blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2460328

EP2460328 - ADAPTIVE TRANSMISSIONS IN COORDINATED MULTIPLE POINT COMMUNICATIONS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.12.2019
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  21.12.2018
FormerGrant of patent is intended
Status updated on  31.07.2018
FormerExamination is in progress
Status updated on  06.04.2018
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, CA 92121 / US
[2012/23]
Inventor(s)01 / LUO, Tao
5775 Morehouse Drive
San Diego California 92121 / US
02 / MALLADI, Durga Prasad
5775 Morehouse Drive
San Diego California 92121 / US
03 / ZHANG, Xiaoxia
5775 Morehouse Drive
San Diego California 92121 / US
04 / WEI, Yongbin
5775 Morehouse Drive
San Diego California 92121 / US
05 / MONTOJO, Juan
5775 Morehouse Drive
San Diego California 92121 / US
06 / LIU, Ke
5775 Morehouse Drive
San Diego California 92121 / US
 [2012/23]
Representative(s)Wegner, Hans
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2019/04]
Former [2012/23]Wegner, Hans
Bardehle Pagenberg
Prinzregentenplatz 7
81675 München / DE
Application number, filing date10745042.128.07.2010
[2019/04]
WO2010US43594
Priority number, dateUS20090229702P29.07.2009         Original published format: US 229702 P
US2010084275223.07.2010         Original published format: US 842752
[2012/23]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2011014583
Date:03.02.2011
Language:EN
[2011/05]
Type: A2 Application without search report 
No.:EP2460328
Date:06.06.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 03.02.2011 takes the place of the publication of the European patent application.
[2012/23]
Type: B1 Patent specification 
No.:EP2460328
Date:23.01.2019
Language:EN
[2019/04]
Search report(s)International search report - published on:EP31.03.2011
ClassificationIPC:H04L25/02
[2012/23]
CPC:
H04L25/0224 (EP,BR,KR,US); H04B7/024 (EP,BR,KR,US); H04B1/005 (KR);
H04B7/0417 (EP,BR,KR,US); H04B7/0482 (KR); H04B7/0639 (KR)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/23]
Extension statesBANot yet paid
MENot yet paid
RSNot yet paid
TitleGerman:ADAPTIVE ÜBERTRAGUNGEN BEI KOORDINIERTER MEHRPUNKT-KOMMUNIKATION[2012/23]
English:ADAPTIVE TRANSMISSIONS IN COORDINATED MULTIPLE POINT COMMUNICATIONS[2012/23]
French:TRANSMISSIONS ADAPTATIVES DANS DES COMMUNICATIONS MULTIPOINTS COORDONNÉES[2012/23]
Entry into regional phase01.02.2012National basic fee paid 
01.02.2012Designation fee(s) paid 
01.02.2012Examination fee paid 
Examination procedure01.02.2012Examination requested  [2012/23]
14.09.2012Amendment by applicant (claims and/or description)
17.01.2013Despatch of a communication from the examining division (Time limit: M06)
19.07.2013Reply to a communication from the examining division
22.03.2018Despatch of a communication from the examining division (Time limit: M02)
29.05.2018Reply to a communication from the examining division
01.08.2018Communication of intention to grant the patent
10.12.2018Fee for grant paid
10.12.2018Fee for publishing/printing paid
10.12.2018Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  17.01.2013
Opposition(s)24.10.2019No opposition filed within time limit [2020/01]
Fees paidRenewal fee
27.06.2012Renewal fee patent year 03
08.07.2013Renewal fee patent year 04
08.07.2014Renewal fee patent year 05
09.07.2015Renewal fee patent year 06
11.07.2016Renewal fee patent year 07
10.07.2017Renewal fee patent year 08
09.07.2018Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.07.2010
AL23.01.2019
AT23.01.2019
CY23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
MK23.01.2019
MT23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
IE28.07.2019
LU28.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
[2022/31]
Former [2021/34]HU28.07.2010
AL23.01.2019
AT23.01.2019
CY23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
MT23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
IE28.07.2019
LU28.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2021/32]HU28.07.2010
AL23.01.2019
AT23.01.2019
CY23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
IE28.07.2019
LU28.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2021/26]AL23.01.2019
AT23.01.2019
CY23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
IE28.07.2019
LU28.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2020/36]AL23.01.2019
AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
IE28.07.2019
LU28.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2020/25]AL23.01.2019
AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
LU28.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2020/17]AL23.01.2019
AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
TR23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2020/14]AL23.01.2019
AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
MC23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2020/13]AL23.01.2019
AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SI23.01.2019
SK23.01.2019
SM23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2020/03]AL23.01.2019
AT23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SK23.01.2019
SM23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/52]AL23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SK23.01.2019
SM23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/49]AL23.01.2019
CZ23.01.2019
DK23.01.2019
EE23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
RO23.01.2019
SE23.01.2019
SK23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/48]DK23.01.2019
ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/46]ES23.01.2019
FI23.01.2019
HR23.01.2019
IT23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/39]ES23.01.2019
FI23.01.2019
HR23.01.2019
LT23.01.2019
LV23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
IS23.05.2019
PT23.05.2019
Former [2019/38]ES23.01.2019
FI23.01.2019
LT23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
BG23.04.2019
NO23.04.2019
GR24.04.2019
PT23.05.2019
Former [2019/37]ES23.01.2019
FI23.01.2019
LT23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
NO23.04.2019
GR24.04.2019
PT23.05.2019
Former [2019/35]ES23.01.2019
FI23.01.2019
LT23.01.2019
NL23.01.2019
PL23.01.2019
SE23.01.2019
NO23.04.2019
PT23.05.2019
Former [2019/34]FI23.01.2019
LT23.01.2019
NL23.01.2019
SE23.01.2019
NO23.04.2019
PT23.05.2019
Former [2019/33]FI23.01.2019
LT23.01.2019
NL23.01.2019
NO23.04.2019
PT23.05.2019
Former [2019/30]NL23.01.2019
Cited inInternational search[Y]WO2005091517  (TELECOM ITALIA SPA [IT], et al) [Y] 1,4,5,7,8,10,11,13,14,17,22 * page 8, line 21 - line 32 * * page 9, line 15 - page 10, line 4 * * page 10, lines 18-22 * * page 11, lines 12-17 * * page 12, lines 15-34 * * page 16, lines 11-30 * * page 17, line 12 - page 18, line 8 * * page 19, line 5 - page 20, line 17 * * page 22, lines 3-7 *;
 [Y]WO2008111798  (LG ELECTRONICS INC [KR], et al) [Y] 23,24,28,33,34,41,42,48,49,56,57 * paragraph [0134] - paragraph [0153] * * figures 9-11 *;
 [XY]  - ERICSSON, "UE specific reference signal pattern", 3GPP DRAFT; R1-080506, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080110), vol. RAN WG1, no. Sevilla, Spain; 20080110, XP050109022 [X] 1,5,8,11,14,15 * § 2, first paragraph § 3.1 § 3.2, fourth paragraph § 4.2 § 5 * [Y] 1-14,16,17
 [X]  - FUJITSU, "Pseudo Transmission Timing Control using Cyclic Shift for Downlink CoMP Joint Transmission", 3GPP DRAFT; R1-091956, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090428), no. San Francisco, USA; 20090428, XP050339429 [X] 1,5,8,11,14,15 * § 1, 2, 2.1, 2.2, 4. Figures 2, 4 Table 1 *
 [XY]  - MOTOROLA, "Coordinated Multi-Point Transmission --- Coordinated Beamforming/Precoding and Some Performance Results", 3GPP DRAFT; R1-090325 COMP RESULTS (MOTOROLA), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090108), no. Ljubljana; 20090108, XP050318236 [X] 18,25,29,35,37,44,50,52 * § 2 * [Y] 2,3,6,9,12,16,19-24,26-28,30-34,36,38-43,45-49,51,53-58
 [XY]  - MOTOROLA, "Coordinated Multi-Point Transmission - Exploring Possible System Operations and UE Support", 3GPP DRAFT; R1-084407 COORDINATED MULTI-POINT TRANSMISSION (MOTOROLA), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20081105), no. Prague, Czech Republic; 20081105, XP050317669 [X] 18,29,37,44,52 * § 3, page 3, second last paragraph, page 4, last point * [Y] 2,3,6,9,12,16
 [Y]  - Section 3.9.1, "Estimating the ST channel at the receiver", Section 3.9.1, Arogyaswami Paulraj, Rohit Nabar, Dhananjay Gore, Introduction to Space-Time Wireless Communications, Cambridge (UK), Cambridge University Press, (20030531), pages 56 - 57, ISBN 0521826152, XP002618821 [Y] 1,4,5,7,8,10,11,13,14,17 * § 3.9.1, page 57. *
 [Y]  - CATT, "Aspects of Joint Processing in Downlink CoMP", 3GPP DRAFT; R1-090193, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090108), no. Ljubljana; 20090108, XP050318126 [Y] 19,21,27,30,32,38,40,45,47,53,55 * § 3.1, point 2) *
 [Y]  - QUALCOMM EUROPE, "Impact of Downlink CoMP on the Air Interface", 3GPP DRAFT; R1-090366, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090108), no. Ljubljana; 20090108, XP050318270 [Y] 19,21,27,30,32,38,40,45,47,53,55 * § 2.3 *
 [Y]  - QUALCOMM EUROPE, "Feedback considerations for DL MIMO and CoMP", 3GPP DRAFT; R1-092055 FEEDBACK CONSIDERATIONS FOR DL MIMO AND COMP, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090428), no. San Francisco, USA; 20090428, XP050339514 [Y] 20,26,31,36,39,43,46,51,54,58 * § 4, page 4/7, second list point, page 5/7, last paragraph, § 5, last point *
 [YA]  - PHILIPS, "Performance of LTE DL MU-MIMO with dedicated pilots", 3GPP DRAFT; R1-071403, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070403), vol. RAN WG1, no. St. Julian; 20070403, XP050105346 [Y] 23,24,28,33,34,41,42,48,49,56,57 * § 1 § 2, last paragraph § 4 * [A] 1,5,8,11,14,15
Examination   - HUAWEI ET AL, "Further Discussions on the Downlink Coordinated Transmission - Impact on the Radio Interface", 3GPP DRAFT; R1-090129 FURTHER DISCUSSIONS ON DOWNLINK COORDINATED TRANSMISSION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090107), no. Ljubljana; 20090107, XP050318067
    - NORTEL, "Performance evaluation of CoMP solutions", 3GPP DRAFT; R1-090142(NORTEL-MULTISITE_MIMO_COOPERATION_LL_RESULTS), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090107), no. Ljubljana; 20090107, XP050318078
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.