EP2460328 - ADAPTIVE TRANSMISSIONS IN COORDINATED MULTIPLE POINT COMMUNICATIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.12.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 21.12.2018 | ||
Former | Grant of patent is intended Status updated on 31.07.2018 | ||
Former | Examination is in progress Status updated on 06.04.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121 / US | [2012/23] | Inventor(s) | 01 /
LUO, Tao 5775 Morehouse Drive San Diego California 92121 / US | 02 /
MALLADI, Durga Prasad 5775 Morehouse Drive San Diego California 92121 / US | 03 /
ZHANG, Xiaoxia 5775 Morehouse Drive San Diego California 92121 / US | 04 /
WEI, Yongbin 5775 Morehouse Drive San Diego California 92121 / US | 05 /
MONTOJO, Juan 5775 Morehouse Drive San Diego California 92121 / US | 06 /
LIU, Ke 5775 Morehouse Drive San Diego California 92121 / US | [2012/23] | Representative(s) | Wegner, Hans Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2019/04] |
Former [2012/23] | Wegner, Hans Bardehle Pagenberg Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 10745042.1 | 28.07.2010 | [2019/04] | WO2010US43594 | Priority number, date | US20090229702P | 29.07.2009 Original published format: US 229702 P | US20100842752 | 23.07.2010 Original published format: US 842752 | [2012/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2011014583 | Date: | 03.02.2011 | Language: | EN | [2011/05] | Type: | A2 Application without search report | No.: | EP2460328 | Date: | 06.06.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.02.2011 takes the place of the publication of the European patent application. | [2012/23] | Type: | B1 Patent specification | No.: | EP2460328 | Date: | 23.01.2019 | Language: | EN | [2019/04] | Search report(s) | International search report - published on: | EP | 31.03.2011 | Classification | IPC: | H04L25/02 | [2012/23] | CPC: |
H04L25/0224 (EP,BR,KR,US);
H04B7/024 (EP,BR,KR,US);
H04B1/005 (KR);
H04B7/0417 (EP,BR,KR,US);
H04B7/0482 (KR);
H04B7/0639 (KR)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/23] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | ADAPTIVE ÜBERTRAGUNGEN BEI KOORDINIERTER MEHRPUNKT-KOMMUNIKATION | [2012/23] | English: | ADAPTIVE TRANSMISSIONS IN COORDINATED MULTIPLE POINT COMMUNICATIONS | [2012/23] | French: | TRANSMISSIONS ADAPTATIVES DANS DES COMMUNICATIONS MULTIPOINTS COORDONNÉES | [2012/23] | Entry into regional phase | 01.02.2012 | National basic fee paid | 01.02.2012 | Designation fee(s) paid | 01.02.2012 | Examination fee paid | Examination procedure | 01.02.2012 | Examination requested [2012/23] | 14.09.2012 | Amendment by applicant (claims and/or description) | 17.01.2013 | Despatch of a communication from the examining division (Time limit: M06) | 19.07.2013 | Reply to a communication from the examining division | 22.03.2018 | Despatch of a communication from the examining division (Time limit: M02) | 29.05.2018 | Reply to a communication from the examining division | 01.08.2018 | Communication of intention to grant the patent | 10.12.2018 | Fee for grant paid | 10.12.2018 | Fee for publishing/printing paid | 10.12.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.01.2013 | Opposition(s) | 24.10.2019 | No opposition filed within time limit [2020/01] | Fees paid | Renewal fee | 27.06.2012 | Renewal fee patent year 03 | 08.07.2013 | Renewal fee patent year 04 | 08.07.2014 | Renewal fee patent year 05 | 09.07.2015 | Renewal fee patent year 06 | 11.07.2016 | Renewal fee patent year 07 | 10.07.2017 | Renewal fee patent year 08 | 09.07.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.07.2010 | AL | 23.01.2019 | AT | 23.01.2019 | CY | 23.01.2019 | CZ | 23.01.2019 | DK | 23.01.2019 | EE | 23.01.2019 | ES | 23.01.2019 | FI | 23.01.2019 | HR | 23.01.2019 | IT | 23.01.2019 | LT | 23.01.2019 | LV | 23.01.2019 | MC | 23.01.2019 | MK | 23.01.2019 | MT | 23.01.2019 | NL | 23.01.2019 | PL | 23.01.2019 | RO | 23.01.2019 | SE | 23.01.2019 | SI | 23.01.2019 | SK | 23.01.2019 | SM | 23.01.2019 | TR | 23.01.2019 | BG | 23.04.2019 | NO | 23.04.2019 | GR | 24.04.2019 | IS | 23.05.2019 | PT | 23.05.2019 | IE | 28.07.2019 | LU | 28.07.2019 | BE | 31.07.2019 | CH | 31.07.2019 | LI | 31.07.2019 | [2022/31] |
Former [2021/34] | HU | 28.07.2010 | |
AL | 23.01.2019 | ||
AT | 23.01.2019 | ||
CY | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
MC | 23.01.2019 | ||
MT | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
TR | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2021/32] | HU | 28.07.2010 | |
AL | 23.01.2019 | ||
AT | 23.01.2019 | ||
CY | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
MC | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
TR | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2021/26] | AL | 23.01.2019 | |
AT | 23.01.2019 | ||
CY | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
MC | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
TR | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2020/36] | AL | 23.01.2019 | |
AT | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
MC | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
TR | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2020/25] | AL | 23.01.2019 | |
AT | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
MC | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
TR | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
LU | 28.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
Former [2020/17] | AL | 23.01.2019 | |
AT | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
MC | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
TR | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2020/14] | AL | 23.01.2019 | |
AT | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
MC | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2020/13] | AL | 23.01.2019 | |
AT | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SI | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2020/03] | AL | 23.01.2019 | |
AT | 23.01.2019 | ||
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2019/52] | AL | 23.01.2019 | |
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SK | 23.01.2019 | ||
SM | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2019/49] | AL | 23.01.2019 | |
CZ | 23.01.2019 | ||
DK | 23.01.2019 | ||
EE | 23.01.2019 | ||
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
RO | 23.01.2019 | ||
SE | 23.01.2019 | ||
SK | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2019/48] | DK | 23.01.2019 | |
ES | 23.01.2019 | ||
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
SE | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2019/46] | ES | 23.01.2019 | |
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
IT | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
SE | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2019/39] | ES | 23.01.2019 | |
FI | 23.01.2019 | ||
HR | 23.01.2019 | ||
LT | 23.01.2019 | ||
LV | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
SE | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
IS | 23.05.2019 | ||
PT | 23.05.2019 | ||
Former [2019/38] | ES | 23.01.2019 | |
FI | 23.01.2019 | ||
LT | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
SE | 23.01.2019 | ||
BG | 23.04.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
PT | 23.05.2019 | ||
Former [2019/37] | ES | 23.01.2019 | |
FI | 23.01.2019 | ||
LT | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
SE | 23.01.2019 | ||
NO | 23.04.2019 | ||
GR | 24.04.2019 | ||
PT | 23.05.2019 | ||
Former [2019/35] | ES | 23.01.2019 | |
FI | 23.01.2019 | ||
LT | 23.01.2019 | ||
NL | 23.01.2019 | ||
PL | 23.01.2019 | ||
SE | 23.01.2019 | ||
NO | 23.04.2019 | ||
PT | 23.05.2019 | ||
Former [2019/34] | FI | 23.01.2019 | |
LT | 23.01.2019 | ||
NL | 23.01.2019 | ||
SE | 23.01.2019 | ||
NO | 23.04.2019 | ||
PT | 23.05.2019 | ||
Former [2019/33] | FI | 23.01.2019 | |
LT | 23.01.2019 | ||
NL | 23.01.2019 | ||
NO | 23.04.2019 | ||
PT | 23.05.2019 | ||
Former [2019/30] | NL | 23.01.2019 | Cited in | International search | [Y]WO2005091517 (TELECOM ITALIA SPA [IT], et al) [Y] 1,4,5,7,8,10,11,13,14,17,22 * page 8, line 21 - line 32 * * page 9, line 15 - page 10, line 4 * * page 10, lines 18-22 * * page 11, lines 12-17 * * page 12, lines 15-34 * * page 16, lines 11-30 * * page 17, line 12 - page 18, line 8 * * page 19, line 5 - page 20, line 17 * * page 22, lines 3-7 *; | [Y]WO2008111798 (LG ELECTRONICS INC [KR], et al) [Y] 23,24,28,33,34,41,42,48,49,56,57 * paragraph [0134] - paragraph [0153] * * figures 9-11 *; | [XY] - ERICSSON, "UE specific reference signal pattern", 3GPP DRAFT; R1-080506, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080110), vol. RAN WG1, no. Sevilla, Spain; 20080110, XP050109022 [X] 1,5,8,11,14,15 * § 2, first paragraph § 3.1 § 3.2, fourth paragraph § 4.2 § 5 * [Y] 1-14,16,17 | [X] - FUJITSU, "Pseudo Transmission Timing Control using Cyclic Shift for Downlink CoMP Joint Transmission", 3GPP DRAFT; R1-091956, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090428), no. San Francisco, USA; 20090428, XP050339429 [X] 1,5,8,11,14,15 * § 1, 2, 2.1, 2.2, 4. Figures 2, 4 Table 1 * | [XY] - MOTOROLA, "Coordinated Multi-Point Transmission --- Coordinated Beamforming/Precoding and Some Performance Results", 3GPP DRAFT; R1-090325 COMP RESULTS (MOTOROLA), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090108), no. Ljubljana; 20090108, XP050318236 [X] 18,25,29,35,37,44,50,52 * § 2 * [Y] 2,3,6,9,12,16,19-24,26-28,30-34,36,38-43,45-49,51,53-58 | [XY] - MOTOROLA, "Coordinated Multi-Point Transmission - Exploring Possible System Operations and UE Support", 3GPP DRAFT; R1-084407 COORDINATED MULTI-POINT TRANSMISSION (MOTOROLA), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20081105), no. Prague, Czech Republic; 20081105, XP050317669 [X] 18,29,37,44,52 * § 3, page 3, second last paragraph, page 4, last point * [Y] 2,3,6,9,12,16 | [Y] - Section 3.9.1, "Estimating the ST channel at the receiver", Section 3.9.1, Arogyaswami Paulraj, Rohit Nabar, Dhananjay Gore, Introduction to Space-Time Wireless Communications, Cambridge (UK), Cambridge University Press, (20030531), pages 56 - 57, ISBN 0521826152, XP002618821 [Y] 1,4,5,7,8,10,11,13,14,17 * § 3.9.1, page 57. * | [Y] - CATT, "Aspects of Joint Processing in Downlink CoMP", 3GPP DRAFT; R1-090193, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090108), no. Ljubljana; 20090108, XP050318126 [Y] 19,21,27,30,32,38,40,45,47,53,55 * § 3.1, point 2) * | [Y] - QUALCOMM EUROPE, "Impact of Downlink CoMP on the Air Interface", 3GPP DRAFT; R1-090366, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090108), no. Ljubljana; 20090108, XP050318270 [Y] 19,21,27,30,32,38,40,45,47,53,55 * § 2.3 * | [Y] - QUALCOMM EUROPE, "Feedback considerations for DL MIMO and CoMP", 3GPP DRAFT; R1-092055 FEEDBACK CONSIDERATIONS FOR DL MIMO AND COMP, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090428), no. San Francisco, USA; 20090428, XP050339514 [Y] 20,26,31,36,39,43,46,51,54,58 * § 4, page 4/7, second list point, page 5/7, last paragraph, § 5, last point * | [YA] - PHILIPS, "Performance of LTE DL MU-MIMO with dedicated pilots", 3GPP DRAFT; R1-071403, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070403), vol. RAN WG1, no. St. Julian; 20070403, XP050105346 [Y] 23,24,28,33,34,41,42,48,49,56,57 * § 1 § 2, last paragraph § 4 * [A] 1,5,8,11,14,15 | Examination | - HUAWEI ET AL, "Further Discussions on the Downlink Coordinated Transmission - Impact on the Radio Interface", 3GPP DRAFT; R1-090129 FURTHER DISCUSSIONS ON DOWNLINK COORDINATED TRANSMISSION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090107), no. Ljubljana; 20090107, XP050318067 | - NORTEL, "Performance evaluation of CoMP solutions", 3GPP DRAFT; R1-090142(NORTEL-MULTISITE_MIMO_COOPERATION_LL_RESULTS), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090107), no. Ljubljana; 20090107, XP050318078 |