| EP2459787 - METHOD FOR MANUFACTURING A MINERAL FIBRE-CONTAINING ELEMENT AND ELEMENT PRODUCED BY THAT METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.12.2019 Database last updated on 01.04.2026 | |
| Former | The patent has been granted Status updated on 18.01.2019 | ||
| Former | Grant of patent is intended Status updated on 20.09.2018 | ||
| Former | Examination is in progress Status updated on 07.07.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Rockwool International A/S Hovedgaden 584 2640 Hedehusene / DK | [2017/06] |
| Former [2012/23] | For all designated states Rockwool International A/S 584 Hovedgaden 2460 Hedehusene / DK | Inventor(s) | 01 /
ROSENBERG, Gorm Ramsobakken 46 DK-4621 Gadstrup / DK | 02 /
CHRISTENSEN, Kenn Naurbjergvej 44A DK-4622 Havdrup / DK | [2012/23] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/08] |
| Former [2012/23] | Samuels, Lucy Alice Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | Application number, filing date | 10745585.9 | 30.07.2010 | [2019/08] | WO2010EP61151 | Priority number, date | EP20090167034 | 31.07.2009 Original published format: EP 09167034 | [2012/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011012712 | Date: | 03.02.2011 | Language: | EN | [2011/05] | Type: | A1 Application with search report | No.: | EP2459787 | Date: | 06.06.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.02.2011 takes the place of the publication of the European patent application. | [2012/23] | Type: | B1 Patent specification | No.: | EP2459787 | Date: | 20.02.2019 | Language: | EN | [2019/08] | Search report(s) | International search report - published on: | EP | 03.02.2011 | Classification | IPC: | B29C67/24, D04H1/4209, D04H1/4218, D04H1/4226, D04H1/587, D04H1/64, D04H1/60, D04H1/732, D04H1/736, D01G9/16, D04H1/72, D04H1/54, D01G9/06, D04H1/645, D01G23/02, D01G23/08 | [2018/41] | CPC: |
D04H1/72 (EP,US);
B29C67/248 (US);
B29C67/249 (US);
D01G23/02 (US);
D01G23/08 (US);
D01G9/06 (US);
D01G9/16 (US);
D04H1/4209 (EP,US);
D04H1/4218 (EP,US);
D04H1/4226 (EP,US);
D04H1/54 (EP,US);
D04H1/587 (EP,US);
D04H1/60 (US);
D04H1/64 (US);
D04H1/645 (EP,US);
|
| Former IPC [2012/23] | D04H1/72, D04H13/00, D04H1/54, B27N3/14, D01G9/00, D01G9/06, D01G9/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/23] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES MINERALFASERELEMENT UND DESSEN HERGESTELLETES ELEMENT | [2018/41] | English: | METHOD FOR MANUFACTURING A MINERAL FIBRE-CONTAINING ELEMENT AND ELEMENT PRODUCED BY THAT METHOD | [2012/23] | French: | METHODE DE FABRICATION D'UN ELEMENT CONTENANT DES FIBRES MINERALES ET ELEMENT AINSI PRODUIT | [2018/42] |
| Former [2012/23] | VERFAHREN ZUR HERSTELLUNG EINES MINERALFASERHALTIGEN ELEMENTS UND MIT DIESEM VERFAHREN HERGESTELLTES ELEMENT | ||
| Former [2012/23] | PROCÉDÉ DE FABRICATION D'UN ÉLÉMENT CONTENANT UNE FIBRE MINÉRALE ET ÉLÉMENT PRODUIT PAR CE PROCÉDÉ | Entry into regional phase | 17.02.2012 | National basic fee paid | 17.02.2012 | Designation fee(s) paid | 17.02.2012 | Examination fee paid | Examination procedure | 17.02.2012 | Examination requested [2012/23] | 17.09.2012 | Amendment by applicant (claims and/or description) | 05.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 14.11.2017 | Reply to a communication from the examining division | 21.09.2018 | Communication of intention to grant the patent | 07.01.2019 | Fee for grant paid | 07.01.2019 | Fee for publishing/printing paid | 07.01.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.07.2017 | Opposition(s) | 21.11.2019 | No opposition filed within time limit [2020/05] | Fees paid | Renewal fee | 13.07.2012 | Renewal fee patent year 03 | 10.07.2013 | Renewal fee patent year 04 | 14.07.2014 | Renewal fee patent year 05 | 10.07.2015 | Renewal fee patent year 06 | 11.07.2016 | Renewal fee patent year 07 | 27.07.2017 | Renewal fee patent year 08 | 27.07.2018 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.07.2010 | AL | 20.02.2019 | AT | 20.02.2019 | CY | 20.02.2019 | EE | 20.02.2019 | LT | 20.02.2019 | LV | 20.02.2019 | MC | 20.02.2019 | MK | 20.02.2019 | MT | 20.02.2019 | SE | 20.02.2019 | SK | 20.02.2019 | SM | 20.02.2019 | TR | 20.02.2019 | BG | 20.05.2019 | NO | 20.05.2019 | GR | 21.05.2019 | IS | 20.06.2019 | PT | 20.06.2019 | IE | 30.07.2019 | LU | 30.07.2019 | BE | 31.07.2019 | [2022/31] |
| Former [2021/34] | HU | 30.07.2010 | |
| AL | 20.02.2019 | ||
| AT | 20.02.2019 | ||
| CY | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| MC | 20.02.2019 | ||
| MT | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| TR | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| IE | 30.07.2019 | ||
| LU | 30.07.2019 | ||
| BE | 31.07.2019 | ||
| Former [2021/33] | HU | 30.07.2010 | |
| AL | 20.02.2019 | ||
| AT | 20.02.2019 | ||
| CY | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| MC | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| TR | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| IE | 30.07.2019 | ||
| LU | 30.07.2019 | ||
| BE | 31.07.2019 | ||
| Former [2021/26] | AL | 20.02.2019 | |
| AT | 20.02.2019 | ||
| CY | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| MC | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| TR | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| IE | 30.07.2019 | ||
| LU | 30.07.2019 | ||
| BE | 31.07.2019 | ||
| Former [2020/36] | AL | 20.02.2019 | |
| AT | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| MC | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| TR | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| IE | 30.07.2019 | ||
| LU | 30.07.2019 | ||
| BE | 31.07.2019 | ||
| Former [2020/26] | AL | 20.02.2019 | |
| AT | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| MC | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| TR | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| LU | 30.07.2019 | ||
| BE | 31.07.2019 | ||
| Former [2020/17] | AL | 20.02.2019 | |
| AT | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| MC | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| TR | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| Former [2020/14] | AL | 20.02.2019 | |
| AT | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| MC | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| Former [2020/03] | AL | 20.02.2019 | |
| AT | 20.02.2019 | ||
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| Former [2019/52] | AL | 20.02.2019 | |
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| SM | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| Former [2019/49] | AL | 20.02.2019 | |
| EE | 20.02.2019 | ||
| LT | 20.02.2019 | ||
| LV | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| SK | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| Former [2019/39] | LT | 20.02.2019 | |
| LV | 20.02.2019 | ||
| SE | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| IS | 20.06.2019 | ||
| PT | 20.06.2019 | ||
| Former [2019/38] | LT | 20.02.2019 | |
| SE | 20.02.2019 | ||
| BG | 20.05.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| PT | 20.06.2019 | ||
| Former [2019/37] | LT | 20.02.2019 | |
| SE | 20.02.2019 | ||
| NO | 20.05.2019 | ||
| GR | 21.05.2019 | ||
| PT | 20.06.2019 | ||
| Former [2019/34] | LT | 20.02.2019 | |
| SE | 20.02.2019 | ||
| NO | 20.05.2019 | ||
| PT | 20.06.2019 | ||
| Former [2019/33] | LT | 20.02.2019 | |
| NO | 20.05.2019 | ||
| PT | 20.06.2019 | ||