EP2506644 - MOBILE COMMUNICATION SYSTEM, BASE STATION DEVICE, MOBILE STATION DEVICE, AND COMMUNICATION METHOD [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 07.07.2023 Database last updated on 03.06.2024 | |
Former | Grant of patent is intended Status updated on 20.02.2023 | ||
Former | Examination is in progress Status updated on 18.06.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Sharp Kabushiki Kaisha 22-22, Nagaike-cho Abeno-ku Osaka-shi, Osaka 545-8522 / JP | [2023/32] |
Former [2012/40] | For all designated states Sharp Kabushiki Kaisha 22-22, Nagaike-cho Abeno-ku Osaka-shi, Osaka 545-8522 / JP | Inventor(s) | 01 /
AIBA Tatsushi@c/o SHARP KABUSHIKI KAISHA 22-22, Nagaike-cho, Abeno-ku Osaka-shi Osaka 545-8522 / JP | 02 /
YAMADA, Shohei@c/o SHARP KABUSHIKI KAISHA 22-22, Nagaike-cho, Abeno-ku Osaka-shi Osaka 545-8522 / JP | [2012/40] | Representative(s) | Müller Hoffmann & Partner Patentanwälte mbB St.-Martin-Straße 58 81541 München / DE | [N/P] |
Former [2023/32] | Müller Hoffmann & Partner Patentanwälte mbB St.-Martin-Strasse 58 81541 München / DE | ||
Former [2012/40] | Müller - Hoffmann & Partner Patentanwälte Innere Wiener Straße 17 81667 München / DE | Application number, filing date | 10833286.7 | 25.11.2010 | [2023/32] | WO2010JP71050 | Priority number, date | JP20090269630 | 27.11.2009 Original published format: JP 2009269630 | [2012/40] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011065440 | Date: | 03.06.2011 | Language: | JA | [2011/22] | Type: | A1 Application with search report | No.: | EP2506644 | Date: | 03.10.2012 | Language: | EN | [2012/40] | Type: | B1 Patent specification | No.: | EP2506644 | Date: | 09.08.2023 | Language: | EN | [2023/32] | Search report(s) | International search report - published on: | JP | 03.06.2011 | (Supplementary) European search report - dispatched on: | EP | 22.12.2014 | Classification | IPC: | H04W72/04, H04J1/00, H04J11/00, H04W28/04, H04L1/18 | [2015/04] | CPC: |
H04B1/7087 (EP,US);
H04W72/21 (US);
H04L1/1812 (EP,US);
H04L1/1854 (EP,US);
H04L1/1861 (US);
H04L5/0053 (EP,US);
H04L5/0055 (US);
H04L5/0091 (EP,US);
H04W72/1273 (US);
|
Former IPC [2012/40] | H04W72/04, H04J1/00, H04J11/00, H04W28/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MOBILES KOMMUNIKATIONSSYSTEM, BASISSTATIONSVORRICHTUNG, MOBILSTATIONSVORRICHTUNG UND KOMMUNIKATIONSVERFAHREN | [2012/40] | English: | MOBILE COMMUNICATION SYSTEM, BASE STATION DEVICE, MOBILE STATION DEVICE, AND COMMUNICATION METHOD | [2012/40] | French: | SYSTÈME DE COMMUNICATION MOBILE, DISPOSITIF DE STATION DE BASE, DISPOSITIF DE STATION MOBILE ET PROCÉDÉ DE COMMUNICATION ASSOCIÉ | [2012/40] | Entry into regional phase | 13.06.2012 | Translation filed | 13.06.2012 | National basic fee paid | 13.06.2012 | Search fee paid | 13.06.2012 | Designation fee(s) paid | 13.06.2012 | Examination fee paid | Examination procedure | 16.09.2011 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 13.06.2012 | Examination requested [2012/40] | 21.07.2015 | Amendment by applicant (claims and/or description) | 24.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 31.10.2019 | Reply to a communication from the examining division | 06.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 10.09.2021 | Reply to a communication from the examining division | 09.02.2023 | Cancellation of oral proceeding that was planned for 15.02.2023 | 15.02.2023 | Date of oral proceedings (cancelled) | 21.02.2023 | Communication of intention to grant the patent | 28.06.2023 | Fee for grant paid | 28.06.2023 | Fee for publishing/printing paid | 28.06.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.06.2019 | Fees paid | Renewal fee | 27.11.2012 | Renewal fee patent year 03 | 18.11.2013 | Renewal fee patent year 04 | 25.11.2014 | Renewal fee patent year 05 | 24.11.2015 | Renewal fee patent year 06 | 23.11.2016 | Renewal fee patent year 07 | 24.11.2017 | Renewal fee patent year 08 | 22.11.2018 | Renewal fee patent year 09 | 26.11.2019 | Renewal fee patent year 10 | 20.11.2020 | Renewal fee patent year 11 | 24.11.2021 | Renewal fee patent year 12 | 24.11.2022 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 09.08.2023 | CZ | 09.08.2023 | DK | 09.08.2023 | EE | 09.08.2023 | ES | 09.08.2023 | FI | 09.08.2023 | HR | 09.08.2023 | IT | 09.08.2023 | LT | 09.08.2023 | LV | 09.08.2023 | NL | 09.08.2023 | PL | 09.08.2023 | RO | 09.08.2023 | RS | 09.08.2023 | SE | 09.08.2023 | SK | 09.08.2023 | SM | 09.08.2023 | NO | 09.11.2023 | GR | 10.11.2023 | IS | 09.12.2023 | PT | 11.12.2023 | [2024/26] |
Former [2024/23] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/22] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/20] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/10] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/09] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
LT | 09.08.2023 | ||
NL | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
Former [2024/08] | LT | 09.08.2023 | |
NL | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | Documents cited: | Search | [X] - NOKIA SIEMENS NETWORKS ET AL, "UL control signalling to support bandwidth extension in LTEAdvanced", 3GPP DRAFT; R1-090724, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090203), no. Athens, Greece; 20090203, XP050318591 [X] 1-9 * the whole document * | [XI] - CATT ET AL, "Benefits of Carrier Indicator on Multi-Channel ACK/NACK Transmission", 3GPP DRAFT; R1-093537, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090819), no. Shenzhen, China; 20090819, XP050351796 [X] 1,2,4,5,7,8 * figures 1-3 * * sections 1 and 2 * [I] 3,6,9 | [XI] - PANASONIC, "UL ACK/NACK transmission on PUCCH for carrier aggregation", 3GPP DRAFT; R1-094503, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091109), no. Jeju; 20091109, XP050388924 [X] 1,2,4,5,7,8 * the whole document * [I] 3,6,9 | International search | [X] - LG ELECTRONICS, "UL control channel design to support carrier aggregation", 3GPP TSG RAN WG1 #56BIS, RL-091204, (200903), page 1, XP050338819 | [Y] - PANASONIC, "PUCCH resource allocation schemes for carrier aggregation", 3GPP TSG RAN WG1 #58BIS, RL-093943, (200910), XP050388443 |