EP2410539 - POLYPROPYLENE FOR FILM CAPACITOR, POLYPROPYLENE SHEET FOR FILM CAPACITOR, METHODS FOR PRODUCING SAME, AND USES OF SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.12.2019 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 18.01.2019 | ||
Former | Grant of patent is intended Status updated on 22.10.2018 | ||
Former | Examination is in progress Status updated on 25.05.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Prime Polymer Co., Ltd. 5-2, Higashi-Shimbashi 1-chome Minato-ku Tokyo 105-7117 / JP | [2012/04] | Inventor(s) | 01 /
TAN, Noriko c/o PRIME POLYMER CO. LTD. 580-32 Nagaura Sodegaura-shi Chiba 299-0265 / JP | 02 /
TAMURA, Satoshi c/o PRIME POLYMER CO. LTD. 580-32 Nagaura Sodegaura-shi Chiba 299-0265 / JP | [2012/04] | Representative(s) | J A Kemp LLP 80 Turnmill Street London EC1M 5QU / GB | [N/P] |
Former [2019/08] | J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | ||
Former [2012/04] | Raynor, Stuart Andrew J.A. Kemp & Co. 14 South Square Gray's Inn London WC1R 5JJ / GB | Application number, filing date | 10753544.5 | 17.03.2010 | [2019/08] | WO2010JP54519 | Priority number, date | JP20090064805 | 17.03.2009 Original published format: JP 2009064805 | [2012/04] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010107052 | Date: | 23.09.2010 | Language: | JA | [2010/38] | Type: | A1 Application with search report | No.: | EP2410539 | Date: | 25.01.2012 | Language: | EN | [2012/04] | Type: | B1 Patent specification | No.: | EP2410539 | Date: | 20.02.2019 | Language: | EN | [2019/08] | Search report(s) | International search report - published on: | JP | 23.09.2010 | (Supplementary) European search report - dispatched on: | EP | 01.10.2015 | Classification | IPC: | H01G4/18, C08L23/12 | [2015/45] | CPC: |
H01G4/18 (EP,KR,US);
C08L23/12 (EP,KR,US);
H01G4/33 (KR);
C08L2312/00 (EP,KR,US);
C08L2312/06 (EP,KR,US);
Y02T10/70 (EP,KR,US)
|
Former IPC [2012/04] | H01G4/18 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/04] | Extension states | AL | Not yet paid | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | POLYPROPYLEN FÜR FILMKONDENSATOR, POLYPROPYLENFOLIE FÜR FILMKONDENSATOR, HERSTELLUNGSVERFAHREN DAFÜR UND VERWENDUNG | [2012/04] | English: | POLYPROPYLENE FOR FILM CAPACITOR, POLYPROPYLENE SHEET FOR FILM CAPACITOR, METHODS FOR PRODUCING SAME, AND USES OF SAME | [2012/04] | French: | POLYPROPYLÈNE POUR CONDENSATEUR À FILM, FEUILLE DE POLYPROPYLÈNE POUR CONDENSATEUR À FILM, PROCÉDÉS DE PRODUCTION DE CEUX-CI ET LEURS UTILISATIONS | [2012/04] | Entry into regional phase | 16.09.2011 | Translation filed | 16.09.2011 | National basic fee paid | 16.09.2011 | Search fee paid | 16.09.2011 | Designation fee(s) paid | 16.09.2011 | Examination fee paid | Examination procedure | 16.09.2011 | Examination requested [2012/04] | 07.04.2016 | Amendment by applicant (claims and/or description) | 29.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 10.09.2018 | Reply to a communication from the examining division | 23.10.2018 | Communication of intention to grant the patent | 08.01.2019 | Fee for grant paid | 08.01.2019 | Fee for publishing/printing paid | 08.01.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.05.2018 | Opposition(s) | 21.11.2019 | No opposition filed within time limit [2020/05] | Fees paid | Renewal fee | 14.03.2012 | Renewal fee patent year 03 | 11.03.2013 | Renewal fee patent year 04 | 12.03.2014 | Renewal fee patent year 05 | 10.03.2015 | Renewal fee patent year 06 | 10.03.2016 | Renewal fee patent year 07 | 10.03.2017 | Renewal fee patent year 08 | 13.03.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.03.2010 | AT | 20.02.2019 | CY | 20.02.2019 | CZ | 20.02.2019 | DK | 20.02.2019 | EE | 20.02.2019 | ES | 20.02.2019 | FI | 20.02.2019 | HR | 20.02.2019 | IT | 20.02.2019 | LT | 20.02.2019 | LV | 20.02.2019 | MC | 20.02.2019 | MK | 20.02.2019 | NL | 20.02.2019 | PL | 20.02.2019 | RO | 20.02.2019 | SE | 20.02.2019 | SI | 20.02.2019 | SK | 20.02.2019 | SM | 20.02.2019 | TR | 20.02.2019 | IE | 17.03.2019 | LU | 17.03.2019 | MT | 17.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | BG | 20.05.2019 | NO | 20.05.2019 | GR | 21.05.2019 | IS | 20.06.2019 | PT | 20.06.2019 | [2022/31] |
Former [2021/32] | HU | 17.03.2010 | |
AT | 20.02.2019 | ||
CY | 20.02.2019 | ||
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
IE | 17.03.2019 | ||
LU | 17.03.2019 | ||
MT | 17.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2021/26] | AT | 20.02.2019 | |
CY | 20.02.2019 | ||
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
IE | 17.03.2019 | ||
LU | 17.03.2019 | ||
MT | 17.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/29] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
IE | 17.03.2019 | ||
LU | 17.03.2019 | ||
MT | 17.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/17] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
TR | 20.02.2019 | ||
IE | 17.03.2019 | ||
LU | 17.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/11] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SI | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
IE | 17.03.2019 | ||
LU | 17.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/09] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
IE | 17.03.2019 | ||
LU | 17.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/03] | AT | 20.02.2019 | |
CZ | 20.02.2019 | ||
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
LU | 17.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2020/01] | CZ | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
MC | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
LU | 17.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/52] | CZ | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
PL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
SM | 20.02.2019 | ||
LU | 17.03.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/49] | CZ | 20.02.2019 | |
DK | 20.02.2019 | ||
EE | 20.02.2019 | ||
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
RO | 20.02.2019 | ||
SE | 20.02.2019 | ||
SK | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/48] | DK | 20.02.2019 | |
ES | 20.02.2019 | ||
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/47] | ES | 20.02.2019 | |
FI | 20.02.2019 | ||
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/46] | FI | 20.02.2019 | |
HR | 20.02.2019 | ||
IT | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/39] | FI | 20.02.2019 | |
HR | 20.02.2019 | ||
LT | 20.02.2019 | ||
LV | 20.02.2019 | ||
NL | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
IS | 20.06.2019 | ||
PT | 20.06.2019 | ||
Former [2019/38] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
SE | 20.02.2019 | ||
BG | 20.05.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/37] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
SE | 20.02.2019 | ||
NO | 20.05.2019 | ||
GR | 21.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/34] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
SE | 20.02.2019 | ||
NO | 20.05.2019 | ||
PT | 20.06.2019 | ||
Former [2019/33] | FI | 20.02.2019 | |
LT | 20.02.2019 | ||
NO | 20.05.2019 | ||
PT | 20.06.2019 | Documents cited: | Search | [I]JP3018693B (NISSIN ELECTRIC CO LTD) [I] 1-15 * paragraphs [0009] , [0010] , [0017] , [0018]; claim 1 * * the whole document *; | [Y]JP2006143975 (PRIME POLYMER KK) [Y] 1-15 * paragraphs [0011] , [0013] , [0037] , [0046] , [0047] , [0094]; claims 1,6 * * the whole document *; | [Y]JP2003025425 (TORAY INDUSTRIES) [Y] 1-15 * paragraphs [0011] , [0012] , [0031] , [0102] , [0115]; example 1 * * the whole document *; | [Y]JPH10112419 (TORAY INDUSTRIES [JP]) [Y] 1-15 * abstract * | International search | [Y]JP2006143975 (PRIME POLYMER KK); | [Y]JPS52153150 (NISSIN ELECTRIC CO LTD) | Examination | JP2007084813 | JP3752747B | WO2008140835 | - A. Zambelli ET AL, "Carbon-13 Nuclear Magnetic Resonance Analysis of Tail-to-Tail Monomeric Units and of Saturated End Groups in Polypropylene", Macromolecules, US, (19790101), vol. 12, no. 1, doi:10.1021/ma60067a034, ISSN 0024-9297, pages 156 - 159, XP055477509 DOI: http://dx.doi.org/10.1021/ma60067a034 | by applicant | JPS61110906 | JPH06236709 | JP2009500479 | JP2006093688 | JPS54109160 |