blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2443039

EP2443039 - EXTENDABLE STRUCTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.11.2015
Database last updated on 14.09.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Astrium Limited
Gunnels Wood Road
Stevenage, Hertfordshire, SG1 2AS / GB
[2015/02]
Former [2012/17]For all designated states
Astrium Limited
Gunnels Wood Road
Stevenage, Hertfordshire, SG1 2AS / GB
Inventor(s)01 / SLADE, Richard, Paul
20 Tithe Road
Kempston Bedfordshire MK43 9BE / GB
 [2012/17]
Representative(s)Cork, Robert
Venner Shipley LLP
5 Stirling House
Stirling Road The Surrey Research Park
Guildford GU2 7RF / GB
[N/P]
Former [2013/30]Cork, Robert
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
Former [2012/17]Johansson, Anna Olivia, et al
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
Application number, filing date10728630.417.06.2010
WO2010EP58562
Priority number, dateEP2009027504518.06.2009         Original published format: EP 09275045
[2012/17]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010146126
Date:23.12.2010
Language:EN
[2010/51]
Type: A1 Application with search report 
No.:EP2443039
Date:25.04.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 23.12.2010 takes the place of the publication of the European patent application.
[2012/17]
Type: B1 Patent specification 
No.:EP2443039
Date:07.01.2015
Language:EN
[2015/02]
Search report(s)International search report - published on:EP23.12.2010
ClassificationIPC:B64G1/10, B64G1/22, E04B1/344, E04H12/18, B64G1/66
[2014/41]
CPC:
E04H12/185 (EP,US); B64G1/222 (US); B64G1/2224 (EP);
B64G1/223 (EP,US); B64G1/66 (EP,US); B64G1/2229 (EP)
Former IPC [2012/17]B64G1/22, E04B1/344, E04H12/18
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/17]
Extension statesBANot yet paid
MENot yet paid
RSNot yet paid
TitleGerman:AUSFAHRBARE STRUKTUR[2014/42]
English:EXTENDABLE STRUCTURE[2012/17]
French:STRUCTURE EXTENSIBLE[2012/17]
Former [2012/17]AUSZIEHBARE STRUKTUR
Entry into regional phase22.12.2011National basic fee paid 
22.12.2011Designation fee(s) paid 
22.12.2011Examination fee paid 
Examination procedure22.12.2011Examination requested  [2012/17]
06.08.2012Amendment by applicant (claims and/or description)
05.02.2014Despatch of a communication from the examining division (Time limit: M04)
13.06.2014Reply to a communication from the examining division
15.09.2014Communication of intention to grant the patent
28.11.2014Fee for grant paid
28.11.2014Fee for publishing/printing paid
28.11.2014Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.02.2014
Opposition(s)08.10.2015No opposition filed within time limit [2015/51]
Fees paidRenewal fee
27.06.2012Renewal fee patent year 03
20.06.2013Renewal fee patent year 04
25.06.2014Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.06.2010
AL07.01.2015
AT07.01.2015
BE07.01.2015
CY07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MK07.01.2015
MT07.01.2015
PL07.01.2015
PT07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
SM07.01.2015
TR07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
CH30.06.2015
LI30.06.2015
[2018/46]
Former [2018/34]HU17.06.2010
AT07.01.2015
BE07.01.2015
CY07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MK07.01.2015
MT07.01.2015
PL07.01.2015
PT07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
SM07.01.2015
TR07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
CH30.06.2015
LI30.06.2015
Former [2018/30]HU17.06.2010
AT07.01.2015
BE07.01.2015
CY07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MK07.01.2015
MT07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
SM07.01.2015
TR07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
CH30.06.2015
LI30.06.2015
Former [2017/38]HU17.06.2010
AT07.01.2015
BE07.01.2015
CY07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MT07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
SM07.01.2015
TR07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
CH30.06.2015
LI30.06.2015
Former [2017/03]AT07.01.2015
BE07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MT07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
CH30.06.2015
LI30.06.2015
Former [2016/24]AT07.01.2015
BE07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
CH30.06.2015
LI30.06.2015
Former [2016/22]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
CH30.06.2015
LI30.06.2015
Former [2016/20]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
IE17.06.2015
LU17.06.2015
Former [2016/11]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
LU17.06.2015
Former [2016/09]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2016/03]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/49]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
LV07.01.2015
PL07.01.2015
RO07.01.2015
SE07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/39]AT07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
LV07.01.2015
PL07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/38]AT07.01.2015
ES07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
PL07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/37]ES07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
PL07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
Former [2015/36]ES07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
Former [2015/35]ES07.01.2015
LT07.01.2015
NO07.04.2015
Former [2015/33]ES07.01.2015
Cited inInternational search[YA]DE3832546  (MITSUBISHI ELECTRIC CORP [JP]);
 [A]JPH03125697  (MIURA KORYO, et al);
 [A]US5086999  (MULLEN CHARLES F [US]);
 [A]US2005016109  (ROUSE GLENN R [US]);
 [Y]FR2873353  (GUSTAVE STEVE [FR])
ExaminationJPH10167243
 JPH10218149
by applicantUS6343442
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.