EP2443406 - METHOD AND APPARATUS FOR PRESSURIZED PRODUCT PRODUCTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.07.2019 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 10.08.2018 | ||
Former | Grant of patent is intended Status updated on 22.03.2018 | ||
Former | Examination is in progress Status updated on 02.06.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Praxair Technology, Inc. 10 Riverview Drive Danbury, CT 06810 / US | [2019/30] |
Former [2018/37] | For all designated states Praxair Technology, Inc. 39 Old Ridgebury Road Danbury, CT 06810 / US | ||
Former [2012/17] | For all designated states Praxair Technology, Inc. 39 Old Ridgebury Road Danbury, CT 06810 / US | Inventor(s) | 01 /
HOWARD, Henry, Edward 2020 Stony Point Road Grand Island, NY 14072 / US | 02 /
JIBB, Richard, John 3748 sage Court Wheatfield, NY 14120 / US | 03 /
PARSNICK, David, Ross 69 Hardt Lane Amherst, NY 14226 / US | 04 /
SKARE, Todd, Alan C/ Prado Del Rey, 101 Chalet 33 Pozuelo de Alarcon, 28223 / US | [2012/18] |
Former [2012/17] | 01 /
HOWARD, Henry, Edward 2020 Stony Point Road Grand Island, NY 14072 / US | ||
02 /
JIBB, Richard, John 209 Robin Road Amherst, NY 14228 / US | |||
03 /
PARSNICK, David, Ross 69 Hardt Lane Amherst, NY 14226 / US | |||
04 /
SKARE, Todd, Alan 127 S. Brooksedge Circle The Woodlands, TX 77382 / US | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater Königstraße 28 70173 Stuttgart / DE | [2018/37] |
Former [2012/17] | Schwan, Ivo Schwan Schwan Schorer Patentanwälte Bauerstrasse 22 80796 München / DE | Application number, filing date | 10714775.3 | 13.04.2010 | [2018/37] | WO2010US30870 | Priority number, date | US20090485235 | 16.06.2009 Original published format: US 485235 | [2012/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2010147698 | Date: | 23.12.2010 | Language: | EN | [2010/51] | Type: | A2 Application without search report | No.: | EP2443406 | Date: | 25.04.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.12.2010 takes the place of the publication of the European patent application. | [2012/17] | Type: | B1 Patent specification | No.: | EP2443406 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Search report(s) | International search report - published on: | EP | 04.08.2016 | Classification | IPC: | F25J3/04 | [2012/17] | CPC: |
F28F9/026 (EP,US);
F25J3/0409 (EP,US);
F25J3/04175 (EP,US);
F25J3/042 (EP,US);
F25J3/04278 (EP,US);
F25J3/04296 (EP,US);
F25J3/04412 (EP,US);
F25J3/0486 (EP,US);
F25J5/002 (EP,US);
F28D9/0093 (EP,US);
F25J2245/40 (EP,US);
F25J2270/14 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/17] | Extension states | AL | Not yet paid | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG VON PRODUKTEN UNTER DRUCK | [2012/17] | English: | METHOD AND APPARATUS FOR PRESSURIZED PRODUCT PRODUCTION | [2012/17] | French: | PROCÉDÉ ET APPAREIL POUR LA PRODUCTION D'UN PRODUIT PRESSURISÉ | [2012/17] | Entry into regional phase | 13.12.2011 | National basic fee paid | 13.12.2011 | Designation fee(s) paid | 13.12.2011 | Examination fee paid | Examination procedure | 13.12.2011 | Examination requested [2012/17] | 21.02.2017 | Amendment by applicant (claims and/or description) | 01.06.2017 | Despatch of a communication from the examining division (Time limit: M04) | 27.09.2017 | Reply to a communication from the examining division | 22.03.2018 | Communication of intention to grant the patent | 31.07.2018 | Fee for grant paid | 31.07.2018 | Fee for publishing/printing paid | 31.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.06.2017 | Opposition(s) | 13.06.2019 | No opposition filed within time limit [2019/34] | Fees paid | Renewal fee | 02.05.2012 | Renewal fee patent year 03 | 02.05.2013 | Renewal fee patent year 04 | 30.04.2014 | Renewal fee patent year 05 | 30.04.2015 | Renewal fee patent year 06 | 02.05.2016 | Renewal fee patent year 07 | 02.05.2017 | Renewal fee patent year 08 | 07.06.2018 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 30.04.2018 | 09   M06   Fee paid on   07.06.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.04.2010 | AT | 12.09.2018 | CY | 12.09.2018 | CZ | 12.09.2018 | DK | 12.09.2018 | EE | 12.09.2018 | FI | 12.09.2018 | HR | 12.09.2018 | LT | 12.09.2018 | LV | 12.09.2018 | MC | 12.09.2018 | MK | 12.09.2018 | MT | 12.09.2018 | NL | 12.09.2018 | PL | 12.09.2018 | RO | 12.09.2018 | SE | 12.09.2018 | SI | 12.09.2018 | SK | 12.09.2018 | SM | 12.09.2018 | TR | 12.09.2018 | BG | 12.12.2018 | NO | 12.12.2018 | GR | 13.12.2018 | IS | 12.01.2019 | PT | 12.01.2019 | GB | 13.04.2019 | IE | 13.04.2019 | LU | 13.04.2019 | BE | 30.04.2019 | CH | 30.04.2019 | LI | 30.04.2019 | [2022/31] |
Former [2021/34] | HU | 13.04.2010 | |
AT | 12.09.2018 | ||
CY | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
MT | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
GB | 13.04.2019 | ||
IE | 13.04.2019 | ||
LU | 13.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2021/32] | HU | 13.04.2010 | |
AT | 12.09.2018 | ||
CY | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
GB | 13.04.2019 | ||
IE | 13.04.2019 | ||
LU | 13.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2021/26] | AT | 12.09.2018 | |
CY | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
GB | 13.04.2019 | ||
IE | 13.04.2019 | ||
LU | 13.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/21] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
GB | 13.04.2019 | ||
IE | 13.04.2019 | ||
LU | 13.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/17] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
GB | 13.04.2019 | ||
LU | 13.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/11] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
GB | 13.04.2019 | ||
LU | 13.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/04] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
LU | 13.04.2019 | ||
Former [2020/02] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/37] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/34] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/26] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/23] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/22] | CZ | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/21] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/20] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/12] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/11] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/10] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/08] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
NO | 12.12.2018 | ||
Former [2019/07] | LT | 12.09.2018 | Cited in | International search | [A]US6053008 (ARMAN BAYRAM [US], et al) [A] 1-16 * figure 1 *; | [A]US2007209389 (PROSSER NEIL M [US]) [A] 1-16* figure 1 * |