EP2486351 - METHOD AND PLANT FOR MANUFACTURING CEMENT [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 14.03.2014 Database last updated on 26.07.2024 | Most recent event Tooltip | 14.03.2014 | Application deemed to be withdrawn | published on 16.04.2014 [2014/16] | Applicant(s) | For all designated states FLSmidth A/S Vigerslev Allé 77 2500 Valby / DK | [N/P] |
Former [2012/33] | For all designated states FLSmidth A/S Vigerslev Alle 77 2500 Valby / DK | Inventor(s) | 01 /
CHRISTIANSEN, Thoger Kobke Calle Mar Rojo 42 E-28200 Majadajonda / ES | [2012/33] | Representative(s) | (deleted) | [2012/33] | Application number, filing date | 10768074.6 | 06.10.2010 | WO2010IB54523 | Priority number, date | DK20090001099 | 07.10.2009 Original published format: DK 200901099 | [2012/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011042873 | Date: | 14.04.2011 | Language: | EN | [2011/15] | Type: | A1 Application with search report | No.: | EP2486351 | Date: | 15.08.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.04.2011 takes the place of the publication of the European patent application. | [2012/33] | Search report(s) | International search report - published on: | EP | 14.04.2011 | Classification | IPC: | F27B7/20, C04B7/52 | [2013/22] | CPC: |
C04B7/52 (EP,US);
F27B7/20 (EP,US);
Y02P40/10 (EP,US)
|
Former IPC [2012/33] | F27B7/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/33] | Title | German: | VERFAHREN UND ANLAGE ZUR HERSTELLUNG VON ZEMENT | [2012/33] | English: | METHOD AND PLANT FOR MANUFACTURING CEMENT | [2012/33] | French: | PROCÉDÉ ET ÉQUIPEMENT POUR LA FABRICATION DE CIMENT | [2012/33] | Entry into regional phase | 19.04.2012 | National basic fee paid | 19.04.2012 | Designation fee(s) paid | 19.04.2012 | Examination fee paid | Examination procedure | 19.04.2012 | Examination requested [2012/33] | 12.06.2013 | Communication of intention to grant the patent | 23.10.2013 | Application deemed to be withdrawn, date of legal effect [2014/16] | 28.11.2013 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time [2014/16] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.06.2013 | Fees paid | Renewal fee | 11.10.2012 | Renewal fee patent year 03 | 14.10.2013 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [A]JP2003002705 (MITSUBISHI MATERIALS CORP) [A] 1-8* abstract * |