EP2402912 - ELECTRONIC TOLL CHARGING SYSTEM AND METHOD [Right-click to bookmark this link] | |||
Former [2012/01] | CHARGING SYSTEM, CHARGING METHOD, CONTROLLER AND PROGRAM | ||
[2020/45] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 11.11.2020 | ||
Former | Examination is in progress Status updated on 20.04.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Mitsubishi Heavy Industries Machinery Systems, Ltd. 1-1, Wadasaki-cho 1-chome Hyogo-ku, Kobe-shi Hyogo 652-8585 / JP | [2018/18] |
Former [2012/01] | For all designated states Mitsubishi Heavy Industries, Ltd. 16-5, Konan 2-chome Minato-ku Tokyo 108-8215 / JP | Inventor(s) | 01 /
MIYAJIMA, Yutaka c/o MITSUBISHI HEAVY INDUSTRIES LTD. KOBE Shipyard&Machinery Works 1-1 Wadasaki-cho 1-chome Hyogo-ku Kobe-shi Hyogo 652-8585 / JP | [2012/01] | Representative(s) | Henkel & Partner mbB Patentanwaltskanzlei, Rechtsanwaltskanzlei Maximiliansplatz 21 80333 München / DE | [2021/14] |
Former [2012/01] | Henkel, Breuer & Partner Patentanwälte Maximiliansplatz 21 80333 München / DE | Application number, filing date | 10746015.6 | 26.02.2010 | [2021/14] | WO2010JP01336 | Priority number, date | JP20090047188 | 27.02.2009 Original published format: JP 2009047188 | [2012/01] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010098132 | Date: | 02.09.2010 | Language: | JA | [2010/35] | Type: | A1 Application with search report | No.: | EP2402912 | Date: | 04.01.2012 | Language: | EN | [2012/01] | Type: | B1 Patent specification | No.: | EP2402912 | Date: | 07.04.2021 | Language: | EN | [2021/14] | Search report(s) | International search report - published on: | JP | 02.09.2010 | (Supplementary) European search report - dispatched on: | EP | 31.10.2016 | Classification | IPC: | G07B15/00, G08G1/09, G07B15/06, G07C5/08, // G07C5/00 | [2020/45] | CPC: |
G07B15/00 (EP);
G07B15/06 (EP);
G07C5/0841 (EP);
G07C5/008 (EP)
|
Former IPC [2016/48] | G07B15/00, G08G1/09, G07B15/06 | ||
Former IPC [2012/01] | G07B15/00, G08G1/09 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/01] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | ELEKTRONISCHES MAUTZAHLUNGSSYSTEM UND -VERFAHREN | [2020/45] | English: | ELECTRONIC TOLL CHARGING SYSTEM AND METHOD | [2020/45] | French: | SYSTÈME ÉLECTRONIQUE DE PAIEMENT DE PÉAGE ET PROCÉDÉ ASSOCIÉ | [2020/45] |
Former [2012/01] | LADESYSTEM, LADEVERFAHREN, STEUERGERÄT UND PROGRAMM | ||
Former [2012/01] | CHARGING SYSTEM, CHARGING METHOD, CONTROLLER AND PROGRAM | ||
Former [2012/01] | SYSTÈME DE PÉAGE, PROCÉDÉ DE PÉAGE, DISPOSITIF DE COMMANDE ET PROGRAMME | Entry into regional phase | 31.08.2011 | Translation filed | 31.08.2011 | National basic fee paid | 31.08.2011 | Search fee paid | 31.08.2011 | Designation fee(s) paid | 31.08.2011 | Examination fee paid | Examination procedure | 31.08.2011 | Examination requested [2012/01] | 29.05.2017 | Amendment by applicant (claims and/or description) | 18.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2018 | Reply to a communication from the examining division | 24.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 03.12.2019 | Reply to a communication from the examining division | 28.05.2020 | Despatch of a communication from the examining division (Time limit: M02) | 04.08.2020 | Reply to a communication from the examining division | 12.11.2020 | Communication of intention to grant the patent | 25.02.2021 | Fee for grant paid | 25.02.2021 | Fee for publishing/printing paid | 25.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.04.2018 | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 29.02.2012 | Renewal fee patent year 03 | 28.02.2013 | Renewal fee patent year 04 | 28.02.2014 | Renewal fee patent year 05 | 26.02.2015 | Renewal fee patent year 06 | 25.02.2016 | Renewal fee patent year 07 | 27.02.2017 | Renewal fee patent year 08 | 27.02.2018 | Renewal fee patent year 09 | 27.02.2019 | Renewal fee patent year 10 | 17.02.2020 | Renewal fee patent year 11 | 23.02.2021 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.02.2010 | AT | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | DK | 07.04.2021 | EE | 07.04.2021 | ES | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | IT | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | NL | 07.04.2021 | PL | 07.04.2021 | RO | 07.04.2021 | SE | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | TR | 07.04.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | [2024/29] |
Former [2024/22] | HU | 26.02.2010 | |
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2024/20] | HU | 26.02.2010 | |
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2024/18] | HU | 26.02.2010 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/44] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/36] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/29] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/10] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/08] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/52] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | ||
NL | 07.04.2021 | ||
BG | 07.07.2021 | ||
Former [2021/46] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | Documents cited: | Search | [Y]JPH1127342 (NEC CORP, et al) [Y] 3* abstract *; | [XY]EP1333405 (AISIN SEIKI [JP], et al) [X] 1,4-6 * abstract * * paragraph [0004] - paragraph [0015] * * paragraph [0033] - paragraph [0038] * [Y] 2,3; | [Y]JP2004024607 (KONAMI CO LTD) [Y] 2,3 * abstract * | International search | [Y]JPH1127342 (NEC CORP, et al); | [X]WO0229730 (AISIN SEIKI [JP], et al); | [Y]JP2004024607 (KONAMI CO LTD) | by applicant | JP2004326263 | JP2009047188 |