blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2433355

EP2433355 - APPARATUS, SYSTEMS, AND METHODS TO ADDRESS ELECTRICAL LOAD TRANSIENTS, ELECTRICAL FAULTS, AND ELECTRIC POWER GRID DISRUPTIONS [Right-click to bookmark this link]
StatusPatent maintained as amended
Status updated on  01.09.2017
Database last updated on 28.06.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Cummins Power Generation IP, Inc.
1400 73rd Avenue, NE
Minneapolis, MN 55432 / US
[2012/13]
Inventor(s)01 / PENDRAY, John, R.
9154 Zumbrota Street, NE
Blaine, Minesota 55449 / US
02 / PIERZ, Patrick, M.
1013 Lapwing Drive
Columbus IN 47203 / US
03 / PALMER, Bradford, K.
3224 144th Avenue NE
Ham Lake MN 55304 / US
04 / KITCHEN, Andrew
20 Bradbury Road
Newnham
Daventry
Northamptonshire / GB
 [2012/17]
Former [2012/13]01 / PENDRAY, John, R.
2551 38th Avenue NE 241
Minneapolis MN 55421 / US
02 / PIERZ, Patrick, M.
1013 Lapwing Drive
Columbus IN 47203 / US
03 / PALMER, Bradford, K.
3224 144th Avenue NE
Ham Lake MN 55304 / US
04 / KITCHEN, Andrew
20 Bradbury Road
Newnham
Daventry
Northamptonshire / GB
Representative(s)Roberts, Peter David, et al
Marks & Clerk LLP
1 New York Street
Manchester M1 4HD / GB
[2017/40]
Former [2012/13]Roberts, Peter David, et al
Marks & Clerk LLP
1 New York Street
Manchester, M1 4HD / GB
Application number, filing date10724918.720.05.2010
[2017/40]
WO2010US01497
Priority number, dateUS20090216662P20.05.2009         Original published format: US 216662 P
[2012/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010134994
Date:25.11.2010
Language:EN
[2010/47]
Type: A1 Application with search report 
No.:EP2433355
Date:28.03.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 25.11.2010 takes the place of the publication of the European patent application.
[2012/13]
Type: B1 Patent specification 
No.:EP2433355
Date:30.07.2014
Language:EN
[2014/31]
Type: B2 New European patent specification 
No.:EP2433355
Date:04.10.2017
Language:EN
[2017/40]
Search report(s)International search report - published on:EP25.11.2010
ClassificationIPC:H02P9/10, F02D37/02, F02D41/04, F02D41/08, F02D41/14
[2012/13]
CPC:
H02P9/10 (EP); F02D19/02 (EP); F02D29/06 (EP);
F02P5/15 (EP); H02P9/102 (EP); H02P9/105 (EP);
H02P9/107 (EP); F02M21/0212 (EP); F02M21/0215 (EP);
H02P2101/15 (EP); Y02T10/30 (EP); Y02T10/40 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/13]
TitleGerman:GERÄT, SYSTEME UND VERFAHREN ZUR BEWÄLTIGUNG VON TRANSIENTEN IN EINER ELEKTRISCHEN LAST, ELEKTRISCHEN FEHLERN UND BEEINTRÄCHTIGUNGEN IM ELEKTRISCHEN NETZ[2013/45]
English:APPARATUS, SYSTEMS, AND METHODS TO ADDRESS ELECTRICAL LOAD TRANSIENTS, ELECTRICAL FAULTS, AND ELECTRIC POWER GRID DISRUPTIONS[2012/13]
French:APPAREIL, DES SYSTÈMES ET MÉTHODES POUR RÉPONDRE AUX TRANSITOIRES DE CHARGE ELECTRIQUE, DES DÉFAUTS ÉLECTRIQUES ET DES PERTURBATIONS DANS UN RÉSEAU ÉLECTRIQUE[2013/45]
Former [2012/13]VORRICHTUNGEN, SYSTEME UND VERFAHREN ZUM BEHANDELN VON ELEKTRISCHEN LASTTRANSIENTEN, ELEKTRISCHEN FEHLERN UND UNTERBRECHUNGEN DES ELEKTRISCHEN STROMNETZES
Former [2012/13]APPAREIL, SYSTÈMES ET PROCÉDÉS POUR TRAITER DES SURTENSIONS TRANSITOIRES DE CHARGE ÉLECTRIQUE, DES PANNES ÉLECTRIQUES ET DES PERTURBATIONS DE RÉSEAU D'ALIMENTATION ÉLECTRIQUE
Entry into regional phase25.11.2011National basic fee paid 
25.11.2011Designation fee(s) paid 
25.11.2011Examination fee paid 
Examination procedure25.11.2011Amendment by applicant (claims and/or description)
25.11.2011Examination requested  [2012/13]
30.10.2012Despatch of a communication from the examining division (Time limit: M04)
06.02.2013Reply to a communication from the examining division
11.03.2013Despatch of a communication from the examining division (Time limit: M06)
18.09.2013Reply to a communication from the examining division
24.10.2013Communication of intention to grant the patent
09.01.2014Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
18.02.2014Communication of intention to grant the patent
19.06.2014Fee for grant paid
19.06.2014Fee for publishing/printing paid
19.06.2014Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  30.10.2012
Opposition(s)Opponent(s)01  29.04.2015  26.05.2015  ADMISSIBLE
Wärtsilä Finland OY
Tarhaajantie 2
65380 Vaasa / FI
Opponent's representative
Berggren Oy, Helsinki & Oulu
P.O. Box 16
Eteläinen Rautatiekatu 10A
00101 Helsinki / FI
 [N/P]
Former [2015/24]
Opponent(s)01  29.04.2015   
Wärtsilä Finland OY
Tarhaajantie 2
65380 Vaasa / FI
Opponent's representative
Berggren Oy Ab
P.O. Box 16
Antinkatu 3 C
00101 Helsinki / FI
10.06.2015Invitation to proprietor to file observations on the notice of opposition
21.12.2015Reply of patent proprietor to notice(s) of opposition
07.11.2016Date of oral proceedings
02.12.2016Despatch of interlocutory decision in opposition
02.12.2016Despatch of minutes of oral proceedings
31.03.2017Legal effect of interlocutory decision in opposition
09.06.2017Despatch of communication that the patent will be maintained as amended
23.08.2017Fee for printing new specification paid
Appeal following opposition13.02.2017Appeal received No.  T0393/17
31.03.2017Result of appeal procedure: appeal of the proprietor withdrawn
Fees paidRenewal fee
25.05.2012Renewal fee patent year 03
28.05.2013Renewal fee patent year 04
27.05.2014Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.05.2010
AL30.07.2014
BE30.07.2014
CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
MK30.07.2014
MT30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
SM30.07.2014
TR30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
[2018/46]
Former [2018/30]HU20.05.2010
BE30.07.2014
CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
MK30.07.2014
MT30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
SM30.07.2014
TR30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2018/27]HU20.05.2010
BE30.07.2014
CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
MT30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
SM30.07.2014
TR30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2018/24]HU20.05.2010
BE30.07.2014
CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
MC30.07.2014
MT30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
SM30.07.2014
TR30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2017/38]HU20.05.2010
BE30.07.2014
CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
MT30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
SM30.07.2014
TR30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2017/03]BE30.07.2014
CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
MT30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2016/32]BE30.07.2014
CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2016/20]CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
IE20.05.2015
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2016/06]CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
MC30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
LU20.05.2015
CH31.05.2015
LI31.05.2015
Former [2015/50]CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SI30.07.2014
SK30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
Former [2015/23]CY30.07.2014
CZ30.07.2014
DK30.07.2014
EE30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
SK30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
Former [2015/22]CY30.07.2014
DK30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
IT30.07.2014
LT30.07.2014
LV30.07.2014
NL30.07.2014
PL30.07.2014
RO30.07.2014
SE30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
Former [2015/12]CY30.07.2014
ES30.07.2014
FI30.07.2014
HR30.07.2014
LT30.07.2014
LV30.07.2014
NL30.07.2014
PL30.07.2014
SE30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
IS30.11.2014
PT02.12.2014
Former [2015/11]CY30.07.2014
ES30.07.2014
FI30.07.2014
LT30.07.2014
PL30.07.2014
SE30.07.2014
BG30.10.2014
NO30.10.2014
GR31.10.2014
PT02.12.2014
Former [2015/10]ES30.07.2014
FI30.07.2014
LT30.07.2014
SE30.07.2014
BG30.10.2014
NO30.10.2014
Former [2015/09]FI30.07.2014
LT30.07.2014
SE30.07.2014
Former [2015/08]LT30.07.2014
Cited inInternational search[Y]CN201181925Y  (XUELIN WANG [CN]) [Y] 1-25 * abstract *;
 [Y]US2004144360  (SURNILLA GOPICHANDRA [US], et al) [Y] 1-25 * paragraphs [0034] , [0035]; figures 1-15 *;
 [Y]US2009058086  (ARINAGA SHINJI [JP], et al) [Y] 1-25 * paragraphs [0004] , [0048]; figures 1-5 *
ExaminationDE662880
 US2007130952
by applicantUS2009058086
OppositionUS2003024503
 US5703410
 GB2406920
    - Grid Code - High and extra high voltage, BAYREUTH, E.ON NETZ GMBH, (20060401), pages 1 - 46
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.