EP2501422 - APPARATUS FOR ADAPTABLE PRESSURE TREATMENT OF SLEEP DISORDERED BREATHING [Right-click to bookmark this link] | |||
Former [2012/39] | METHODS AND APPARATUS FOR ADAPTABLE PRESSURE TREATMENT OF SLEEP DISORDERED BREATHING | ||
[2019/28] | Status | No opposition filed within time limit Status updated on 30.10.2020 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 22.11.2019 | ||
Former | Grant of patent is intended Status updated on 03.07.2019 | ||
Former | Examination is in progress Status updated on 10.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states ResMed Pty Ltd 1 Elizabeth Macarthur Drive Bella Vista, NSW 2153 / AU | [2019/28] |
Former [2012/39] | For all designated states ResMed Limited 1 Elizabeth Macarthur Drive Bella Vista, NSW 2153 / AU | Inventor(s) | 01 /
RAMANAN, Dinesh C/- ResMed Ltd 1 Elizabeth Macarthur Drive Bella Vista, New South Wales 2253 / AU | 02 /
ARMITSTEAD, Jeffrey, Peter C/- ResMed Ltd 1 Elizabeth Macarthur Drive Bella Vista, New South Wales 2253 / AU | 03 /
MARTIN, Dion, Charles, Chewe C/- ResMed Ltd 1 Elizabeth Macarthur Drive Bella Vista, New South Wales 2153 / AU | [2012/39] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2019/52] |
Former [2012/39] | Vossius & Partner Siebertstrasse 4 81675 München / DE | Application number, filing date | 10829379.6 | 16.11.2010 | [2019/52] | WO2010AU01536 | Priority number, date | US20090261562P | 16.11.2009 Original published format: US 261562 P | [2012/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011057362 | Date: | 19.05.2011 | Language: | EN | [2011/20] | Type: | A1 Application with search report | No.: | EP2501422 | Date: | 26.09.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.05.2011 takes the place of the publication of the European patent application. | [2012/39] | Type: | B1 Patent specification | No.: | EP2501422 | Date: | 25.12.2019 | Language: | EN | [2019/52] | Search report(s) | International search report - published on: | AU | 19.05.2011 | (Supplementary) European search report - dispatched on: | EP | 11.05.2015 | Classification | IPC: | A61M16/00, A62B7/04 | [2012/39] | CPC: |
A61M16/0069 (EP,CN,US);
A61B5/08 (CN);
A61M16/0003 (CN);
A61M16/0006 (EP,US);
A61M16/024 (EP,US);
A61M16/06 (CN);
A61M2016/0027 (EP,CN,US);
A61M2016/003 (US);
A61M2016/0033 (CN);
A61M2016/0039 (EP,US);
A61M2205/3334 (CN,US);
A61M2205/50 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG ZUR EINSTELLBAREN DRUCKBEHANDLUNG VON SCHLAFATMUNGSSTÖRUNGEN | [2019/28] | English: | APPARATUS FOR ADAPTABLE PRESSURE TREATMENT OF SLEEP DISORDERED BREATHING | [2019/28] | French: | APPAREIL DE TRAITEMENT PAR PRESSION ADAPTABLE DE RESPIRATION AFFECTÉE PAR DES TROUBLES DU SOMMEIL | [2019/28] |
Former [2012/39] | VERFAHREN UND VORRICHTUNG ZUR EINSTELLBAREN DRUCKBEHANDLUNG VON SCHLAFATMUNGSSTÖRUNGEN | ||
Former [2012/39] | METHODS AND APPARATUS FOR ADAPTABLE PRESSURE TREATMENT OF SLEEP DISORDERED BREATHING | ||
Former [2012/39] | PROCÉDÉS ET APPAREIL DE TRAITEMENT PAR PRESSION ADAPTABLE DE RESPIRATION AFFECTÉE PAR DES TROUBLES DU SOMMEIL | Entry into regional phase | 12.06.2012 | National basic fee paid | 12.06.2012 | Search fee paid | 12.06.2012 | Designation fee(s) paid | 12.06.2012 | Examination fee paid | Examination procedure | 12.06.2012 | Examination requested [2012/39] | 08.12.2015 | Amendment by applicant (claims and/or description) | 10.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 29.05.2017 | Reply to a communication from the examining division | 03.06.2019 | Cancellation of oral proceeding that was planned for 05.06.2019 | 05.06.2019 | Date of oral proceedings (cancelled) | 04.07.2019 | Communication of intention to grant the patent | 12.11.2019 | Fee for grant paid | 12.11.2019 | Fee for publishing/printing paid | 12.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.02.2017 | Opposition(s) | 28.09.2020 | No opposition filed within time limit [2020/49] | Fees paid | Renewal fee | 23.11.2012 | Renewal fee patent year 03 | 18.11.2013 | Renewal fee patent year 04 | 10.11.2014 | Renewal fee patent year 05 | 10.11.2015 | Renewal fee patent year 06 | 10.11.2016 | Renewal fee patent year 07 | 13.11.2017 | Renewal fee patent year 08 | 14.11.2018 | Renewal fee patent year 09 | 14.11.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.11.2010 | AL | 25.12.2019 | AT | 25.12.2019 | CY | 25.12.2019 | CZ | 25.12.2019 | DK | 25.12.2019 | EE | 25.12.2019 | ES | 25.12.2019 | FI | 25.12.2019 | HR | 25.12.2019 | IT | 25.12.2019 | LT | 25.12.2019 | LV | 25.12.2019 | MC | 25.12.2019 | MK | 25.12.2019 | MT | 25.12.2019 | NL | 25.12.2019 | PL | 25.12.2019 | RO | 25.12.2019 | RS | 25.12.2019 | SE | 25.12.2019 | SI | 25.12.2019 | SK | 25.12.2019 | SM | 25.12.2019 | TR | 25.12.2019 | BG | 25.03.2020 | NO | 25.03.2020 | GR | 26.03.2020 | IS | 25.04.2020 | PT | 20.05.2020 | [2022/32] |
Former [2022/27] | HU | 16.11.2010 | |
AL | 25.12.2019 | ||
AT | 25.12.2019 | ||
CY | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
IT | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
MT | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
TR | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2022/26] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
IT | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
TR | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/31] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
IT | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/10] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
IT | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/51] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/47] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/40] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/37] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/36] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/35] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/32] | AL | 25.12.2019 | |
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/25] | FI | 25.12.2019 | |
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/23] | FI | 25.12.2019 | |
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/22] | FI | 25.12.2019 | |
LT | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
Former [2020/21] | NO | 25.03.2020 | Documents cited: | Search | [X]WO2007140512 (RESMED LTD [AU], et al) [X] 5-8,12-17 * figures 1-5 * * paragraph [0007] - paragraph [0016] * * paragraph [0063] - paragraph [0074] *; | [X]US2007142741 (BERTHON-JONES MICHAEL [AU], et al) [X] 5-8,12-17 * paragraph [0011] - paragraph [0049]; figures 1-11 *; | [X]US5535738 (ESTES MARK C [US], et al) [X] 5-8,12-17 * column 15, line 30 - column 17, line 63; figures 1-10 *; | [A]US2003121519 (ESTES MARK C [US], et al) [A] 1-4,9-11 * the whole document * | International search | [X]US5492113 (ESTES MARK C [US], et al); | [X]US2002088465 (HILL PETER D [US]); | [X]US6532960 (YURKO GREGORY [US]); | [X]US6640806 (YURKO GREGORY [US]); | [X]WO2006034549 (RESMED LTD [AU], et al); | [X]US2007142741 (BERTHON-JONES MICHAEL [AU], et al); | [Y]US2008066753 (MARTIN DION C C [AU], et al); | [X]US2008202528 (CARTER DUANE H [US], et al); | [X]US2009205662 (KWOK PHILIP RODNEY [AU], et al) | Examination | US5704345 |