blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2480369

EP2480369 - METHOD FOR MANUFACTURING A MODULE HAVING A HOLLOW SPACE BY HOT ISOSTATIC PRESSURE BONDING [Right-click to bookmark this link]
Former [2012/31]METHOD FOR MANUFACTURING A MODULE HAVING A HOLLOW AREA BY MEANS OF HOT ISOSTATIC PRESSING
[2014/52]
StatusNo opposition filed within time limit
Status updated on  15.04.2016
Database last updated on 07.10.2024
Most recent event   Tooltip19.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 21.11.2018  [2018/47]
Applicant(s)For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
25, Rue Leblanc
Bâtiment "Le Ponant D"
75015 Paris / FR
[N/P]
Former [2015/24]For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
25, rue Leblanc
Bâtiment "Le Ponant D"
75015 Paris / FR
Former [2012/31]For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
25, rue Leblanc
Bâtiment "Le Ponant D"
75015 Paris / FR
Inventor(s)01 / COUTURIER, Raphaël
12 rue Jean Moulin
F-38360 Sassenage / FR
02 / BERNARD, Charlotte
635 route de Bonneville
F-74130 Contamine Sur Arve / FR
03 / REYTIER, Magali
15 allée des Peupliers
F-38250 VILLARD DE LANS / FR
04 / RIGAL, Emmanuel
228 rue de la Balme
F-38950 St Martin Le Vinoux / FR
 [2012/42]
Former [2012/31]01 / COUTURIER, Raphaël
12 rue Jean Moulin
F-38360 Sassenage / FR
02 / BERNARD, Charlotte
635 route de Bonneville
F-74130 Contamine Sur Arve / FR
03 / REYTIER, Magali
8 rue Etienne Marcel
F-38000 Grenoble / FR
04 / RIGAL, Emmanuel
228 rue de la Balme
F-38950 St Martin Le Vinoux / FR
Representative(s)Ilgart, Jean-Christophe, et al
BREVALEX
95, Rue d'Amsterdam
75378 Paris Cedex 8 / FR
[N/P]
Former [2015/24]Ilgart, Jean-Christophe, et al
BREVALEX
95, rue d'Amsterdam
75378 Paris Cedex 8 / FR
Former [2012/31]Ilgart, Jean-Christophe, et al
BREVALEX 95 rue d'Amsterdam
75378 Paris Cedex 8 / FR
Application number, filing date10760985.123.09.2010
WO2010EP64050
Priority number, dateFR2009005665525.09.2009         Original published format: FR 0956655
[2012/31]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2011036207
Date:31.03.2011
Language:FR
[2011/13]
Type: A1 Application with search report 
No.:EP2480369
Date:01.08.2012
Language:FR
The application published by WIPO in one of the EPO official languages on 31.03.2011 takes the place of the publication of the European patent application.
[2012/31]
Type: B1 Patent specification 
No.:EP2480369
Date:10.06.2015
Language:FR
[2015/24]
Search report(s)International search report - published on:EP31.03.2011
ClassificationIPC:B23K20/02, F28F3/12
[2012/31]
CPC:
B23K20/021 (EP,US); B23K20/02 (KR); F28F3/12 (EP,KR,US);
B23K2101/14 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/31]
Extension statesBANot yet paid
MENot yet paid
RSNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES MODULS MIT EINEM HOHLRAUM DURCH HEISSISOSTATISCHES PRESSEN[2015/07]
English:METHOD FOR MANUFACTURING A MODULE HAVING A HOLLOW SPACE BY HOT ISOSTATIC PRESSURE BONDING[2015/07]
French:PROCEDE DE FABRICATION D'UN MODULE A ZONE CREUSE PAR COMPRESSION ISOSTATIQUE A CHAUD[2012/31]
Former [2012/31]VERFAHREN ZUR HERSTELLUNG EINES MODULS MIT EINEM HOHLEN BEREICH MIT ISOSTATISCHER HEISSPRESSUNG
Former [2012/31]METHOD FOR MANUFACTURING A MODULE HAVING A HOLLOW AREA BY MEANS OF HOT ISOSTATIC PRESSING
Entry into regional phase27.03.2012National basic fee paid 
27.03.2012Designation fee(s) paid 
27.03.2012Examination fee paid 
Examination procedure27.03.2012Examination requested  [2012/31]
15.01.2015Communication of intention to grant the patent
30.04.2015Fee for grant paid
30.04.2015Fee for publishing/printing paid
30.04.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.01.2015
Opposition(s)11.03.2016No opposition filed within time limit [2016/20]
Fees paidRenewal fee
27.08.2012Renewal fee patent year 03
26.08.2013Renewal fee patent year 04
29.08.2014Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.09.2010
AL10.06.2015
AT10.06.2015
CY10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
HR10.06.2015
LT10.06.2015
LV10.06.2015
MC10.06.2015
MK10.06.2015
MT10.06.2015
NL10.06.2015
PL10.06.2015
RO10.06.2015
SE10.06.2015
SI10.06.2015
SK10.06.2015
SM10.06.2015
TR10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IE23.09.2015
LU23.09.2015
BE30.09.2015
CH30.09.2015
LI30.09.2015
IS10.10.2015
PT12.10.2015
[2018/47]
Former [2018/30]HU23.09.2010
AT10.06.2015
CY10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
HR10.06.2015
LT10.06.2015
LV10.06.2015
MC10.06.2015
MK10.06.2015
MT10.06.2015
NL10.06.2015
PL10.06.2015
RO10.06.2015
SE10.06.2015
SI10.06.2015
SK10.06.2015
SM10.06.2015
TR10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IE23.09.2015
LU23.09.2015
BE30.09.2015
CH30.09.2015
LI30.09.2015
IS10.10.2015
PT12.10.2015
Former [2017/38]HU23.09.2010
AT10.06.2015
CY10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
HR10.06.2015
LT10.06.2015
LV10.06.2015
MC10.06.2015
MT10.06.2015
NL10.06.2015
PL10.06.2015
RO10.06.2015
SE10.06.2015
SI10.06.2015
SK10.06.2015
SM10.06.2015
TR10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IE23.09.2015
LU23.09.2015
BE30.09.2015
CH30.09.2015
LI30.09.2015
IS10.10.2015
PT12.10.2015
Former [2017/22]AT10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
MC10.06.2015
MT10.06.2015
PL10.06.2015
RO10.06.2015
SI10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IE23.09.2015
LU23.09.2015
CH30.09.2015
LI30.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/33]AT10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
MC10.06.2015
PL10.06.2015
RO10.06.2015
SI10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IE23.09.2015
LU23.09.2015
CH30.09.2015
LI30.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/24]AT10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
MC10.06.2015
PL10.06.2015
RO10.06.2015
SI10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
LU23.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/23]AT10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
MC10.06.2015
PL10.06.2015
RO10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
LU23.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/21]AT10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
PL10.06.2015
RO10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
LU23.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/20]AT10.06.2015
CZ10.06.2015
DK10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
PL10.06.2015
RO10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/11]AT10.06.2015
CZ10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
PL10.06.2015
RO10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/10]CZ10.06.2015
EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
PL10.06.2015
RO10.06.2015
SK10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
IS10.10.2015
PT12.10.2015
Former [2016/09]EE10.06.2015
FI10.06.2015
LT10.06.2015
LV10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
Former [2015/50]FI10.06.2015
LT10.06.2015
LV10.06.2015
BG10.09.2015
NO10.09.2015
GR11.09.2015
Former [2015/49]FI10.06.2015
LT10.06.2015
LV10.06.2015
NO10.09.2015
GR11.09.2015
Cited inInternational search[A]GB2269556  (ROLLS ROYCE PLC [GB]) [A] 1-9 * figure - *;
 [AD]FR2879489  (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [AD] 1-9* the whole document *;
 [AD]  - NORAJITRA P ET AL, "HIP experiments on the first wall and cooling plate specimens for the EU HCPB blanket", JOURNAL OF NUCLEAR MATERIALS, ELSEVIER BV, NL LNKD- DOI:10.1016/S0022-3115(02)01130-3, (20021201), vol. 307-311, ISSN 0022-3115, pages 1558 - 1562, XP004400621 [AD] 1-9 * the whole document *

DOI:   http://dx.doi.org/10.1016/S0022-3115(02)01130-3
by applicantFR2879489
 JP2006263746
    - P. NORAJITRA ET AL., "HIP experiments on the first wall and cooling plate specimens for the EU HCPB blanket", JOURNAL OF NUCLEAR MATERIALS, (2002), pages 307 - 311
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.