EP2448856 - METHOD AND ARRANGEMENT FOR OPENING AND CLOSING A SUSPENDED CEILING OR CORRESPONDING OF AN ELEVATOR CAR AND ALSO A LOCKING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.01.2020 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 25.01.2019 | ||
Former | Grant of patent is intended Status updated on 25.10.2018 | ||
Former | Examination is in progress Status updated on 24.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Kone Corporation Kartanontie 1 00330 Helsinki / FI | [2012/19] | Inventor(s) | 01 /
HEIKINTUPA, Rami Heikintie 20 FI-42800 Haapamäki / FI | 02 /
HALONEN, Pekka Teeritie 15 FI-12400 Tervakoski / FI | [2012/19] | Representative(s) | K & H Bonapat Patentanwälte Koch · von Behren & Partner mbB Donnersbergerstraße 22A 80634 München / DE | [2019/09] |
Former [2013/07] | K & H Bonapat Patentanwälte Wotanstraße 64 80639 München / DE | ||
Former [2012/19] | Graf Glück Habersack Kritzenberger Patentanwälte Wotanstraße 64 80639 München / DE | Application number, filing date | 10793673.4 | 30.06.2010 | [2019/09] | WO2010FI50565 | Priority number, date | FI20090000264 | 03.07.2009 Original published format: FI 20090264 | [2012/19] | Filing language | FI | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011001033 | Date: | 06.01.2011 | Language: | EN | [2011/01] | Type: | A1 Application with search report | No.: | EP2448856 | Date: | 09.05.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.01.2011 takes the place of the publication of the European patent application. | [2012/19] | Type: | B1 Patent specification | No.: | EP2448856 | Date: | 27.02.2019 | Language: | EN | [2019/09] | Search report(s) | International search report - published on: | FI | 06.01.2011 | (Supplementary) European search report - dispatched on: | EP | 13.10.2015 | Classification | IPC: | B66B11/02, F21V21/04, E04B9/00 | [2012/19] | CPC: |
B66B11/0226 (EP,US);
B66B11/0233 (FI);
E04B9/003 (EP,FI,US);
E05C19/02 (FI);
E05C19/06 (FI);
Y10S292/04 (EP,US);
Y10S292/36 (EP,US);
Y10T292/0948 (EP,US);
Y10T292/1043 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/19] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND ANORDNUNG ZUM ÖFFNEN UND SCHLIESSEN EINER HÄNGENDEN DECKE ODER EINER ÄHNLICHEN VORRICHTUNG IN EINER AUFZUGSKABINE SOWIE SPERRVORRICHTUNG | [2012/19] | English: | METHOD AND ARRANGEMENT FOR OPENING AND CLOSING A SUSPENDED CEILING OR CORRESPONDING OF AN ELEVATOR CAR AND ALSO A LOCKING DEVICE | [2012/19] | French: | PROCÉDÉ ET AGENCEMENT POUR OUVRIR ET FERMER UN PLAFOND SUSPENDU, OU ANALOGUE, D'UNE CABINE D'ASCENSEUR, ET DISPOSITIF DE VERROUILLAGE | [2012/19] | Entry into regional phase | 18.01.2012 | National basic fee paid | 18.01.2012 | Search fee paid | 18.01.2012 | Designation fee(s) paid | 18.01.2012 | Examination fee paid | Examination procedure | 18.01.2012 | Examination requested [2012/19] | 22.03.2016 | Amendment by applicant (claims and/or description) | 24.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 31.03.2017 | Reply to a communication from the examining division | 26.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.05.2018 | Reply to a communication from the examining division | 26.10.2018 | Communication of intention to grant the patent | 09.01.2019 | Fee for grant paid | 09.01.2019 | Fee for publishing/printing paid | 09.01.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.03.2017 | Opposition(s) | 28.11.2019 | No opposition filed within time limit [2020/06] | Fees paid | Renewal fee | 31.03.2012 | Renewal fee patent year 03 | 25.06.2013 | Renewal fee patent year 04 | 25.06.2014 | Renewal fee patent year 05 | 19.06.2015 | Renewal fee patent year 06 | 27.06.2016 | Renewal fee patent year 07 | 27.06.2017 | Renewal fee patent year 08 | 27.06.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2010 | AL | 27.02.2019 | AT | 27.02.2019 | CY | 27.02.2019 | CZ | 27.02.2019 | DK | 27.02.2019 | EE | 27.02.2019 | ES | 27.02.2019 | FI | 27.02.2019 | HR | 27.02.2019 | IT | 27.02.2019 | LT | 27.02.2019 | LV | 27.02.2019 | MC | 27.02.2019 | MK | 27.02.2019 | MT | 27.02.2019 | NL | 27.02.2019 | PL | 27.02.2019 | RO | 27.02.2019 | SE | 27.02.2019 | SI | 27.02.2019 | SK | 27.02.2019 | SM | 27.02.2019 | TR | 27.02.2019 | BG | 27.05.2019 | NO | 27.05.2019 | GR | 28.05.2019 | IS | 27.06.2019 | PT | 27.06.2019 | BE | 30.06.2019 | CH | 30.06.2019 | IE | 30.06.2019 | LI | 30.06.2019 | LU | 30.06.2019 | [2022/31] |
Former [2021/34] | HU | 30.06.2010 | |
AL | 27.02.2019 | ||
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
MT | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
IE | 30.06.2019 | ||
LI | 30.06.2019 | ||
LU | 30.06.2019 | ||
Former [2021/32] | HU | 30.06.2010 | |
AL | 27.02.2019 | ||
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
IE | 30.06.2019 | ||
LI | 30.06.2019 | ||
LU | 30.06.2019 | ||
Former [2021/26] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
IE | 30.06.2019 | ||
LI | 30.06.2019 | ||
LU | 30.06.2019 | ||
Former [2020/25] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
IE | 30.06.2019 | ||
LI | 30.06.2019 | ||
LU | 30.06.2019 | ||
Former [2020/21] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
IE | 30.06.2019 | ||
Former [2020/17] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/13] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/08] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/03] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/52] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/49] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RO | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/48] | DK | 27.02.2019 | |
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/47] | ES | 27.02.2019 | |
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/46] | FI | 27.02.2019 | |
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/39] | FI | 27.02.2019 | |
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/38] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/37] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/34] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
SE | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/33] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | Documents cited: | Search | [XAI]US3184017 (WHALLEY GRAVENOR NEVILLE) [X] 1-3,6,7,10-12,15 * figures 1,4-7 * [A] 8,9,13,14 [I] 4,5; | [A]JP2001316061 (MITSUBISHI ELECTRIC CORP) [A] 6* paragraph [0020]; figures 3,4 * | International search | [A]GB952981 (HENRY MCASKILL HAY); | [X]US3184017 (WHALLEY GRAVENOR NEVILLE); | [A]GB1201470 (NORCO INC [US]); | [X]FR2676773 (WANNER ISOFI ISOLATION [FR]); | [A]EP0982454 (BPB PLC [GB]); | [A]JP2001316061 (MITSUBISHI ELECTRIC CORP); | [A]EP1950166 (MITSUBISHI ELECTRIC CORP [JP]) |