EP2417835 - MESSAGE CONTROLLABLE LAMP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.08.2018 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 25.08.2017 | ||
Former | Grant of patent is intended Status updated on 27.07.2017 | ||
Former | Examination is in progress Status updated on 19.05.2017 | ||
Former | Grant of patent is intended Status updated on 12.01.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states NXP B.V. High Tech Campus 60 5656 AG Eindhoven / NL | [2012/07] | Inventor(s) | 01 /
KOPPELAAR, Arie Geert Cornelis c/o NXP B.V. Intellectual Property&Licensing Department High Tech Campus 32 NL-5656 AE Eindhoven / NL | 02 /
MOONEN, Oswald c/o NXP B.V. Intellectual Property&Licensing Department High Tech Campus 32 NL-5656 AE Eindhoven / NL | 03 /
FRIMOUT, Emmanuel David Lucas Michael c/o NXP B.V. Intellectual Property&Licensing Department High Tech Campus 32 NL-5656 AE Eindhoven / NL | 04 /
SYED, Aly Aamer c/o NXP B.V. Intellectual Property&Licensing Department High Tech Campus 32 NL-5656 AE Eindhoven / NL | 05 /
MATTHEIJSSEN, Paul c/o NXP B.V. Intellectual Property&Licensing Department High Tech Campus 32 NL-5656 AE Eindhoven / NL | 06 /
BRANDSMA, Ewout c/o NXP B.V. Intellectual Property&Licensing Department High Tech Campus 32 NL-5656 AE Eindhoven / NL | 07 /
KOOLEN, Gert-Jan c/o NXP B.V. Intellectual Property&Licensing Department High Tech Campus 32 NL-5656 AE Eindhoven / NL | [2012/07] | Representative(s) | Miles, John Richard NXP SEMICONDUCTORS Intellectual Property Group Abbey House 25 Clarendon Road Redhill, Surrey RH1 1QZ / GB | [2017/39] |
Former [2012/07] | Crawford, Andrew NXP Semiconductors Intellectual Property and Licensing Department Betchworth House 57-65 Station Road Redhill, Surrey RH1 1DL / GB | Application number, filing date | 10716103.6 | 07.04.2010 | [2017/39] | WO2010IB51496 | Priority number, date | EP20090157578 | 08.04.2009 Original published format: EP 09157578 | [2012/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010116327 | Date: | 14.10.2010 | Language: | EN | [2010/41] | Type: | A1 Application with search report | No.: | EP2417835 | Date: | 15.02.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.10.2010 takes the place of the publication of the European patent application. | [2012/07] | Type: | B1 Patent specification | No.: | EP2417835 | Date: | 27.09.2017 | Language: | EN | [2017/39] | Search report(s) | International search report - published on: | EP | 14.10.2010 | Classification | IPC: | H05B37/02 | [2012/07] | CPC: |
H05B47/19 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/07] | Extension states | AL | Not yet paid | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | MELDUNGSSTEUERBARE LAMPE | [2017/04] | English: | MESSAGE CONTROLLABLE LAMP | [2012/07] | French: | LAMPE CONTRÔLABLE PAR MESSAGE | [2017/34] |
Former [2012/07] | NACHRICHTENSTEUERBARE LAMPE | ||
Former [2012/07] | LAMPE COMMANDABLE PAR MESSAGE | Entry into regional phase | 08.11.2011 | National basic fee paid | 08.11.2011 | Designation fee(s) paid | 08.11.2011 | Examination fee paid | Examination procedure | 08.11.2011 | Examination requested [2012/07] | 01.06.2012 | Amendment by applicant (claims and/or description) | 27.01.2014 | Despatch of a communication from the examining division (Time limit: M04) | 05.06.2014 | Reply to a communication from the examining division | 13.12.2016 | Cancellation of oral proceeding that was planned for 14.12.2016 | 14.12.2016 | Date of oral proceedings (cancelled) | 13.01.2017 | Communication of intention to grant the patent | 11.05.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.07.2017 | Communication of intention to grant the patent | 10.08.2017 | Fee for grant paid | 10.08.2017 | Fee for publishing/printing paid | 10.08.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.01.2014 | Opposition(s) | 28.06.2018 | No opposition filed within time limit [2018/36] | Fees paid | Renewal fee | 02.05.2012 | Renewal fee patent year 03 | 02.05.2013 | Renewal fee patent year 04 | 30.04.2014 | Renewal fee patent year 05 | 30.04.2015 | Renewal fee patent year 06 | 02.05.2016 | Renewal fee patent year 07 | 02.05.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.04.2010 | AT | 27.09.2017 | CY | 27.09.2017 | CZ | 27.09.2017 | DK | 27.09.2017 | EE | 27.09.2017 | ES | 27.09.2017 | FI | 27.09.2017 | HR | 27.09.2017 | IT | 27.09.2017 | LT | 27.09.2017 | LV | 27.09.2017 | MC | 27.09.2017 | MK | 27.09.2017 | NL | 27.09.2017 | PL | 27.09.2017 | PT | 27.09.2017 | RO | 27.09.2017 | SE | 27.09.2017 | SI | 27.09.2017 | SK | 27.09.2017 | SM | 27.09.2017 | TR | 27.09.2017 | BG | 27.12.2017 | NO | 27.12.2017 | GR | 28.12.2017 | IS | 27.01.2018 | GB | 07.04.2018 | IE | 07.04.2018 | LU | 07.04.2018 | MT | 07.04.2018 | BE | 30.04.2018 | CH | 30.04.2018 | LI | 30.04.2018 | [2020/31] |
Former [2020/27] | HU | 07.04.2010 | |
AT | 27.09.2017 | ||
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
PT | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
TR | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
GB | 07.04.2018 | ||
IE | 07.04.2018 | ||
LU | 07.04.2018 | ||
MT | 07.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/16] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
TR | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
GB | 07.04.2018 | ||
IE | 07.04.2018 | ||
LU | 07.04.2018 | ||
MT | 07.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/08] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
GB | 07.04.2018 | ||
IE | 07.04.2018 | ||
LU | 07.04.2018 | ||
MT | 07.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/19] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
GB | 07.04.2018 | ||
IE | 07.04.2018 | ||
LU | 07.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/12] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
GB | 07.04.2018 | ||
LU | 07.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/08] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
LU | 07.04.2018 | ||
Former [2018/52] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/39] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/35] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/24] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
IT | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/23] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RO | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/21] | CZ | 27.09.2017 | |
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/15] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/12] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/11] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/10] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
SE | 27.09.2017 | ||
NO | 27.12.2017 | ||
Former [2018/08] | FI | 27.09.2017 | |
LT | 27.09.2017 | ||
NO | 27.12.2017 | ||
Former [2018/07] | LT | 27.09.2017 | |
NO | 27.12.2017 | Cited in | International search | [Y]US5352957 (WERNER WALTER [AT]) [Y] 5,6,8,9 * column 5, lines 1-37; figure 1 *; | [IY]EP1035755 (PATENT TREUHAND GES FUER ELEKTRISCHE GLUEHLAMPEN MBH [DE]) [I] 1-4,7,10-12 * column 1, paragraph 2 * * columns 4,5, paragraph 9 * * figure 1 * * column 2, paragraph 6 * [Y] 5,6,8,9; | [A]US2005258765 (RODRIGUEZ REGINALD J [US], et al) [A] 1-3 * page 2, paragraph 14 * * page 6, paragraph 50 ** page 7, paragraph 53; figure 5 * | Examination | WO9912400 | GB2336045 |