EP2516345 - COMPOSITE PAVEMENT STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.06.2021 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 10.07.2020 | ||
Former | Grant of patent is intended Status updated on 27.02.2020 | ||
Former | Examination is in progress Status updated on 05.01.2018 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Soiltec GmbH Neue Finien 7a 28832 Achim / DE | For all designated states BASF SE Carl-Bosch-Strasse 38 67056 Ludwigshafen am Rhein / DE | [2020/33] |
Former [2014/27] | For all designated states Soiltec GmbH Neue Finien 7a 28832 Achim / DE | ||
For all designated states BASF SE 67056 Ludwigshafen / DE | |||
Former [2012/44] | For all designated states Reynolds Presto Products, Inc. 6641 West Broad Street Richmond, VA 23230-1723 / US | ||
For all designated states BASF SE 67056 Ludwigshafen / DE | Inventor(s) | 01 /
HICKS, Steven 27412 Wyatt Avenue Brownstown, MI 48183 / US | 02 /
BOWER, David, K. 7507 Kingsbridge Road Canton, MI 48187 / US | 03 /
HANDLOS, William 801 Sequoia Court Manitowoc, WI 54220 / US | [2012/44] | Representative(s) | Heiland, Karsten Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Hollerallee 73 28209 Bremen / DE | [2020/33] |
Former [2014/27] | Heiland, Karsten Meissner, Bolte & Partner GbR Hollerallee 73 28209 Bremen / DE | ||
Former [2012/44] | Ström & Gulliksson AB Studentgatan 1 P.O. Box 4188 SE-203 13 Malmö / SE | Application number, filing date | 10788460.3 | 01.12.2010 | [2020/33] | WO2010US58582 | Priority number, date | US20090288637P | 21.12.2009 Original published format: US 288637 P | [2012/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011084274 | Date: | 14.07.2011 | Language: | EN | [2011/28] | Type: | A1 Application with search report | No.: | EP2516345 | Date: | 31.10.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.07.2011 takes the place of the publication of the European patent application. | [2012/44] | Type: | B1 Patent specification | No.: | EP2516345 | Date: | 12.08.2020 | Language: | EN | [2020/33] | Search report(s) | International search report - published on: | EP | 14.07.2011 | Classification | IPC: | C04B26/16, C04B20/10, C03C12/00, C03C17/30, C03C17/34, // C04B111/60 | [2020/10] | CPC: |
C03C12/00 (EP,US);
C04B18/16 (KR);
E01C7/182 (US);
C03C17/00 (KR);
C03C17/30 (EP,KR,US);
C03C17/3405 (EP,US);
C04B20/1051 (EP,US);
C04B26/16 (EP,US);
C08G18/10 (US);
C08G18/3206 (US);
C08G18/4244 (US);
C08G18/7664 (US);
C08K3/34 (US);
C08K3/40 (US);
C08L21/00 (US);
C08L75/04 (US);
E01C11/005 (US);
E01C7/30 (US);
C04B2111/00284 (EP,US);
C04B2111/00293 (EP,US);
C04B2111/00612 (EP,US);
C04B2111/0075 (EP,US);
C04B2111/60 (EP,US);
C04B2201/50 (US);
Y02W30/91 (EP);
Y10T428/249984 (EP,US);
Y10T428/25 (EP,US);
Y10T428/31551 (EP,US)
(-)
| C-Set: |
C04B20/1051, C04B14/22 (EP,US);
C04B26/16, C04B14/06, C04B14/22, C04B24/02, C04B40/065 (US,EP);
C04B26/16, C04B14/22, C04B40/065 (US)
|
Former IPC [2012/44] | C04B26/16, C04B20/10, C03C17/00, C03C17/30 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ZUSAMMENGESETZTE PFLASTERUNGSSTRUKTUR | [2012/44] | English: | COMPOSITE PAVEMENT STRUCTURE | [2012/44] | French: | STRUCTURE DE PAVEMENT COMPOSITE | [2012/44] | Entry into regional phase | 04.07.2012 | National basic fee paid | 04.07.2012 | Designation fee(s) paid | 04.07.2012 | Examination fee paid | Examination procedure | 04.07.2012 | Amendment by applicant (claims and/or description) | 04.07.2012 | Examination requested [2012/44] | 02.09.2013 | Despatch of a communication from the examining division (Time limit: M06) | 21.02.2014 | Reply to a communication from the examining division | 03.01.2018 | Despatch of a communication from the examining division (Time limit: M06) | 13.07.2018 | Reply to a communication from the examining division | 07.03.2019 | Despatch of a communication from the examining division (Time limit: M06) | 25.07.2019 | Reply to a communication from the examining division | 02.09.2019 | Despatch of a communication from the examining division (Time limit: M02) | 14.10.2019 | Reply to a communication from the examining division | 28.02.2020 | Communication of intention to grant the patent | 20.05.2020 | Fee for grant paid | 20.05.2020 | Fee for publishing/printing paid | 30.06.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.09.2013 | Opposition(s) | 14.05.2021 | No opposition filed within time limit [2021/29] | Fees paid | Renewal fee | 02.01.2013 | Renewal fee patent year 03 | 02.01.2014 | Renewal fee patent year 04 | 05.01.2015 | Renewal fee patent year 05 | 04.01.2016 | Renewal fee patent year 06 | 02.01.2017 | Renewal fee patent year 07 | 02.01.2018 | Renewal fee patent year 08 | 02.01.2019 | Renewal fee patent year 09 | 02.01.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.12.2010 | AL | 12.08.2020 | AT | 12.08.2020 | CY | 12.08.2020 | CZ | 12.08.2020 | DK | 12.08.2020 | EE | 12.08.2020 | ES | 12.08.2020 | FI | 12.08.2020 | HR | 12.08.2020 | LT | 12.08.2020 | LV | 12.08.2020 | MC | 12.08.2020 | MK | 12.08.2020 | MT | 12.08.2020 | PT | 12.08.2020 | RO | 12.08.2020 | RS | 12.08.2020 | SE | 12.08.2020 | SI | 12.08.2020 | SK | 12.08.2020 | SM | 12.08.2020 | TR | 12.08.2020 | BG | 12.11.2020 | NO | 12.11.2020 | GR | 13.11.2020 | IE | 01.12.2020 | LU | 01.12.2020 | IS | 12.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/33] |
Former [2022/32] | HU | 01.12.2010 | |
AL | 12.08.2020 | ||
AT | 12.08.2020 | ||
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
MK | 12.08.2020 | ||
MT | 12.08.2020 | ||
PT | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
TR | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IE | 01.12.2020 | ||
LU | 01.12.2020 | ||
IS | 12.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/27] | HU | 01.12.2010 | |
AL | 12.08.2020 | ||
AT | 12.08.2020 | ||
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
MT | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
TR | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IE | 01.12.2020 | ||
LU | 01.12.2020 | ||
IS | 12.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/26] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
TR | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IE | 01.12.2020 | ||
LU | 01.12.2020 | ||
IS | 12.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IE | 01.12.2020 | ||
LU | 01.12.2020 | ||
IS | 12.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/47] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IE | 01.12.2020 | ||
LU | 01.12.2020 | ||
IS | 12.12.2020 | ||
Former [2021/46] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IE | 01.12.2020 | ||
IS | 12.12.2020 | ||
Former [2021/40] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/36] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/28] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/25] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/24] | AT | 12.08.2020 | |
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/23] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/22] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/20] | DK | 12.08.2020 | |
ES | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/10] | ES | 12.08.2020 | |
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/09] | ES | 12.08.2020 | |
FI | 12.08.2020 | ||
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
Former [2021/08] | ES | 12.08.2020 | |
FI | 12.08.2020 | ||
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
Former [2021/07] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
NO | 12.11.2020 | Cited in | International search | [A]FR2188596 (TECHNOSPORT [FR]) [A] 1-17 * the whole document *; | [XI]GB1604405 (UNIV CARDIFF, et al) [X] 1,2,5,8,9,15-17 * pages 1-5 * [I] 18-28; | [X]EP0911304 (SCREG [FR]) [X] 1,9 * paragraph [0049] * * example 2 *; | [XI]WO02076900 (PUR BAUCHEMIE GMBH [DE], et al) [X] 1-18,22 * pages 2-7 * * pages 10-12 * [I] 19-21,23-28; | [AD]US2009067925 (KAUL JOSEPH B [US]) [AD] 1-16* the whole document *; | [A] - YAMAGUCHI H. et al, "Manufacture of colored artificial stones with high strength", Chemical Abstracts, Chemi, (19911007), Database accession no. 141396p, URL: CHEMICAL, XP000318062 [A] 1-17 * abstract * | Examination | EP0083383 | by applicant | US7041221 | US2009067924 | US2009067925 | US2009067295 | WO2010EP58989 |