| EP2406913 - METHOD AND APPARATUS FOR CARRIER ASSIGNMENT, CONFIGURATION AND SWITCHING FOR MULTICARRIER WIRELESS COMMUNICATIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.04.2020 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 03.05.2019 | ||
| Former | Grant of patent is intended Status updated on 14.02.2019 | ||
| Former | Examination is in progress Status updated on 07.01.2019 | ||
| Former | Grant of patent is intended Status updated on 11.08.2018 | ||
| Former | Examination is in progress Status updated on 03.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states InterDigital Patent Holdings, Inc. 200 Bellevue Parkway Suite 300 Wilmington, DE 19809 / US | [2019/23] |
| Former [2013/15] | For all designated states InterDigital Patent Holdings, Inc. 200 Bellevue Parkway Suite 300 Wilmington, DE 19809 / US | ||
| Former [2012/03] | For all designated states Interdigital Patent Holdings, Inc. 3411 Silverside Road Concord Plaza Suite 105 Hagley Building Wilmington, Delaware 19810 / US | Inventor(s) | 01 /
TERRY, Stephen, E. 15 Summit Avenue Northport New York 11768 / US | 02 /
ZHANG, Guodong 14 Walnut Drive Syosset New York 11791 / US | 03 /
WANG, Jin 14 Leicester Court Princeton New Jersey 08540 / US | 04 /
WANG, Lei 13519 Ginger Glen Road San Diego California 92130 / US | [2012/03] | Representative(s) | AWA Denmark A/S Strandgade 56 1401 Copenhagen K / DK | [2019/23] |
| Former [2012/03] | Engdahl, Stefan AWAPATENT AB P.O. Box 45086 104 30 Stockholm / SE | Application number, filing date | 10710718.7 | 15.03.2010 | [2019/23] | WO2010US27304 | Priority number, date | US20090160106P | 13.03.2009 Original published format: US 160106 P | US20090160513P | 16.03.2009 Original published format: US 160513 P | [2012/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2010105254 | Date: | 16.09.2010 | Language: | EN | [2010/37] | Type: | A2 Application without search report | No.: | EP2406913 | Date: | 18.01.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.09.2010 takes the place of the publication of the European patent application. | [2012/03] | Type: | B1 Patent specification | No.: | EP2406913 | Date: | 05.06.2019 | Language: | EN | [2019/23] | Search report(s) | International search report - published on: | EP | 11.11.2010 | Classification | IPC: | H04L5/00, H04L1/18, H04L1/00, H04B7/06, H04W72/04, H04W36/00 | [2018/36] | CPC: |
H04L1/0023 (EP,CN,US);
H04W72/21 (KR);
H04W72/20 (US);
H04B7/0626 (KR,US);
H04B7/063 (KR);
H04B7/0632 (KR,US);
H04B7/0639 (KR);
H04L1/1812 (KR,US);
H04L5/003 (EP,CN,KR,US);
|
| Former IPC [2012/03] | H04L5/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/03] | Extension states | AL | Not yet paid | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG FÜR TRÄGERZUWEISUNG, KONFIGURATION UND SWITCHING FÜR DRAHTLOSE MEHRTRÄGER-KOMMUNIKATION | [2012/03] | English: | METHOD AND APPARATUS FOR CARRIER ASSIGNMENT, CONFIGURATION AND SWITCHING FOR MULTICARRIER WIRELESS COMMUNICATIONS | [2012/03] | French: | PROCÉDÉ ET APPAREIL D'ATTRIBUTION, DE CONFIGURATION ET DE COMMUTATION DE PORTEUSE POUR COMMUNICATIONS SANS FIL MULTIPORTEUSES | [2012/03] | Entry into regional phase | 14.09.2011 | National basic fee paid | 14.09.2011 | Designation fee(s) paid | 14.09.2011 | Examination fee paid | Examination procedure | 20.12.2010 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 14.09.2011 | Examination requested [2012/03] | 19.09.2013 | Amendment by applicant (claims and/or description) | 28.07.2014 | Despatch of a communication from the examining division (Time limit: M04) | 05.12.2014 | Reply to a communication from the examining division | 02.11.2015 | Despatch of a communication from the examining division (Time limit: M04) | 02.03.2016 | Reply to a communication from the examining division | 17.08.2016 | Despatch of a communication from the examining division (Time limit: M04) | 27.12.2016 | Reply to a communication from the examining division | 01.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 28.03.2018 | Reply to a communication from the examining division | 20.08.2018 | Communication of intention to grant the patent | 06.12.2018 | Fee for grant paid | 06.12.2018 | Fee for publishing/printing paid | 21.12.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 15.02.2019 | Communication of intention to grant the patent | 26.04.2019 | Fee for grant paid | 26.04.2019 | Fee for publishing/printing paid | 26.04.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP19160011.3 / EP3509243 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.07.2014 | Opposition(s) | 06.03.2020 | No opposition filed within time limit [2020/20] | Fees paid | Renewal fee | 14.03.2012 | Renewal fee patent year 03 | 11.03.2013 | Renewal fee patent year 04 | 12.03.2014 | Renewal fee patent year 05 | 24.03.2015 | Renewal fee patent year 06 | 23.03.2016 | Renewal fee patent year 07 | 23.03.2017 | Renewal fee patent year 08 | 23.03.2018 | Renewal fee patent year 09 | 22.03.2019 | Renewal fee patent year 10 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.03.2010 | AT | 05.06.2019 | CY | 05.06.2019 | CZ | 05.06.2019 | DK | 05.06.2019 | EE | 05.06.2019 | ES | 05.06.2019 | FI | 05.06.2019 | HR | 05.06.2019 | IT | 05.06.2019 | LT | 05.06.2019 | LV | 05.06.2019 | MC | 05.06.2019 | MK | 05.06.2019 | MT | 05.06.2019 | PL | 05.06.2019 | RO | 05.06.2019 | SE | 05.06.2019 | SI | 05.06.2019 | SK | 05.06.2019 | SM | 05.06.2019 | TR | 05.06.2019 | BG | 05.09.2019 | NO | 05.09.2019 | GR | 06.09.2019 | IS | 05.10.2019 | PT | 07.10.2019 | [2022/32] |
| Former [2022/27] | HU | 15.03.2010 | |
| AT | 05.06.2019 | ||
| CY | 05.06.2019 | ||
| CZ | 05.06.2019 | ||
| DK | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| IT | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| MC | 05.06.2019 | ||
| MT | 05.06.2019 | ||
| PL | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SI | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| SM | 05.06.2019 | ||
| TR | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| IS | 05.10.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/49] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| DK | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| IT | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| MC | 05.06.2019 | ||
| PL | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SI | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| SM | 05.06.2019 | ||
| TR | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| IS | 05.10.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/25] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| DK | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| IT | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| PL | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SI | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| SM | 05.06.2019 | ||
| TR | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| IS | 05.10.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/22] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| DK | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| IT | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| SM | 05.06.2019 | ||
| TR | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| IS | 05.10.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/17] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| IT | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| SM | 05.06.2019 | ||
| TR | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| IS | 05.10.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/13] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| IT | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| SM | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| IS | 05.10.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/12] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| IT | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| IS | 05.10.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/11] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| EE | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| SK | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/10] | AT | 05.06.2019 | |
| CZ | 05.06.2019 | ||
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| RO | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| PT | 07.10.2019 | ||
| Former [2020/09] | CZ | 05.06.2019 | |
| ES | 05.06.2019 | ||
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| Former [2019/51] | ES | 05.06.2019 | |
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| BG | 05.09.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| Former [2019/50] | ES | 05.06.2019 | |
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| LV | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| NO | 05.09.2019 | ||
| GR | 06.09.2019 | ||
| Former [2019/49] | ES | 05.06.2019 | |
| FI | 05.06.2019 | ||
| HR | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| NO | 05.09.2019 | ||
| Former [2019/48] | ES | 05.06.2019 | |
| FI | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| SE | 05.06.2019 | ||
| NO | 05.09.2019 | ||
| Former [2019/47] | ES | 05.06.2019 | |
| FI | 05.06.2019 | ||
| LT | 05.06.2019 | ||
| NO | 05.09.2019 | Cited in | International search | [IA] HUAWEI: "PUCCH design for carrier aggregation", 3GPP DRAFT; R1-090813, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Athens, Greece; 20090203, 3 February 2009 (2009-02-03), XP050318670 [I] 1-7,18-24 * the whole document *[A] 8-17,25-34 | [A] ZTE: "Uplink Control Channel Design for LTE-Advanced", 3GPP DRAFT; R1-090629 UPLINK CONTROL CHANNEL DESIGN FOR LTE-A, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Athens, Greece; 20090203, 3 February 2009 (2009-02-03), XP050318510 [A] 1-34 * the whole document * | [A] QUALCOMM EUROPE: "Notion of Anchor Carrier in LTE-A", 3GPP DRAFT; R1-090860, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Athens, Greece; 20090203, 3 February 2009 (2009-02-03), XP050318710 [A] 1-34 * the whole document * | [A] ZTE: "General control channel design for LTE-A", 3GPP DRAFT; R1-082848 GENERAL CONTROL CHANNEL DESIGN FOR LTE-A, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Jeju; 20080812, 12 August 2008 (2008-08-12), XP050316335 [A] 1-34 * the whole document * | [IA] NTT DOCOMO ET AL: "Uplink resource allocation scheme (dynamic scheduling)", 3GPP DRAFT; R2-062912, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Seoul, Korea; 20061005, 5 October 2006 (2006-10-05), XP050132430 [I] 8,9,11-14,16,17,25,26,28-31,33,34 * the whole document *[A] 1-7,10,15,18-24,27,32 | [A] MOTOROLA: "Control Channel Design Issues for Carrier Aggregation in LTE-A", 3GPP DRAFT; R1-090268, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Ljubljana; 20090108, 8 January 2009 (2009-01-08), XP050318195 [A] 1-34 * the whole document * | [A] TEXAS INSTRUMENTS: "Downlink and Uplink Control to Support Carrier Aggregation", 3GPP DRAFT; R1-090584 TI CARRIER AGGR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Athens, Greece; 20090203, 3 February 2009 (2009-02-03), XP050318474 [A] 1-34 * the whole document * | [A] LG ELECTRONICS: "Proposals and issues on the carrier aggregation and control signaling for LTE-A", 3GPP DRAFT; R1-084194 LTE A_CARRIER AGGREGATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Prague, Czech Republic; 20081105, 5 November 2008 (2008-11-05), XP050317483 [A] 1-34 * the whole document * | Examination | HUAWEI: "PUCCH design for carrier aggregation", 3GPP DRAFT; R1-090126, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, no. Ljubljana; 20090107, 7 January 2009 (2009-01-07), XP050318064 |