EP2622902 - METHOD, APPARATUS, COMPUTER PROGRAM AND COMPUTER PROGRAM PRODUCT FOR TRANSFERRING A SESSION FROM A PACKET SWITCHED ACCESS NETWORK TO A CIRCUIT SWITCHED ACCESS NETWORK [Right-click to bookmark this link] | |||
Former [2013/32] | METHOD, APPARATUSES AND COMPUTER PROGRAM FOR TRANSFERRING A SESSION FROM A PACKET SWITCHED ACCESS NETWORK TO A CIRCUIT SWITCHED ACCESS NETWORK | ||
[2020/44] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 05.10.2020 | ||
Former | Examination is in progress Status updated on 16.12.2016 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2021/07] |
Former [2015/29] | For all designated states Telefonaktiebolaget L M Ericsson (publ) 164 83 Stockholm / SE | ||
Former [2013/32] | For all designated states Telefonaktiebolaget L M Ericsson (PUBL) 164 83 Stockholm / SE | Inventor(s) | 01 /
LINDHOLM, Fredrik Hornsbergsvägen 18 S-112 15 Stockholm / SE | 02 /
KELLER, Ralf Talblick 22 52146 Würselen / DE | [2013/32] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2021/07] |
Former [2013/32] | Mitchell, Matthew Benedict David Marks & Clerk LLP Fletcher House Heatley Road The Oxford Science Park Oxford OX4 4GE / GB | Application number, filing date | 10759632.2 | 28.09.2010 | [2021/07] | WO2010EP64310 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012041365 | Date: | 05.04.2012 | Language: | EN | [2012/14] | Type: | A1 Application with search report | No.: | EP2622902 | Date: | 07.08.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.04.2012 takes the place of the publication of the European patent application. | [2013/32] | Type: | B1 Patent specification | No.: | EP2622902 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Search report(s) | International search report - published on: | EP | 05.04.2012 | Classification | IPC: | H04W36/00, H04L29/06 | [2020/44] | CPC: |
H04L65/1069 (EP);
H04W8/02 (KR);
H04W36/00226 (EP,CN,KR);
H04W36/0022 (US);
H04L65/1033 (EP);
H04M15/66 (KR,US);
|
Former IPC [2013/32] | H04W36/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2013/32] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN, VORRICHTUNG, COMPUTERPROGRAMM AND COMPUTERPROGRAMMPRODUKT ZUR ÜBERTRAGUNG EINER SITZUNG AUS EINEM PAKETVERMITTELTEN ZUGANGSNETZ ZU EINEM LEITUNGSVERMITTELTEN ZUGANGSNETZ | [2020/44] | English: | METHOD, APPARATUS, COMPUTER PROGRAM AND COMPUTER PROGRAM PRODUCT FOR TRANSFERRING A SESSION FROM A PACKET SWITCHED ACCESS NETWORK TO A CIRCUIT SWITCHED ACCESS NETWORK | [2020/44] | French: | PROCÉDÉ, APPAREILS, PROGRAMME INFORMATIQUE ET PRODUIT-PROGRAMME D'ORDINATEUR POUR TRANSFÉRER UNE SESSION D'UN RÉSEAU D'ACCÈS À COMMUTATION DE PAQUETS À UN RÉSEAU D'ACCÈS À COMMUTATION DE CIRCUITS | [2020/44] |
Former [2013/32] | VERFAHREN, VORRICHTUNGEN UND COMPUTERPROGRAMM ZUR ÜBERTRAGUNG EINER SITZUNG AUS EINEM PAKETVERMITTELTEN ZUGANGSNETZ ZU EINEM LEITUNGSVERMITTELTEN ZUGANGSNETZ | ||
Former [2013/32] | METHOD, APPARATUSES AND COMPUTER PROGRAM FOR TRANSFERRING A SESSION FROM A PACKET SWITCHED ACCESS NETWORK TO A CIRCUIT SWITCHED ACCESS NETWORK | ||
Former [2013/32] | PROCÉDÉ, APPAREILS ET PROGRAMME INFORMATIQUE POUR TRANSFÉRER UNE SESSION D'UN RÉSEAU D'ACCÈS À COMMUTATION DE PAQUETS À UN RÉSEAU D'ACCÈS À COMMUTATION DE CIRCUITS | Entry into regional phase | 26.04.2013 | National basic fee paid | 26.04.2013 | Designation fee(s) paid | 26.04.2013 | Examination fee paid | Examination procedure | 10.07.2012 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 26.04.2013 | Examination requested [2013/32] | 25.11.2013 | Amendment by applicant (claims and/or description) | 15.04.2014 | Despatch of a communication from the examining division (Time limit: M04) | 18.07.2014 | Reply to a communication from the examining division | 18.11.2015 | Despatch of a communication from the examining division (Time limit: M04) | 29.03.2016 | Reply to a communication from the examining division | 06.06.2016 | Despatch of a communication from the examining division (Time limit: M06) | 15.12.2016 | Reply to a communication from the examining division | 02.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.06.2018 | Reply to a communication from the examining division | 20.03.2019 | Despatch of a communication from the examining division (Time limit: M06) | 05.09.2019 | Reply to a communication from the examining division | 16.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 20.07.2020 | Reply to a communication from the examining division | 06.10.2020 | Communication of intention to grant the patent | 30.12.2020 | Fee for grant paid | 30.12.2020 | Fee for publishing/printing paid | 30.12.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21157120.3 / EP3840332 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.04.2014 | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 02.04.2013 | Renewal fee patent year 03 | 27.09.2013 | Renewal fee patent year 04 | 29.09.2014 | Renewal fee patent year 05 | 28.09.2015 | Renewal fee patent year 06 | 27.09.2016 | Renewal fee patent year 07 | 27.09.2017 | Renewal fee patent year 08 | 27.09.2018 | Renewal fee patent year 09 | 27.09.2019 | Renewal fee patent year 10 | 28.09.2020 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.09.2010 | AL | 17.02.2021 | AT | 17.02.2021 | CY | 17.02.2021 | EE | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | BG | 17.05.2021 | NO | 17.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | LU | 28.09.2021 | BE | 30.09.2021 | [2024/22] |
Former [2023/29] | HU | 28.09.2010 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
LU | 28.09.2021 | ||
BE | 30.09.2021 | ||
Former [2023/24] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
LU | 28.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
LU | 28.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/25] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/23] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/13] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | AT | 17.02.2021 | |
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | AT | 17.02.2021 | |
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/46] | AT | 17.02.2021 | |
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/39] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
PL | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | FI | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | Cited in | International search | [I]US2010040020 (CHEN BONNIE [US]) [I] 11,15,16 * paragraphs [0004] - [0042]; figures 4A,4B *; | [X] - SAMSUNG, "Bearer identification for vSRVCC handover key issue", 3GPP DRAFT; S2-102719_WASS2-102415 BEARER IDENTIFICATION KEY ISSUE_V5, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100514), vol. SA WG2, no. Kyoto; 20100510, XP050434905 [X] 1-10,15,16 * paragraph [Discussuion] * * paragraphs [06.X] - [6.X.2.2]; figures 6.X.1.2-1, 6.X.1.2-2 * | [A] - SAMSUNG, "Assessment of the solutions in the bearer identification key issue", 3GPP DRAFT; S2-103604_VSRVCC_ASSESMENT_BEARER IDENTIFICATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100824), vol. SA WG2, no. Brunstad; 20100903, XP050458625 [A] 1-10,15,16 * paragraphs [6.2.1.X] - [6.2.2.2]; figures 6.2.2.2-2 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Feasibility Study of Single Radio Video Call Continuity (vSRVCC); Stage 2 (Release 10)", 3GPP STANDARD; 3GPP TR 23.886, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100909), no. V0.3.1, pages 1 - 30, XP050442046 [A] 1-10,15,16 * paragraphs [06.2] - [6.2.2.2]; figures 6.2.2.2-2 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Single Radio Voice Call Continuity (SRVCC); Stage 2 (Release 9)", 3GPP STANDARD; 3GPP TS 23.216, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100610), no. V9.4.0, pages 1 - 41, XP050441555 [A] 11,15,16 * paragraphs [5.3.4] - [5.3.6.1] - [0006] - [6.2.2.2]; figures 6.1.3-1 * | Examination | - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 10)", 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100610), no. V10.0.0, pages 1 - 261, XP050441572 |