGIES LTD [JP]) [XP] 1-5,9,10 * paragraph [0001] * * paragraph [0006] - paragraph [0044] * * figures 1-7 *; | [A]US4096615 (CROSS KENNETH R) [A] 6,7 * figures 3,4 * * column 3, line 32 - line 55 *; | [A]EP2000631 (HONEYWELL INT INC [US]) [A] 6,7 * figures 1-7 * * paragraph [0005] - paragraph [0030] *; | [A]JPS62107866 (MITSUBISHI HEAVY IND LTD) [A] 6,7 * abstract *; | [A]US5038014 (PRATT VANON D [US], et al) [A] 1-10 * the whole document *; | [A]DE102004043746 (MTU AERO ENGINES GMBH [DE]) [A] 1-10 * the whole document * | by applicant | DE102004032975 | WO2005075140 | US4096615 | EP2000631 | JPS62107866 |