EP2401575 - METHOD AND APPARATUS FOR GENERATING A DISPLAY OF A THREE-DIMENSIONAL SURFACE [Right-click to bookmark this link] | |||
Former [2012/01] | INTENSITY AND COLOR DISPLAY FOR A THREE-DIMENSIONAL METROLOGY SYSTEM | ||
[2019/31] | Status | No opposition filed within time limit Status updated on 30.10.2020 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 22.11.2019 | ||
Former | Grant of patent is intended Status updated on 14.07.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Dental Imaging Technologies Corporation 2200 Pennsylvania Avenue NW, Suite 800W Washington, DC 20037 / US | [2020/12] |
Former [2019/52] | For all designated states Dimensional Photonics International, Inc. 187 Ballardvale Street Suite A135 Wilmington, Massachusetts 01887 / US | ||
Former [2012/01] | For all designated states Dimensional Photonics International, Inc. 187 Ballardvale Street Suite A135 Wilmington, Massachusetts 01887 / US | Inventor(s) | 01 /
DILLON, Robert, F. 71 Perry Road Bedford, New Hampshire 03110 / US | 02 /
FILLION, Timothy I. 44 Gould Road Bedford, Massachusetts 01730 / US | 03 /
KROHG, Olaf N. 123 Salem Road Topsfield, Massachusetts 01983 / US | 04 /
JUDELL, Neil H. K. Lexington Avenue Cambridge, Massachusetts 02138 / US | [2012/21] |
Former [2012/11] | 01 /
DILLON, Robert, F. 71 Perry Road Bedford New Hampshire 03110 / US | ||
02 /
FILLION, Timothy I. 44 Gould Road Bedford Massachusetts 01730 / US | |||
03 /
KROHG, Olaf N. 123 Salem Road Topsfield Massachusetts 01983 / US | |||
04 /
JUDELL, Neil H. K. Lexington Avenue Cambridge, Massachusetts 02138 / US | |||
Former [2012/01] | 01 /
DILLON, Robert, F. 71 Perry Road Bedford New Hampshire 03110 / US | ||
02 /
FILLION, Timothy I. 44 Gould Road Bedford Massachusetts 01730 / US | |||
03 /
KROHG, Olaf N. 123 Salem Road Topsfield Massachusetts 01983 / US | |||
04 /
JUDELL, Neil H. K. 184 Cabot Street, 2 Newton Massachusetts 02458 / US | Representative(s) | Berggren Oy, Helsinki & Oulu P.O. Box 16 Eteläinen Rautatiekatu 10A 00101 Helsinki / FI | [2019/52] |
Former [2014/46] | Suèr, Steven Johannes, et al Graham Watt & Co LLP St. Botolph's House 7-9 St. Botolph's Road Sevenoaks TN13 3AJ / GB | ||
Former [2012/01] | Greenwood, John David, et al Graham Watt & Co LLP St Botolph's House 7-9 St Botolph's Road Sevenoaks Kent TN13 3AJ / GB | Application number, filing date | 10746665.8 | 19.02.2010 | [2019/52] | WO2010US24702 | Priority number, date | US20090155200P | 25.02.2009 Original published format: US 155200 P | US20090155260P | 25.02.2009 Original published format: US 155260 P | US20090179800P | 20.05.2009 Original published format: US 179800 P | [2012/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010099036 | Date: | 02.09.2010 | Language: | EN | [2010/35] | Type: | A1 Application with search report | No.: | EP2401575 | Date: | 04.01.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.09.2010 takes the place of the publication of the European patent application. | [2012/01] | Type: | B1 Patent specification | No.: | EP2401575 | Date: | 25.12.2019 | Language: | EN | [2019/52] | Search report(s) | International search report - published on: | US | 02.09.2010 | (Supplementary) European search report - dispatched on: | EP | 13.10.2017 | Classification | IPC: | G01B11/25 | [2019/31] | CPC: |
G01B11/2513 (EP,US);
G01B11/2509 (EP,US)
|
Former IPC [2017/46] | G01B11/24, G01B11/25 | ||
Former IPC [2012/01] | G01B11/24 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/01] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR GENERIERUNG EINER ANZEIGE EINER DREIDIMENSIONALEN OBERFLÄCHE | [2019/31] | English: | METHOD AND APPARATUS FOR GENERATING A DISPLAY OF A THREE-DIMENSIONAL SURFACE | [2019/31] | French: | MÉTHODE ET DISPOSITIF DE GÉNÉRATION D'AFFICHAGE D'UNE SURFACE TRIDIMENSIONNELLE | [2019/31] |
Former [2012/01] | INTENSITÄTS- UND FARBANZEIGE FÜR EIN DREIDIMENSIONALES MESSSYSTEM | ||
Former [2012/01] | INTENSITY AND COLOR DISPLAY FOR A THREE-DIMENSIONAL METROLOGY SYSTEM | ||
Former [2012/01] | AFFICHAGE D'INTENSITÉ ET DE COULEUR POUR UN SYSTÈME DE MÉTROLOGIE TRIDIMENSIONNELLE | Entry into regional phase | 04.08.2011 | National basic fee paid | 04.08.2011 | Search fee paid | 04.08.2011 | Designation fee(s) paid | 04.08.2011 | Examination fee paid | Examination procedure | 04.08.2011 | Examination requested [2012/01] | 01.05.2018 | Amendment by applicant (claims and/or description) | 15.07.2019 | Communication of intention to grant the patent | 14.11.2019 | Fee for grant paid | 14.11.2019 | Fee for publishing/printing paid | 14.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.07.2019 | Opposition(s) | 28.09.2020 | No opposition filed within time limit [2020/49] | Fees paid | Renewal fee | 24.02.2012 | Renewal fee patent year 03 | 27.02.2013 | Renewal fee patent year 04 | 27.02.2014 | Renewal fee patent year 05 | 26.02.2015 | Renewal fee patent year 06 | 26.02.2016 | Renewal fee patent year 07 | 27.02.2017 | Renewal fee patent year 08 | 27.02.2018 | Renewal fee patent year 09 | 27.02.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.02.2010 | AT | 25.12.2019 | CY | 25.12.2019 | CZ | 25.12.2019 | EE | 25.12.2019 | ES | 25.12.2019 | HR | 25.12.2019 | LT | 25.12.2019 | LV | 25.12.2019 | MC | 25.12.2019 | MK | 25.12.2019 | MT | 25.12.2019 | PL | 25.12.2019 | RO | 25.12.2019 | SE | 25.12.2019 | SI | 25.12.2019 | SK | 25.12.2019 | SM | 25.12.2019 | TR | 25.12.2019 | IE | 19.02.2020 | LU | 19.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | BG | 25.03.2020 | GB | 25.03.2020 | NO | 25.03.2020 | GR | 26.03.2020 | IS | 25.04.2020 | PT | 20.05.2020 | [2022/32] |
Former [2022/27] | HU | 19.02.2010 | |
AT | 25.12.2019 | ||
CY | 25.12.2019 | ||
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
MT | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
TR | 25.12.2019 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 25.03.2020 | ||
GB | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2022/26] | AT | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
TR | 25.12.2019 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 25.03.2020 | ||
GB | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/22] | AT | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 25.03.2020 | ||
GB | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/11] | AT | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/08] | CZ | 25.12.2019 | |
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/51] | CZ | 25.12.2019 | |
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/49] | CZ | 25.12.2019 | |
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
LU | 19.02.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/47] | CZ | 25.12.2019 | |
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
LU | 19.02.2020 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/40] | CZ | 25.12.2019 | |
EE | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/37] | CZ | 25.12.2019 | |
EE | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/36] | CZ | 25.12.2019 | |
EE | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/35] | CZ | 25.12.2019 | |
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RO | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/25] | HR | 25.12.2019 | |
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/23] | LT | 25.12.2019 | |
LV | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/22] | LT | 25.12.2019 | |
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
Former [2020/21] | NO | 25.03.2020 | Documents cited: | Search | [XY]US2004240754 (SMITH MELVYN LIONEL [GB], et al) [X] 1-3,8,9 * paragraphs [0053] , [0135] - paragraph [0139]; figures 1-36; claim 1 * * paragraph [0145] - paragraph [0147] * [Y] 1-15; | [Y]EP0895577 (LEICA GEOSYSTEMS HDS LLC [US]) [Y] 1-15 * the whole document *; | [XY]WO2006084385 (MACDONALD DETTWILER & ASSOCIAT [CA], et al) [X] 1,8 * page 14, line 3 - page 17, line 15; figures 1-9 * [Y] 1-15; | [Y]US2006184040 (KELLER KURTIS P [US], et al) [Y] 1-15 * the whole document *; | [Y]US7098435 (MUELLER FREDERICK E [US], et al) [Y] 1-15 * the whole document *; | [Y]US2006281041 (RUBBERT RUDGER [DE], et al) [Y] 1-15 * the whole document *; | [Y]US7187809 (ZHAO WENYI [US], et al) [Y] 1-15* the whole document *; | [E]US2016364903 (GORDON EYAL [IL], et al) [E] 1-15 * the whole document * | International search | [X]US2004240754 (SMITH MELVYN LIONEL [GB], et al); | [Y]EP0895577 (LEICA GEOSYSTEMS HDS LLC [US]); | [Y]US2006184040 (KELLER KURTIS P [US], et al); | [A]US7098435 (MUELLER FREDERICK E [US], et al); | [Y]US2006281041 (RUBBERT RUDGER [DE], et al); | [A]US7187809 (ZHAO WENYI [US], et al) |