EP2526346 - Methods of making improved secondary reflector panel (srp) with heat-treatable coating for concentrated solar power applications [Right-click to bookmark this link] | |||
Former [2012/48] | IMPROVED SECONDARY REFLECTOR PANEL (SRP) WITH HEAT-TREATABLE COATING FOR CONCENTRATED SOLAR POWER APPLICATIONS, AND/OR METHODS OF MAKING THE SAME | ||
[2020/19] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 10.05.2020 | ||
Former | Examination is in progress Status updated on 15.06.2018 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Guardian Glass, LLC 2300 Harmon Road Auburn Hills MI 48326 / US | [2020/40] |
Former [2018/02] | For all designated states Guardian Glass, LLC 2300 Harmon Road Auburn Hills MI 48326 / US | ||
Former [2012/48] | For all designated states Guardian Industries Corp. 2300 Harmon Road Auburn Hills, MI 48326-1714 / US | Inventor(s) | 01 /
LU, Yiwei 1726 Cedar Lane Ann Arbor, MI 48105 / US | 02 /
LINGLE, Philip 43 E. Temperance Road Temperance, MI 48182 / US | 03 /
MAIKOWSKI, Dave 14757 Thornridge Drive Plymouth, MI 48170 / US | 04 /
PRONE, Daniel 12810 Leverne Road Trenton, MI 48183 / US | [2012/48] | Representative(s) | Hoyng Rokh Monegier B.V. Rembrandt Tower, 30th Floor Amstelplein 1 1096 HA Amsterdam / NL | [N/P] |
Former [2020/40] | Hoyng Rokh Monegier LLP Rembrandt Tower, 31st Floor Amstelplein 1 1096 HA Amsterdam / NL | ||
Former [2012/48] | Hess, Peter K. G. Bardehle Pagenberg Partnerschaft Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 10801732.8 | 29.12.2010 | [2020/40] | WO2010US03260 | Priority number, date | US20100282307P | 19.01.2010 Original published format: US 282307 P | [2012/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011090469 | Date: | 28.07.2011 | Language: | EN | [2011/30] | Type: | A1 Application with search report | No.: | EP2526346 | Date: | 28.11.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.07.2011 takes the place of the publication of the European patent application. | [2012/48] | Type: | B1 Patent specification | No.: | EP2526346 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | International search report - published on: | EP | 28.07.2011 | Classification | IPC: | C03C8/02, F24B5/08, C03C17/36, F24S23/79, F24S23/70, G02B5/08 | [2020/19] | CPC: |
G02B5/0858 (EP,US);
C03B23/025 (US);
C03C17/361 (US);
C03C17/3618 (US);
C03C17/3626 (EP,US);
C03C17/3639 (US);
C03C17/3644 (EP,US);
C03C17/3652 (EP,US);
C03C17/366 (EP,US);
C03C17/3663 (US);
C03C8/02 (EP,US);
C23C28/30 (US);
|
Former IPC [2012/48] | F24J2/10, F24B5/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/48] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Herstellungsverfahren für verbesserte Sekundärreflektortafel mit wärmebehandelbarer Beschichtung für konzentrierte Sonnenenergieanwendungen | [2020/19] | English: | Methods of making improved secondary reflector panel (srp) with heat-treatable coating for concentrated solar power applications | [2020/19] | French: | Procédés de fabrication d'un panneau réflecteur secondaire (srp) amélioré pourvu d'un revêtement de traitement thermique pour applications d'énergie solaire concentrée | [2020/19] |
Former [2012/48] | VERBESSERTE SEKUNDÄRREFLEKTORTAFEL MIT WÄRMEBEHANDELBARER BESCHICHTUNG FÜR KONZENTRIERTE SONNENENERGIEANWENDUNGEN UND/ODER HERSTELLUNGSVERFAHREN DAFÜR | ||
Former [2012/48] | IMPROVED SECONDARY REFLECTOR PANEL (SRP) WITH HEAT-TREATABLE COATING FOR CONCENTRATED SOLAR POWER APPLICATIONS, AND/OR METHODS OF MAKING THE SAME | ||
Former [2012/48] | PANNEAU RÉFLECTEUR SECONDAIRE (SRP) AMÉLIORÉ POURVU D'UN REVÊTEMENT DE TRAITEMENT THERMIQUE POUR APPLICATIONS D'ÉNERGIE SOLAIRE CONCENTRÉE ET/OU PROCÉDÉS DE FABRICATION ASSOCIÉS | Entry into regional phase | 14.08.2012 | National basic fee paid | 14.08.2012 | Designation fee(s) paid | 14.08.2012 | Examination fee paid | Examination procedure | 08.01.2012 | Amendment by applicant (claims and/or description) | 14.08.2012 | Examination requested [2012/48] | 18.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 23.10.2018 | Reply to a communication from the examining division | 11.05.2020 | Communication of intention to grant the patent | 19.08.2020 | Fee for grant paid | 19.08.2020 | Fee for publishing/printing paid | 19.08.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.06.2018 | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 26.12.2012 | Renewal fee patent year 03 | 27.12.2013 | Renewal fee patent year 04 | 29.12.2014 | Renewal fee patent year 05 | 28.12.2015 | Renewal fee patent year 06 | 13.12.2016 | Renewal fee patent year 07 | 12.12.2017 | Renewal fee patent year 08 | 12.12.2018 | Renewal fee patent year 09 | 13.12.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.12.2010 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | MT | 30.09.2020 | NL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | IE | 29.12.2020 | LU | 29.12.2020 | BG | 30.12.2020 | NO | 30.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | GR | 31.12.2020 | LI | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | [2022/34] |
Former [2022/32] | HU | 29.12.2010 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
MT | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
LU | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
CH | 31.12.2020 | ||
GR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/27] | HU | 29.12.2010 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MT | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
LU | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
CH | 31.12.2020 | ||
GR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
LU | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
CH | 31.12.2020 | ||
GR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
LU | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
CH | 31.12.2020 | ||
GR | 31.12.2020 | ||
LI | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/52] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
LU | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
CH | 31.12.2020 | ||
GR | 31.12.2020 | ||
LI | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/49] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
LU | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/47] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
LU | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/46] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
IE | 29.12.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/40] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/24] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/23] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Cited in | International search | [Y]DE3626780 (MAN TECHNOLOGIE GMBH [DE]) [Y] 1-20 * abstract * * column 1, line 58 - column 3, line 7 *; | [Y]US2005018330 (SAKOO MEGUMI [JP], et al) [Y] 3,4 * abstract * * paragraph [0047] - paragraph [0049] * * figure 5 *; | [Y]EP1918740 (ASAHI GLASS CO LTD [JP]) [Y] 9-12,17,20 * abstract * * paragraph [0007] * * paragraph [0031] - paragraph [0032] *; | [YD]US2009101208 (VANDAL ROBERT A [US], et al) [YD] 1-20 * abstract * * paragraph [0052] - paragraph [0060] * * paragraph [0081] * * figures 3-7, 15 *; | [Y]KR20090132794 (KIM JONG HO [KR]) [Y] 15,16 * abstract ** paragraph [0024] * | Examination | US3765859 | US5111344 | EP0955274 | by applicant | US4056313 | US4059094 | US4117682 | US4161942 | US4237864 | US4572160 | US4608964 | US5030594 | US5195503 | US5275149 | US5347402 | US6050526 | US2007215205 | US2007223096 | US2009101208 | US7557053 | US2009217978 | US2009223252 | US7700870 | US7700869 | US2010122728 | US2010255980 | US20070612823 |