EP2454751 - HIGH-GAIN WIDE BANDGAP DARLINGTON TRANSISTORS AND RELATED METHOD OF FABRICATION [Right-click to bookmark this link] | |||
Former [2012/21] | HIGH-GAIN WIDE BANDGAP DARLINGTON TRANSISTORS AND RELATED METHODS OF FABRICATION | ||
[2019/44] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 23.10.2019 | ||
Former | Examination is in progress Status updated on 12.10.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Cree, Inc. 4600 Silicon Drive Durham, NC 27703 / US | [2012/21] | Inventor(s) | 01 /
ZHANG, Qingchun 108 Hickorywood Boulevard Cary, NC 27519 / US | 02 /
AGARWAL, Anant K. 208 Black Tie Lane Chapel Hill, NC 27514 / US | [2012/21] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2020/15] |
Former [2014/02] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | ||
Former [2012/21] | Cross, Rupert Edward Blount Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road GB-London WC1X 8BT / GB | Application number, filing date | 10742052.3 | 15.07.2010 | [2020/15] | WO2010US42075 | Priority number, date | US20090503386 | 15.07.2009 Original published format: US 503386 | [2012/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011008919 | Date: | 20.01.2011 | Language: | EN | [2011/03] | Type: | A1 Application with search report | No.: | EP2454751 | Date: | 23.05.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.01.2011 takes the place of the publication of the European patent application. | [2012/21] | Type: | B1 Patent specification | No.: | EP2454751 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | International search report - published on: | EP | 20.01.2011 | Classification | IPC: | H01L21/82, H01L27/082, H01L29/73, // H01L29/16 | [2019/44] | CPC: |
H01L27/0825 (EP,US);
H01L21/8213 (EP,US);
H01L29/73 (EP,US);
H01L29/1608 (EP,US)
|
Former IPC [2012/21] | H01L21/82, H01L27/082, H01L29/73 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/21] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | DARLINGTON-TRANSISTOREN MIT HOHER VERSTÄRKUNG UND BREITER BANDLÜCKE SOWIE ZUGEHÖRIGES HERSTELLUNGSVERFAHREN | [2019/44] | English: | HIGH-GAIN WIDE BANDGAP DARLINGTON TRANSISTORS AND RELATED METHOD OF FABRICATION | [2019/44] | French: | TRANSISTORS DARLINGTON À LARGE BANDE INTERDITE ET À GAIN ÉLEVÉ ET PROCÉDÉ DE FABRICATION CORRESPONDANT | [2019/44] |
Former [2012/21] | DARLINGTON-TRANSISTOREN MIT HOHER VERSTÄRKUNG UND BREITER BANDLÜCKE SOWIE ZUGEHÖRIGE HERSTELLUNGSVERFAHREN | ||
Former [2012/21] | HIGH-GAIN WIDE BANDGAP DARLINGTON TRANSISTORS AND RELATED METHODS OF FABRICATION | ||
Former [2012/21] | TRANSISTORS DARLINGTON À LARGE BANDE INTERDITE ET À GAIN ÉLEVÉ ET PROCÉDÉS DE FABRICATION CORRESPONDANTS | Entry into regional phase | 13.01.2012 | National basic fee paid | 13.01.2012 | Designation fee(s) paid | 13.01.2012 | Examination fee paid | Examination procedure | 13.05.2011 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 13.01.2012 | Examination requested [2012/21] | 10.09.2012 | Amendment by applicant (claims and/or description) | 04.06.2013 | Despatch of a communication from the examining division (Time limit: M06) | 16.12.2013 | Reply to a communication from the examining division | 15.09.2015 | Despatch of a communication from the examining division (Time limit: M04) | 25.01.2016 | Reply to a communication from the examining division | 02.10.2017 | Despatch of a communication from the examining division (Time limit: M06) | 16.02.2018 | Reply to a communication from the examining division | 23.09.2019 | Cancellation of oral proceeding that was planned for 24.09.2019 | 24.09.2019 | Date of oral proceedings (cancelled) | 24.10.2019 | Communication of intention to grant the patent | 28.02.2020 | Fee for grant paid | 28.02.2020 | Fee for publishing/printing paid | 28.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.06.2013 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 13.07.2012 | Renewal fee patent year 03 | 10.07.2013 | Renewal fee patent year 04 | 14.07.2014 | Renewal fee patent year 05 | 10.07.2015 | Renewal fee patent year 06 | 11.07.2016 | Renewal fee patent year 07 | 12.07.2017 | Renewal fee patent year 08 | 11.07.2018 | Renewal fee patent year 09 | 15.07.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.07.2010 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | GB | 15.07.2020 | IE | 15.07.2020 | LU | 15.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | FR | 31.07.2020 | LI | 31.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2022/32] |
Former [2022/27] | HU | 15.07.2010 | |
AL | 08.04.2020 | ||
AT | 08.04.2020 | ||
CY | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MT | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
GB | 15.07.2020 | ||
IE | 15.07.2020 | ||
LU | 15.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2022/26] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
TR | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
GB | 15.07.2020 | ||
IE | 15.07.2020 | ||
LU | 15.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/37] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
GB | 15.07.2020 | ||
IE | 15.07.2020 | ||
LU | 15.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/23] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
GB | 15.07.2020 | ||
LU | 15.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/22] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
GB | 15.07.2020 | ||
LU | 15.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/20] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
LU | 15.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/13] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
PL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 08.04.2020 | |
AT | 08.04.2020 | ||
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 08.04.2020 | |
DK | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SM | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 08.04.2020 | |
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Cited in | International search | [Y]JPS60240158 (MITSUBISHI ELECTRIC CORP) [Y] 1-10,13-19 * abstract *; | [I]US2006261876 (AGARWAL ANANT K [US], et al) [I] 11,12,20,21 * paragraphs [0057] , [0069] , [0073]; figures 8-10 *; | [A]WO2004079789 (RENSSELAER POLYTECH INST [US], et al) [A] 1,6,7,13 * abstract * | [IY] - QINGCHUN ZHANG ET AL, "A 10-kV Monolithic Darlington Transistor With of 336 in 4H-SiC", IEEE ELECTRON DEVICE LETTERS, IEEE SERVICE CENTER, NEW YORK, NY, US LNKD- DOI:10.1109/LED.2008.2009953, (20090201), vol. 30, no. 2, ISSN 0741-3106, pages 142 - 144, XP011240662 [I] 11,12,20,21 * Sections I and II; section III, first paragraph;;; figures 1,4 * [Y] 1-10,13-19 DOI: http://dx.doi.org/10.1109/LED.2008.2009953 | [I] - KRISHNASWAMI S ET AL, "High temperature characterization of 4H-SiC bipolar junction transistors", MATERIALS SCIENCE FORUM, AEDERMANNSFDORF, CH, (20060101), vol. 527-529, ISSN 0255-5476, pages 1437 - 1440, XP009138720 [I] 11,12 * page 1439, paragraph l; figures 1, 10 * | Examination | US2008237704 | US4291319 | by applicant | US4945394 | US6218254 |