blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2512783

EP2512783 - DOUBLE VACUUM CURE PROCESSING OF COMPOSITE PARTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.11.2017
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  02.12.2016
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-1596 / US
[2017/01]
Former [2012/43]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
Inventor(s)01 / ANDERSON, Michael R.
11102 Southeast 183rd Place
Renton, Washington 98055 / US
02 / DEPASE, Edoardo P.
1321 Queen Anne Avenue North 402
Seattle, Washington 98109 / US
 [2012/43]
Representative(s)Howson, Richard Giles Bentham, et al
Kilburn & Strode LLP
Lacon London
84 Theobalds Road
London WC1X 8NL / GB
[N/P]
Former [2017/01]Howson, Richard G.B., et al
Kilburn & Strode LLP
20 Red Lion Street
London WC1R 4PJ / GB
Former [2012/43]Howson, Richard G.B., et al
Kilburn & Strode LLP
20 Red Lion Street
London WC1R 4PJ / GB
Application number, filing date10779651.812.11.2010
[2017/01]
WO2010US56605
Priority number, dateUS2009064189718.12.2009         Original published format: US 641897
[2012/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2011075252
Date:23.06.2011
Language:EN
[2011/25]
Type: A1 Application with search report 
No.:EP2512783
Date:24.10.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 23.06.2011 takes the place of the publication of the European patent application.
[2012/43]
Type: B1 Patent specification 
No.:EP2512783
Date:04.01.2017
Language:EN
[2017/01]
Search report(s)International search report - published on:EP23.06.2011
ClassificationIPC:B29C70/44, B29C73/00, B29C35/02
[2012/43]
CPC:
B29C70/44 (EP,US); B29C37/006 (EP,US); B29C73/10 (EP,US);
B29C73/30 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/43]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:DOPPELVAKUUM-AUSHÄRTUNGSVERARBEITUNG VON VERBUNDSTOFFTEILEN[2012/43]
English:DOUBLE VACUUM CURE PROCESSING OF COMPOSITE PARTS[2012/43]
French:PROCÉDÉ DE TRAITEMENT SOUS VIDE DOUBLE DE PIÈCES COMPOSITES[2012/43]
Entry into regional phase18.07.2012National basic fee paid 
18.07.2012Designation fee(s) paid 
18.07.2012Examination fee paid 
Examination procedure18.07.2012Examination requested  [2012/43]
07.02.2013Amendment by applicant (claims and/or description)
29.04.2013Despatch of a communication from the examining division (Time limit: M04)
21.08.2013Reply to a communication from the examining division
06.10.2014Despatch of a communication from the examining division (Time limit: M04)
05.02.2015Reply to a communication from the examining division
28.07.2015Despatch of a communication from the examining division (Time limit: M04)
15.10.2015Reply to a communication from the examining division
09.06.2016Communication of intention to grant the patent
06.10.2016Fee for grant paid
06.10.2016Fee for publishing/printing paid
06.10.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  29.04.2013
Opposition(s)05.10.2017No opposition filed within time limit [2017/50]
Fees paidRenewal fee
26.11.2012Renewal fee patent year 03
27.11.2013Renewal fee patent year 04
26.11.2014Renewal fee patent year 05
30.11.2015Renewal fee patent year 06
28.11.2016Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.11.2010
AL04.01.2017
AT04.01.2017
CY04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
MC04.01.2017
MK04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SI04.01.2017
SK04.01.2017
SM04.01.2017
TR04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
[2020/33]
Former [2020/15]HU12.11.2010
AT04.01.2017
CY04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
MC04.01.2017
MK04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SI04.01.2017
SK04.01.2017
SM04.01.2017
TR04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2019/51]HU12.11.2010
AT04.01.2017
CY04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
MC04.01.2017
MK04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SI04.01.2017
SK04.01.2017
SM04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2019/46]HU12.11.2010
AT04.01.2017
CY04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
MC04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SI04.01.2017
SK04.01.2017
SM04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2019/31]HU12.11.2010
AT04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
MC04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SI04.01.2017
SK04.01.2017
SM04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2018/33]AT04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
MC04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SI04.01.2017
SK04.01.2017
SM04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2018/14]AT04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SI04.01.2017
SK04.01.2017
SM04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2017/51]AT04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SK04.01.2017
SM04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2017/50]AT04.01.2017
CZ04.01.2017
DK04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SK04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2017/49]AT04.01.2017
CZ04.01.2017
EE04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
NL04.01.2017
PL04.01.2017
RO04.01.2017
RS04.01.2017
SK04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2017/48]AT04.01.2017
CZ04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
NL04.01.2017
PL04.01.2017
RS04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Former [2017/40]AT04.01.2017
FI04.01.2017
HR04.01.2017
LT04.01.2017
LV04.01.2017
NL04.01.2017
PL04.01.2017
RS04.01.2017
BG04.04.2017
NO04.04.2017
GR05.04.2017
IS04.05.2017
Cited inInternational search[XYI]US2005253309  (HOU TAN-HUNG [US], et al) [X] 1,2,4,5,8,12-14,16,17,25 * abstract * * figures 1, 3, 4 * * page 3, paragraphs [0028], [0032], [0035] * [Y] 3,7,9,15 [I] 18;
 [Y]WO2008045485  (AMERICAN CONSULTING TECHNOLOGY [US], et al) [Y] 3,7,9,15 * page 2, lines 27-28 ** page 8, lines 24-31 *
ExaminationUS6482497
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.