EP2436038 - Solar panel, method for producing the same and bypass plug [Right-click to bookmark this link] | |||
Former [2012/14] | SOLAR PANEL, METHOD FOR PRODUCING THE SAME, CONNECTING PLUG, AND BYPASS PLUG | ||
[2017/17] | Status | No opposition filed within time limit Status updated on 10.08.2018 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 01.09.2017 | ||
Former | Grant of patent is intended Status updated on 19.04.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Yamaichi Electronics Deutschland GmbH Concor Park Bahnhofstrasse 20 85609 Aschheim-Dornach / DE | For all designated states Hanwha Q.CELLS GmbH Sonnenallee 17-21 OT Thalheim 06766 Bitterfeld-Wolfen / DE | [2014/40] |
Former [2013/13] | For all designated states Yamaichi Electronics Deutschland GmbH Concor Park Bahnhofstrasse 20 85609 Aschheim-Dornach / DE | ||
For all designated states Q-Cells SE Sonnenallee 17 06766 Bitterfeld-Wolfen / DE | |||
Former [2012/14] | For all designated states Yamaichi Electronics Deutschland GmbH Karl-Schmid-Strasse 9 81829 München / DE | ||
For all designated states Q-Cells SE Sonnenallee 17 06766 Bitterfeld-Wolfen / DE | Inventor(s) | 01 /
EBERLE, Erwin Agnes-Bernauer-Strasse 109 80687 München / DE | 02 /
QUITER, Michael Auf'm Kinderheid 22 57482 Wenden / DE | 03 /
DREWITZ, Hagen Dieselstr. 5 04129 Leipzig / DE | 04 /
TRÄGER, Markus Dimitroffstr. 24 04107 Leipzig / DE | [2012/14] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2017/40] |
Former [2012/14] | Müller-Boré & Partner Patentanwälte Grafinger Straße 2 81671 München / DE | Application number, filing date | 10721344.9 | 26.05.2010 | [2017/40] | WO2010EP03197 | Priority number, date | DE20091022943 | 27.05.2009 Original published format: DE102009022943 | [2012/14] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2010136189 | Date: | 02.12.2010 | Language: | DE | [2010/48] | Type: | A1 Application with search report | No.: | EP2436038 | Date: | 04.04.2012 | Language: | DE | The application published by WIPO in one of the EPO official languages on 02.12.2010 takes the place of the publication of the European patent application. | [2012/14] | Type: | B1 Patent specification | No.: | EP2436038 | Date: | 04.10.2017 | Language: | DE | [2017/40] | Search report(s) | International search report - published on: | EP | 02.12.2010 | Classification | IPC: | H02S40/34, H01L31/02 | [2017/17] | CPC: |
H01L31/02008 (EP);
H02S40/34 (EP);
Y02E10/50 (EP)
|
Former IPC [2012/14] | H01L31/048 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/14] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | Solarpaneel, Verfahren zum Herstellen und Überbrückungsdose | [2017/17] | English: | Solar panel, method for producing the same and bypass plug | [2017/17] | French: | Panneau solaire, procédé de fabrication de ce panneau et boîte de pontage | [2017/17] |
Former [2012/14] | SOLARPANEEL, VERFAHREN ZUM HERSTELLEN, ANSCHLUSSDOSE UND ÜBERBRÜCKUNGSDOSE | ||
Former [2012/14] | SOLAR PANEL, METHOD FOR PRODUCING THE SAME, CONNECTING PLUG, AND BYPASS PLUG | ||
Former [2012/14] | PANNEAU SOLAIRE, PROCÉDÉ DE FABRICATION DE CE PANNEAU, BOÎTE DE JONCTION ET BOÎTE DE PONTAGE | Entry into regional phase | 22.12.2011 | National basic fee paid | 22.12.2011 | Designation fee(s) paid | 22.12.2011 | Examination fee paid | Examination procedure | 22.12.2011 | Examination requested [2012/14] | 23.07.2012 | Amendment by applicant (claims and/or description) | 20.04.2017 | Communication of intention to grant the patent | 17.08.2017 | Receipt of the translation of the claim(s) | 24.08.2017 | Fee for grant paid | 24.08.2017 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.04.2017 | Opposition(s) | 05.07.2018 | No opposition filed within time limit [2018/37] | Fees paid | Renewal fee | 29.03.2012 | Renewal fee patent year 03 | 29.05.2013 | Renewal fee patent year 04 | 26.03.2014 | Renewal fee patent year 05 | 28.05.2015 | Renewal fee patent year 06 | 30.03.2016 | Renewal fee patent year 07 | 23.05.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Stay/Interruption | 01.07.2012 | Interruption of proceedings. Reason: legal prevention of applicant | [2013/37] | 03.03.2014 | Resumption of proceedings | [2013/37] | Lapses during opposition Tooltip | HU | 26.05.2010 | AL | 04.10.2017 | CY | 04.10.2017 | CZ | 04.10.2017 | DK | 04.10.2017 | EE | 04.10.2017 | ES | 04.10.2017 | FI | 04.10.2017 | HR | 04.10.2017 | IT | 04.10.2017 | LT | 04.10.2017 | LV | 04.10.2017 | MC | 04.10.2017 | MK | 04.10.2017 | MT | 04.10.2017 | NL | 04.10.2017 | PL | 04.10.2017 | PT | 04.10.2017 | RO | 04.10.2017 | SE | 04.10.2017 | SI | 04.10.2017 | SK | 04.10.2017 | SM | 04.10.2017 | TR | 04.10.2017 | BG | 04.01.2018 | NO | 04.01.2018 | GR | 05.01.2018 | IS | 04.02.2018 | AT | 26.05.2018 | IE | 26.05.2018 | LU | 26.05.2018 | BE | 31.05.2018 | CH | 31.05.2018 | LI | 31.05.2018 | [2020/33] |
Former [2020/31] | HU | 26.05.2010 | |
CY | 04.10.2017 | ||
CZ | 04.10.2017 | ||
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MK | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
PT | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
TR | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
AT | 26.05.2018 | ||
IE | 26.05.2018 | ||
LU | 26.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/27] | HU | 26.05.2010 | |
CZ | 04.10.2017 | ||
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
PT | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
TR | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
AT | 26.05.2018 | ||
IE | 26.05.2018 | ||
LU | 26.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/16] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
TR | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
AT | 26.05.2018 | ||
IE | 26.05.2018 | ||
LU | 26.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/46] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
AT | 26.05.2018 | ||
IE | 26.05.2018 | ||
LU | 26.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/24] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
IE | 26.05.2018 | ||
LU | 26.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/19] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
IE | 26.05.2018 | ||
LU | 26.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/17] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
LU | 26.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/12] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/06] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MC | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/52] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SI | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/43] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
MT | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/40] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
RO | 04.10.2017 | ||
SE | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/39] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
IT | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
SE | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/37] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
NL | 04.10.2017 | ||
PL | 04.10.2017 | ||
SE | 04.10.2017 | ||
SK | 04.10.2017 | ||
SM | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/35] | CZ | 04.10.2017 | |
DK | 04.10.2017 | ||
EE | 04.10.2017 | ||
ES | 04.10.2017 | ||
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
NL | 04.10.2017 | ||
SE | 04.10.2017 | ||
SK | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/24] | ES | 04.10.2017 | |
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
LT | 04.10.2017 | ||
LV | 04.10.2017 | ||
NL | 04.10.2017 | ||
SE | 04.10.2017 | ||
BG | 04.01.2018 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/23] | ES | 04.10.2017 | |
FI | 04.10.2017 | ||
HR | 04.10.2017 | ||
LT | 04.10.2017 | ||
NL | 04.10.2017 | ||
SE | 04.10.2017 | ||
NO | 04.01.2018 | ||
GR | 05.01.2018 | ||
IS | 04.02.2018 | ||
Former [2018/22] | ES | 04.10.2017 | |
FI | 04.10.2017 | ||
LT | 04.10.2017 | ||
NL | 04.10.2017 | ||
NO | 04.01.2018 | ||
Former [2018/17] | NL | 04.10.2017 | Cited in | International search | [Y]EP1589588 (SUMITOMO WIRING SYSTEMS [JP]) [Y] 12 * paragraph [0036]; figure 5 *; | [A]DE202008006119U (LUMBERG CONNECT GMBH [DE]) [A] 1-15* paragraph [0021] - paragraph [0044]; figures 1-5 *; | [Y]DE102007020845 (SPELSBERG GUENTHER GMBH CO KG [DE], et al) [Y] 4-6,11,13 * paragraph [0047]; figure 6 *; | [XY]WO2008148524 (TYCO ELECTRONICS AMP GMBH [DE], et al) [X] 1-3,7-10,14,15 * page 11, line 14 - page 13, line 15; figures 3,4 * [Y] 4-6,11-13; | [A]DE102007031351 (TYCO ELECTRONICS AMP GMBH [DE]) [A] 1-15 * paragraph [0028] - paragraph [0035]; figures 1,2 * |