| EP2436085 - LOW LOSS VARIABLE PHASE REFLECT ARRAY USING DUAL RESONANCE PHASE-SHIFTING ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 21.05.2021 | ||
| Former | Grant of patent is intended Status updated on 17.12.2020 | ||
| Former | Examination is in progress Status updated on 20.10.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Raytheon Company 870 Winter Street Waltham, MA 02451 / US | [2021/25] |
| Former [2012/14] | For all designated states Raytheon Company 870 Winter Street Waltham, MA 02451 / US | Inventor(s) | 01 /
CROUCH, David D. Raytheon Missile Systems Building 807 MS F8 1151 E. Hermans Road Tucson, Arizona 85756 / US | [2012/14] | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2021/25] |
| Former [2012/14] | Jackson, Richard Eric Carpmaels & Ransford One Southampton Row London WC1B 5HA / GB | Application number, filing date | 10781222.4 | 27.05.2010 | [2021/25] | WO2010US36425 | Priority number, date | US200947538309 | 29.05.2009 Original published format: US 47538309 | [2021/02] |
| Former [2012/14] | US20090475383 | 29.05.2009 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010138731 | Date: | 02.12.2010 | Language: | EN | [2010/48] | Type: | A1 Application with search report | No.: | EP2436085 | Date: | 04.04.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.12.2010 takes the place of the publication of the European patent application. | [2012/14] | Type: | B1 Patent specification | No.: | EP2436085 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | International search report - published on: | US | 02.12.2010 | (Supplementary) European search report - dispatched on: | EP | 14.04.2014 | Classification | IPC: | H01Q15/00, H01Q3/46, H01Q9/14, H01Q19/10 | [2014/20] | CPC: |
H01Q9/14 (EP,US);
H01Q19/104 (EP,US);
H01Q3/46 (EP,US)
|
| Former IPC [2012/14] | H01Q15/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/14] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | PHASENVARIABLE REFLEXIONSANORDNUNG MIT GERINGEM VERLUST SOWIE MIT EINEM DOPPELTEN RESONANZPHASENVERSCHIEBUNGSELEMENT | [2012/14] | English: | LOW LOSS VARIABLE PHASE REFLECT ARRAY USING DUAL RESONANCE PHASE-SHIFTING ELEMENT | [2012/14] | French: | RÉSEAU RÉFLECTEUR À PHASE VARIABLE À FAIBLES PERTES UTILISANT UN ÉLÉMENT DÉPHASEUR À RÉSONANCE DOUBLE | [2012/14] | Entry into regional phase | 13.12.2011 | National basic fee paid | 13.12.2011 | Search fee paid | 13.12.2011 | Designation fee(s) paid | 13.12.2011 | Examination fee paid | Examination procedure | 13.12.2011 | Examination requested [2012/14] | 12.11.2014 | Amendment by applicant (claims and/or description) | 18.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 28.02.2018 | Reply to a communication from the examining division | 26.11.2020 | Cancellation of oral proceeding that was planned for 27.11.2020 | 27.11.2020 | Date of oral proceedings (cancelled) | 18.12.2020 | Communication of intention to grant the patent | 22.04.2021 | Fee for grant paid | 22.04.2021 | Fee for publishing/printing paid | 22.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.10.2017 | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Fees paid | Renewal fee | 29.03.2012 | Renewal fee patent year 03 | 10.05.2013 | Renewal fee patent year 04 | 27.03.2014 | Renewal fee patent year 05 | 12.05.2015 | Renewal fee patent year 06 | 10.05.2016 | Renewal fee patent year 07 | 10.05.2017 | Renewal fee patent year 08 | 11.05.2018 | Renewal fee patent year 09 | 15.05.2019 | Renewal fee patent year 10 | 31.03.2020 | Renewal fee patent year 11 | 12.05.2021 | Renewal fee patent year 12 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.05.2010 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | DK | 23.06.2021 | EE | 23.06.2021 | ES | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | IT | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | MT | 23.06.2021 | NL | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | SE | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | TR | 23.06.2021 | BG | 23.09.2021 | NO | 23.09.2021 | GR | 24.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | [2024/41] |
| Former [2024/29] | HU | 27.05.2010 | |
| AL | 23.06.2021 | ||
| AT | 23.06.2021 | ||
| CY | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| MK | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| TR | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2024/22] | HU | 27.05.2010 | |
| AL | 23.06.2021 | ||
| AT | 23.06.2021 | ||
| CY | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| MK | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2024/20] | HU | 27.05.2010 | |
| AL | 23.06.2021 | ||
| AT | 23.06.2021 | ||
| CY | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2024/18] | HU | 27.05.2010 | |
| AL | 23.06.2021 | ||
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2023/06] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| MC | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/36] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| IT | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/29] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SI | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/26] | AL | 23.06.2021 | |
| AT | 23.06.2021 | ||
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/21] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| DK | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/10] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| EE | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| PL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| IS | 23.10.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/09] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| RO | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SK | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| PT | 25.10.2021 | ||
| Former [2022/08] | AT | 23.06.2021 | |
| CZ | 23.06.2021 | ||
| ES | 23.06.2021 | ||
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| Former [2022/07] | AT | 23.06.2021 | |
| FI | 23.06.2021 | ||
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| NL | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| SM | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| Former [2021/49] | FI | 23.06.2021 | |
| HR | 23.06.2021 | ||
| LT | 23.06.2021 | ||
| LV | 23.06.2021 | ||
| SE | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| NO | 23.09.2021 | ||
| GR | 24.09.2021 | ||
| Former [2021/47] | FI | 23.06.2021 | |
| LT | 23.06.2021 | ||
| BG | 23.09.2021 | ||
| Former [2021/46] | FI | 23.06.2021 | |
| LT | 23.06.2021 | Documents cited: | Search | [X] US2008024368 (CHANG THE-NAN et al.) [X] 1-6,14,15 * page 1; figure 1a * | [XP] EP2175523 (THALES SA et al.) [XP] 1-3,8-11,13-15 * columns 5-8; figures 1,2,3a,5,6 * | [X] WO2007051487 (CENTRE NAT RECH SCIENT et al.) [X] 1-6,8,14,15 * columns 5-11; figures 1-6 * | [AD] US4905014 (GONZALEZ DANIEL G et al.) [AD] 1-15 * the whole document * | International search | [Y] US2009079645 (SOTELO MICHAEL JOHN et al.) [Y] | [Y] US2003122729 (DIAZ RODOLFO E et al.) [Y] | [A] US7142164 (LEGAY HERVE et al.) [A] | [A] US5153061 (CAVAGNA GIANCARLO A et al.) [A] | Examination | OREFICE M ET AL: "Analysis of complex circular/square ring reflectarray elements", 3RD EUROPEAN CONFERENCE ON ANTENNAS AND PROPAGATION. EUCAP 2009 , 23-27 MARCH 2009 - BERLIN, GERMANY, IEEE, PISCATAWAY, NJ, USA, 23 March 2009 (2009-03-23), pages 1357 - 1359, XP031470040, ISBN: 978-1-4244-4753-4 | by applicant | US2008024368 | EP2175523 | WO2007051487 | US4905014 |