EP2376247 - PROCESS FOR MANUFACTIRUNG MULTILEVEL PARTS FROM AGGLOMERATED SPHERICAL METAL POWDER [Right-click to bookmark this link] | |||
Former [2011/42] | MULTILEVEL PARTS FROM AGGLOMERATED SPHERICAL METAL POWDER | ||
[2018/31] | Status | No opposition filed within time limit Status updated on 18.09.2020 Database last updated on 29.03.2025 | |
Former | The patent has been granted Status updated on 11.10.2019 | ||
Former | Grant of patent is intended Status updated on 06.08.2018 | ||
Former | Examination is in progress Status updated on 06.10.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Metal Additive Technologies 20 Villa de l'Ermitage 78000 Versailles / FR | [2019/51] |
Former [2019/50] | For all designated states Metalvalue SAS 105-109, rue du Faubourg Saint-Honoré 75008 Paris / FR | ||
Former [2019/48] | For all designated states HYP Uthyrning AB Projektilgatan 2 691 50 Karlskoga / SE | ||
Former [2019/46] | For all designated states Metec Powder Metal AB Bofors Industriområde 691 80 Karlskoga / SE | ||
Former [2011/42] | For all designated states Metec Powder Metal AB Bofors Industriområde 691 80 Karlskoga / SE | Inventor(s) | 01 /
ÅSLUND, Christer Lilla Gatan 8 S-644 36 Torshälla / SE | [2011/45] |
Former [2011/42] | 01 /
ÅSLUND, Christer Bråvallavägen 11 S-644 36 Torshälla / SE | Representative(s) | Cabinet Netter 36, avenue Hoche 75008 Paris / FR | [2019/46] |
Former [2011/44] | Carlsson, Carl Fredrik Munk Bergenstråhle & Lindvall AB P.O. Box 17704 118 93 Stockholm / SE | ||
Former [2011/42] | (deleted) | Application number, filing date | 10729366.4 | 08.01.2010 | [2019/46] | WO2010SE50012 | Priority number, date | SE20090050008 | 12.01.2009 Original published format: SE 0950008 | US20090144090P | 12.01.2009 Original published format: US 144090 P | [2011/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010080064 | Date: | 15.07.2010 | Language: | EN | [2010/28] | Type: | A1 Application with search report | No.: | EP2376247 | Date: | 19.10.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.07.2010 takes the place of the publication of the European patent application. | [2011/42] | Type: | B1 Patent specification | No.: | EP2376247 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Type: | B8 Corrected title page of specification | No.: | EP2376247 | Date: | 25.12.2019 | [2019/52] | Search report(s) | International search report - published on: | SE | 15.07.2010 | (Supplementary) European search report - dispatched on: | EP | 26.07.2017 | Classification | IPC: | B22F3/087, B22F3/10, B22F3/16, C22C33/02, C22C38/18 | [2017/34] | CPC: |
B22F3/16 (EP,US);
B22F3/15 (US);
B22F3/04 (US);
B22F3/087 (EP,US);
B22F3/24 (US);
B22F5/00 (US);
C22C1/0433 (US);
C22C33/02 (US);
C22C38/18 (EP,US);
B22F2998/10 (EP,US);
B22F2999/00 (EP,US);
C22C19/03 (EP,US);
| C-Set: |
B22F2998/10, B22F3/04, B22F3/1021, B22F3/1007, B22F3/087, B22F3/15 (EP,US);
B22F2999/00, B22F3/1007, B22F2201/013 (US,EP) |
Former IPC [2011/42] | B22F3/087, B22F3/11, B22F3/12, B22F3/15, B22F3/16, B22F3/17 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2019/46] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUM HERSTELLEN MEHRSCHICHTIGER TEILE AUS EINEM AGGLOMERIERTEN METALLKUGELPULVER | [2018/31] | English: | PROCESS FOR MANUFACTIRUNG MULTILEVEL PARTS FROM AGGLOMERATED SPHERICAL METAL POWDER | [2018/31] | French: | PROCÈDÈ DE PRODUIRE DES PIÈCES À MULTIPLES NIVEAUX OBTENUES À PARTIR D'UNE POUDRE MÉTALLIQUE SPHÉRIQUE AGGLOMÉRÉE | [2018/31] |
Former [2011/42] | MEHRSCHICHTIGE TEILE AUS EINEM AGGLOMERIERTEN METALLKUGELPULVER | ||
Former [2011/42] | MULTILEVEL PARTS FROM AGGLOMERATED SPHERICAL METAL POWDER | ||
Former [2011/42] | PIÈCES À MULTIPLES NIVEAUX OBTENUES À PARTIR D'UNE POUDRE MÉTALLIQUE SPHÉRIQUE AGGLOMÉRÉE | Entry into regional phase | 16.06.2011 | National basic fee paid | 16.06.2011 | Search fee paid | 16.06.2011 | Designation fee(s) paid | 16.06.2011 | Examination fee paid | Examination procedure | 16.06.2011 | Examination requested [2011/42] | 25.09.2014 | Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time | 04.09.2017 | Amendment by applicant (claims and/or description) | 05.10.2017 | Despatch of a communication from the examining division (Time limit: M06) | 28.03.2018 | Reply to a communication from the examining division | 07.08.2018 | Communication of intention to grant the patent | 03.12.2018 | Fee for grant paid | 03.12.2018 | Fee for publishing/printing paid | 03.12.2018 | Receipt of the translation of the claim(s) | Appeal following examination | 29.04.2015 | Appeal received No. J0007/15 | 02.06.2015 | Statement of grounds filed | 14.03.2016 | Invitation to file observations in an appeal (Time limit: M02) [2016/11] | 11.05.2016 | Date of receipt of observations in an appeal [2016/20] | 12.10.2016 | Result of appeal procedure: allowance of appeal | 12.10.2016 | Date of oral proceedings | 19.10.2016 | Minutes of oral proceedings despatched | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.10.2017 | Opposition(s) | 14.08.2020 | No opposition filed within time limit [2020/43] | Fees paid | Renewal fee | 31.01.2012 | Renewal fee patent year 03 | 24.06.2013 | Renewal fee patent year 04 | 31.01.2014 | Renewal fee patent year 05 | 02.02.2015 | Renewal fee patent year 06 | 26.01.2016 | Renewal fee patent year 07 | 28.06.2017 | Renewal fee patent year 08 | 15.01.2018 | Renewal fee patent year 09 | 10.01.2019 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 31.01.2013 | 04   M06   Fee paid on   24.06.2013 | 31.01.2014 | 05   M06   Fee paid on   31.01.2014 | 31.01.2017 | 08   M06   Fee paid on   28.06.2017 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.01.2010 | AT | 13.11.2019 | CY | 13.11.2019 | CZ | 13.11.2019 | DK | 13.11.2019 | EE | 13.11.2019 | FI | 13.11.2019 | HR | 13.11.2019 | LT | 13.11.2019 | LV | 13.11.2019 | MC | 13.11.2019 | MK | 13.11.2019 | MT | 13.11.2019 | NL | 13.11.2019 | RO | 13.11.2019 | SI | 13.11.2019 | SK | 13.11.2019 | SM | 13.11.2019 | IE | 08.01.2020 | BE | 31.01.2020 | NO | 13.02.2020 | GR | 14.02.2020 | IS | 13.03.2020 | PT | 13.03.2020 | [2022/32] |
Former [2022/27] | HU | 08.01.2010 | |
AT | 13.11.2019 | ||
CY | 13.11.2019 | ||
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
MT | 13.11.2019 | ||
NL | 13.11.2019 | ||
RO | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
IE | 08.01.2020 | ||
BE | 31.01.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2021/08] | AT | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
RO | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
IE | 08.01.2020 | ||
BE | 31.01.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/51] | AT | 13.11.2019 | |
CZ | 13.11.2019 | ||
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
RO | 13.11.2019 | ||
SI | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
BE | 31.01.2020 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/39] | CZ | 13.11.2019 | |
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
MC | 13.11.2019 | ||
NL | 13.11.2019 | ||
RO | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/37] | CZ | 13.11.2019 | |
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
RO | 13.11.2019 | ||
SK | 13.11.2019 | ||
SM | 13.11.2019 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/36] | CZ | 13.11.2019 | |
DK | 13.11.2019 | ||
EE | 13.11.2019 | ||
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
RO | 13.11.2019 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/35] | CZ | 13.11.2019 | |
FI | 13.11.2019 | ||
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
RO | 13.11.2019 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/25] | FI | 13.11.2019 | |
HR | 13.11.2019 | ||
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/24] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
IS | 13.03.2020 | ||
PT | 13.03.2020 | ||
Former [2020/23] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
LV | 13.11.2019 | ||
NL | 13.11.2019 | ||
NO | 13.02.2020 | ||
GR | 14.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/22] | FI | 13.11.2019 | |
LT | 13.11.2019 | ||
NO | 13.02.2020 | ||
PT | 13.03.2020 | ||
Former [2020/21] | NO | 13.02.2020 | Documents cited: | Search | [XA]US6334882 (AASLUND CHRISTER [SE]) [X] 15 * the whole document * * example 1 * [A] 1-14; | [XA]WO03008131 (HAWK PREC COMPONENTS GROUP INC [US], et al) [X] 15 * the whole document *[A] 1-14 | International search | [A]US6334882 (AASLUND CHRISTER [SE]); | [A]WO03008131 (HAWK PREC COMPONENTS GROUP INC [US], et al); | [A]WO03061882 (CK MAN AB [SE], et al); | [A]WO03061883 (CK MAN AB [SE], et al); | [A] - BAREND VANDEN BOS ET AL, "Industrial Implementation of High Velocity Compaction for Improved Properties", POWDER METALLURGY, (2006), vol. 49, no. 2, pages 107 - 109, XP003026463 DOI: http://dx.doi.org/10.1179/174329006X115975 | by applicant | EP1047518 | US6334882 | WO03008131 | US2008202651 | - BOS et al., Powder Metallurgy, vol. 49, no. 2, pages 107 - 109 |