blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2440732

EP2440732 - DOOR SEALING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.12.2016
Database last updated on 03.10.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Planet GDZ AG
Neustadtstrasse 2
8317 Tagelswangen / CH
[2014/30]
Former [2012/16]For all designated states
Planet GDZ AG
Neustadtstrasse 2
8317 Tagelswangen / CH
Inventor(s)01 / DINTHEER, Andreas
Alpenstr. 25
8308 Illnau / CH
 [2012/16]
Representative(s)Clerc, Natalia
Isler & Pedrazzini AG
Giesshübelstrasse 45
Postfach 1772
8027 Zürich / CH
[N/P]
Former [2016/04]Clerc, Natalia
Isler & Pedrazzini AG
Postfach 1772
8027 Zürich / CH
Former [2012/16]Clerc, Natalia
Isler & Pedrazzini AG Postfach 1772
8027 Zürich / CH
Application number, filing date10722521.108.06.2010
[2016/04]
WO2010CH00149
Priority number, dateCH2009008800909.06.2009         Original published format: CH 880092009
[2012/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2010142053
Date:16.12.2010
Language:DE
[2010/50]
Type: A1 Application with search report 
No.:EP2440732
Date:18.04.2012
Language:DE
The application published by WIPO in one of the EPO official languages on 16.12.2010 takes the place of the publication of the European patent application.
[2012/16]
Type: B1 Patent specification 
No.:EP2440732
Date:27.01.2016
Language:DE
[2016/04]
Search report(s)International search report - published on:EP16.12.2010
ClassificationIPC:E06B7/02, E06B7/20, E06B7/215, E06B5/20
[2012/16]
CPC:
E06B7/02 (EP); E06B5/20 (EP); E06B7/20 (EP);
E06B7/215 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/16]
Extension statesBANot yet paid
MENot yet paid
RSNot yet paid
TitleGerman:TÜRDICHTUNGSSYSTEM[2012/16]
English:DOOR SEALING SYSTEM[2012/16]
French:SYSTÈME D'ÉTANCHÉITÉ DE PORTE[2012/16]
Entry into regional phase24.11.2011National basic fee paid 
24.11.2011Designation fee(s) paid 
24.11.2011Examination fee paid 
Examination procedure24.11.2011Examination requested  [2012/16]
12.07.2012Amendment by applicant (claims and/or description)
07.01.2013Despatch of a communication from the examining division (Time limit: M06)
08.07.2013Reply to a communication from the examining division
06.03.2015Communication of intention to grant the patent
14.07.2015Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
29.07.2015Communication of intention to grant the patent
30.11.2015Fee for grant paid
30.11.2015Fee for publishing/printing paid
30.11.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  07.01.2013
Opposition(s)28.10.2016No opposition filed within time limit [2017/01]
Fees paidRenewal fee
10.04.2012Renewal fee patent year 03
17.06.2013Renewal fee patent year 04
02.04.2014Renewal fee patent year 05
11.06.2015Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.06.2010
AL27.01.2016
CY27.01.2016
CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
MC27.01.2016
MK27.01.2016
MT27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SI27.01.2016
SK27.01.2016
SM27.01.2016
TR27.01.2016
BG27.04.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
IE08.06.2016
LU08.06.2016
[2018/46]
Former [2018/32]HU08.06.2010
CY27.01.2016
CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
MC27.01.2016
MK27.01.2016
MT27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SI27.01.2016
SK27.01.2016
SM27.01.2016
TR27.01.2016
BG27.04.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
IE08.06.2016
LU08.06.2016
Former [2018/29]HU08.06.2010
CY27.01.2016
CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
MC27.01.2016
MK27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SI27.01.2016
SK27.01.2016
SM27.01.2016
TR27.01.2016
BG27.04.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
IE08.06.2016
LU08.06.2016
Former [2018/28]HU08.06.2010
CY27.01.2016
CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
MC27.01.2016
MK27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SI27.01.2016
SK27.01.2016
SM27.01.2016
BG27.04.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
IE08.06.2016
Former [2017/38]CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
MC27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SI27.01.2016
SK27.01.2016
SM27.01.2016
BG27.04.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
IE08.06.2016
Former [2017/15]CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
MC27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SI27.01.2016
SK27.01.2016
SM27.01.2016
BG27.04.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
Former [2017/07]CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
MC27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SK27.01.2016
SM27.01.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
Former [2016/50]CZ27.01.2016
DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
PL27.01.2016
RO27.01.2016
SE27.01.2016
SK27.01.2016
SM27.01.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
Former [2016/49]DK27.01.2016
EE27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
PL27.01.2016
SE27.01.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
Former [2016/46]DK27.01.2016
ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
PL27.01.2016
SE27.01.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
Former [2016/39]ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
LV27.01.2016
PL27.01.2016
SE27.01.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
Former [2016/38]ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
PL27.01.2016
NO27.04.2016
GR28.04.2016
IS27.05.2016
PT27.05.2016
Former [2016/36]ES27.01.2016
FI27.01.2016
HR27.01.2016
LT27.01.2016
PL27.01.2016
NO27.04.2016
GR28.04.2016
Former [2016/35]ES27.01.2016
FI27.01.2016
HR27.01.2016
NO27.04.2016
GR28.04.2016
Cited inInternational search[IDY]EP1936097  (PLANET GDZ AG [CH]) [ID] 3-5,7-10,15 * the whole document * [Y] 1,11,13,14;
 [Y]JP2000110455  (KUBOTA HOUSE KK; KUBOTA KK) [Y] 1-3,6,13,14 * the whole document *;
 [Y]EP1365098  (ATHMER FA F [DE]) [Y] 1-3,6,11 * paragraphs [0015] , [0036] - paragraph [0039]; figures 12,13; claims 32-35 *;
 [Y]DE3801692  (MANTEL JUVAL [DE]) [Y] 1 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.