Extract from the Register of European Patents

EP About this file: EP2459787

EP2459787 - METHOD FOR MANUFACTURING A MINERAL FIBRE-CONTAINING ELEMENT AND ELEMENT PRODUCED BY THAT METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.12.2019
Database last updated on 01.04.2026
FormerThe patent has been granted
Status updated on  18.01.2019
FormerGrant of patent is intended
Status updated on  20.09.2018
FormerExamination is in progress
Status updated on  07.07.2017
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Rockwool International A/S
Hovedgaden 584
2640 Hedehusene / DK
[2017/06]
Former [2012/23]For all designated states
Rockwool International A/S
584 Hovedgaden
2460 Hedehusene / DK
Inventor(s)01 / ROSENBERG, Gorm
Ramsobakken 46
DK-4621 Gadstrup / DK
02 / CHRISTENSEN, Kenn
Naurbjergvej 44A
DK-4622 Havdrup / DK
 [2012/23]
Representative(s)Gill Jennings & Every LLP
The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
[2019/08]
Former [2012/23]Samuels, Lucy Alice
Gill Jennings & Every LLP The Broadgate Tower
20 Primrose Street
London
EC2A 2ES / GB
Application number, filing date10745585.930.07.2010
[2019/08]
WO2010EP61151
Priority number, dateEP2009016703431.07.2009         Original published format: EP 09167034
[2012/23]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2011012712
Date:03.02.2011
Language:EN
[2011/05]
Type: A1 Application with search report 
No.:EP2459787
Date:06.06.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 03.02.2011 takes the place of the publication of the European patent application.
[2012/23]
Type: B1 Patent specification 
No.:EP2459787
Date:20.02.2019
Language:EN
[2019/08]
Search report(s)International search report - published on:EP03.02.2011
ClassificationIPC:B29C67/24, D04H1/4209, D04H1/4218, D04H1/4226, D04H1/587, D04H1/64, D04H1/60, D04H1/732, D04H1/736, D01G9/16, D04H1/72, D04H1/54, D01G9/06, D04H1/645, D01G23/02, D01G23/08
[2018/41]
CPC:
D04H1/72 (EP,US); B29C67/248 (US); B29C67/249 (US);
D01G23/02 (US); D01G23/08 (US); D01G9/06 (US);
D01G9/16 (US); D04H1/4209 (EP,US); D04H1/4218 (EP,US);
D04H1/4226 (EP,US); D04H1/54 (EP,US); D04H1/587 (EP,US);
D04H1/60 (US); D04H1/64 (US); D04H1/645 (EP,US);
D04H1/732 (EP,US); D04H1/736 (US); Y10T442/60 (EP,US) (-)
Former IPC [2012/23]D04H1/72, D04H13/00, D04H1/54, B27N3/14, D01G9/00, D01G9/06, D01G9/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/23]
Extension statesBANot yet paid
MENot yet paid
RSNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES MINERALFASERELEMENT UND DESSEN HERGESTELLETES ELEMENT[2018/41]
English:METHOD FOR MANUFACTURING A MINERAL FIBRE-CONTAINING ELEMENT AND ELEMENT PRODUCED BY THAT METHOD[2012/23]
French:METHODE DE FABRICATION D'UN ELEMENT CONTENANT DES FIBRES MINERALES ET ELEMENT AINSI PRODUIT[2018/42]
Former [2012/23]VERFAHREN ZUR HERSTELLUNG EINES MINERALFASERHALTIGEN ELEMENTS UND MIT DIESEM VERFAHREN HERGESTELLTES ELEMENT
Former [2012/23]PROCÉDÉ DE FABRICATION D'UN ÉLÉMENT CONTENANT UNE FIBRE MINÉRALE ET ÉLÉMENT PRODUIT PAR CE PROCÉDÉ
Entry into regional phase17.02.2012National basic fee paid 
17.02.2012Designation fee(s) paid 
17.02.2012Examination fee paid 
Examination procedure17.02.2012Examination requested  [2012/23]
17.09.2012Amendment by applicant (claims and/or description)
05.07.2017Despatch of a communication from the examining division (Time limit: M04)
14.11.2017Reply to a communication from the examining division
21.09.2018Communication of intention to grant the patent
07.01.2019Fee for grant paid
07.01.2019Fee for publishing/printing paid
07.01.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.07.2017
Opposition(s)21.11.2019No opposition filed within time limit [2020/05]
Fees paidRenewal fee
13.07.2012Renewal fee patent year 03
10.07.2013Renewal fee patent year 04
14.07.2014Renewal fee patent year 05
10.07.2015Renewal fee patent year 06
11.07.2016Renewal fee patent year 07
27.07.2017Renewal fee patent year 08
27.07.2018Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.07.2010
AL20.02.2019
AT20.02.2019
CY20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
MK20.02.2019
MT20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
TR20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
IE30.07.2019
LU30.07.2019
BE31.07.2019
[2022/31]
Former [2021/34]HU30.07.2010
AL20.02.2019
AT20.02.2019
CY20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
MT20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
TR20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
IE30.07.2019
LU30.07.2019
BE31.07.2019
Former [2021/33]HU30.07.2010
AL20.02.2019
AT20.02.2019
CY20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
TR20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
IE30.07.2019
LU30.07.2019
BE31.07.2019
Former [2021/26]AL20.02.2019
AT20.02.2019
CY20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
TR20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
IE30.07.2019
LU30.07.2019
BE31.07.2019
Former [2020/36]AL20.02.2019
AT20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
TR20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
IE30.07.2019
LU30.07.2019
BE31.07.2019
Former [2020/26]AL20.02.2019
AT20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
TR20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
LU30.07.2019
BE31.07.2019
Former [2020/17]AL20.02.2019
AT20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
TR20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
Former [2020/14]AL20.02.2019
AT20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
MC20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
Former [2020/03]AL20.02.2019
AT20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
Former [2019/52]AL20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
SE20.02.2019
SK20.02.2019
SM20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
Former [2019/49]AL20.02.2019
EE20.02.2019
LT20.02.2019
LV20.02.2019
SE20.02.2019
SK20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
Former [2019/39]LT20.02.2019
LV20.02.2019
SE20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
IS20.06.2019
PT20.06.2019
Former [2019/38]LT20.02.2019
SE20.02.2019
BG20.05.2019
NO20.05.2019
GR21.05.2019
PT20.06.2019
Former [2019/37]LT20.02.2019
SE20.02.2019
NO20.05.2019
GR21.05.2019
PT20.06.2019
Former [2019/34]LT20.02.2019
SE20.02.2019
NO20.05.2019
PT20.06.2019
Former [2019/33]LT20.02.2019
NO20.05.2019
PT20.06.2019
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.