EP2417096 - Process for the synthesis of a propargylic alcohol [Right-click to bookmark this link] | |||
Former [2012/07] | PROCESS FOR THE SYNTHESIS OF A PROPARGYLIC ALCOHOL | ||
[2012/38] | Status | No opposition filed within time limit Status updated on 22.11.2013 Database last updated on 17.07.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): HU, LU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states Lonza Ltd Münchensteinerstrasse 38 4052 Basel / CH | [2012/07] | Inventor(s) | 01 /
CARREIRA, Erick Chapfstrasse 73 CH-8083 Zürich / CH | 02 /
CHINKOV, Nicka Eilat Strasse 8/4 32298 Haifa / IL | 03 /
WARM, Aleksander Route de Pro Long 35 CH-1974 Arbaz / CH | [2012/07] | Representative(s) | Riegler, Norbert Hermann, et al Lonza Ltd. Patent Department Münchensteinerstrasse 38 4052 Basel / CH | [N/P] |
Former [2012/07] | Riegler, Norbert Hermann, et al Lonza Ltd. Patent Department Münchensteinerstrasse 38 4052 Basel / CH | Application number, filing date | 10717046.6 | 09.04.2010 | WO2010EP02225 | Priority number, date | EP20090005215 | 09.04.2009 Original published format: EP 09005215 | US20090167908P | 09.04.2009 Original published format: US 167908 P | [2012/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010115639 | Date: | 14.10.2010 | Language: | EN | [2010/41] | Type: | A1 Application with search report | No.: | EP2417096 | Date: | 15.02.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.10.2010 takes the place of the publication of the European patent application. | [2012/07] | Type: | B1 Patent specification | No.: | EP2417096 | Date: | 16.01.2013 | Language: | EN | [2013/03] | Search report(s) | International search report - published on: | EP | 14.10.2010 | Classification | IPC: | C07C213/00 | [2012/07] | CPC: |
C07C213/00 (EP,US)
| C-Set: |
C07C213/00, C07C215/68 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/07] | Extension states | AL | Not yet paid | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | Verfahren zur Synthese eines Propargylalkohols | [2012/38] | English: | Process for the synthesis of a propargylic alcohol | [2012/38] | French: | Procédé pour la synthèse d'un alcool propargylique | [2012/38] |
Former [2012/07] | VERFAHREN ZUR SYNTHESE EINES PROPARGYLALKOHOLS | ||
Former [2012/07] | PROCESS FOR THE SYNTHESIS OF A PROPARGYLIC ALCOHOL | ||
Former [2012/07] | PROCEDE POUR LA SYNTHESE D'UN ALCOOL PROPARGYLIQUE | Entry into regional phase | 09.11.2011 | National basic fee paid | 09.11.2011 | Designation fee(s) paid | 09.11.2011 | Examination fee paid | Examination procedure | 09.11.2011 | Examination requested [2012/07] | 30.08.2012 | Communication of intention to grant the patent | 30.10.2012 | Fee for grant paid | 30.10.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 30.08.2012 | Opposition(s) | 17.10.2013 | No opposition filed within time limit [2013/52] | Fees paid | Renewal fee | 02.05.2012 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.04.2010 | AT | 16.01.2013 | BE | 16.01.2013 | CY | 16.01.2013 | CZ | 16.01.2013 | DK | 16.01.2013 | EE | 16.01.2013 | FI | 16.01.2013 | HR | 16.01.2013 | IT | 16.01.2013 | LT | 16.01.2013 | LV | 16.01.2013 | MC | 16.01.2013 | MK | 16.01.2013 | MT | 16.01.2013 | NL | 16.01.2013 | PL | 16.01.2013 | RO | 16.01.2013 | SE | 16.01.2013 | SI | 16.01.2013 | SK | 16.01.2013 | SM | 16.01.2013 | TR | 16.01.2013 | IE | 09.04.2013 | LU | 09.04.2013 | BG | 16.04.2013 | NO | 16.04.2013 | GR | 17.04.2013 | ES | 27.04.2013 | FR | 30.04.2013 | IS | 16.05.2013 | PT | 16.05.2013 | [2015/34] |
Former [2015/32] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
IT | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
MC | 16.01.2013 | ||
MK | 16.01.2013 | ||
MT | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
SM | 16.01.2013 | ||
TR | 16.01.2013 | ||
IE | 09.04.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
FR | 30.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2015/24] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
IT | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
MC | 16.01.2013 | ||
MT | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
SM | 16.01.2013 | ||
IE | 09.04.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
FR | 30.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2015/13] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
IT | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
MC | 16.01.2013 | ||
MT | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
IE | 09.04.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
FR | 30.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2014/20] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
IT | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
MC | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
IE | 09.04.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
FR | 30.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2014/11] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
IT | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
MC | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
FR | 30.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2014/03] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
IT | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
MC | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2014/01] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
MC | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2013/52] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CY | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2013/49] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
CZ | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
RO | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
SK | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2013/48] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
DK | 16.01.2013 | ||
EE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2013/41] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
FI | 16.01.2013 | ||
HR | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2013/40] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
FI | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
PT | 16.05.2013 | ||
Former [2013/38] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
FI | 16.01.2013 | ||
LT | 16.01.2013 | ||
LV | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
Former [2013/37] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
FI | 16.01.2013 | ||
LT | 16.01.2013 | ||
NL | 16.01.2013 | ||
PL | 16.01.2013 | ||
SE | 16.01.2013 | ||
SI | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
GR | 17.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
Former [2013/36] | AT | 16.01.2013 | |
BE | 16.01.2013 | ||
LT | 16.01.2013 | ||
PL | 16.01.2013 | ||
SE | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
ES | 27.04.2013 | ||
IS | 16.05.2013 | ||
Former [2013/35] | BE | 16.01.2013 | |
LT | 16.01.2013 | ||
SE | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
IS | 16.05.2013 | ||
Former [2013/34] | LT | 16.01.2013 | |
SE | 16.01.2013 | ||
BG | 16.04.2013 | ||
NO | 16.04.2013 | ||
IS | 16.05.2013 | ||
Former [2013/33] | LT | 16.01.2013 | |
NO | 16.04.2013 | Cited in | International search | [AD]WO9851676 (MERCK & CO INC [US], et al) [AD] 1-12 * examples 1,4,11; claims 22,23 *; | [AD]EP1614672 (SHANGHAI INST ORGANIC CHEM [CN]) [AD] 1-12 * claim 15 * | by applicant | - JIANG ET AL., TETRAHEDRON LETT., (2002), vol. 43, pages 8323 - 8325 | - J. ORG. CHEM., (2002), vol. 67, pages 9449 - 9451 |