blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2485557

EP2485557 - METHOD AND SYSTEMS FOR COORDINATED SCHEDULING (CoMP) BASED ON CELL PRIORITY [Right-click to bookmark this link]
Former [2012/32]METHOD AND SYSTEM FOR COORDINATED SCHEDULING BASED ON CELL PRIORITY
[2019/20]
StatusThe application is deemed to be withdrawn
Status updated on  07.02.2020
Database last updated on 06.07.2024
FormerGrant of patent is intended
Status updated on  01.05.2019
FormerExamination is in progress
Status updated on  11.02.2019
Most recent event   Tooltip07.02.2020Application deemed to be withdrawnpublished on 11.03.2020  [2020/11]
Applicant(s)For all designated states
ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen, Guangdong 518057 / CN
[N/P]
Former [2012/32]For all designated states
ZTE Corporation
ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District
Shenzhen, Guangdong 518057 / CN
Inventor(s)01 / TIAN, Kaibo
c/o ZTE CORPORATION
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park, Nanshan, Shenzhen
Guangdong 518057 / CN
02 / ZHAO, Nan
c/o ZTE CORPORATION
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park, Nanshan, Shenzhen
Guangdong 518057 / CN
03 / PENG, Aihua
c/o ZTE CORPORATION
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park, Nanshan, Shenzhen
Guangdong 518057 / CN
04 / JIANG, Jing
c/o ZTE CORPORATION
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park, Nanshan, Shenzhen
Guangdong 518057 / CN
05 / ZHOU, Dong
c/o ZTE CORPORATION
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park, Nanshan, Shenzhen
Guangdong 518057 / CN
 [2012/32]
Representative(s)Davies, Gregory Mark
Urquhart-Dykes & Lord LLP
7th Floor, Churchill House
Churchill Way
Cardiff CF10 2HH / GB
[N/P]
Former [2012/32]Davies, Gregory Mark
Urquhart-Dykes & Lord LLP 7th Floor, Churchill House Churchill Way
Cardiff CF10 2HH / GB
Application number, filing date10835503.310.12.2010
WO2010CN79657
Priority number, dateCN20091025433411.12.2009         Original published format: CN200910254334
[2012/32]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2011069468
Date:16.06.2011
Language:ZH
[2011/24]
Type: A1 Application with search report 
No.:EP2485557
Date:08.08.2012
Language:EN
[2012/32]
Search report(s)International search report - published on:CN16.06.2011
(Supplementary) European search report - dispatched on:EP18.05.2017
ClassificationIPC:H04W72/10, H04W72/12, H04L5/00
[2019/20]
CPC:
H04B7/024 (EP,US); H04W72/56 (EP,US); H04L5/0035 (EP,US);
H04W24/10 (US); H04W4/00 (US); H04W72/20 (US);
H04W72/54 (EP) (-)
Former IPC [2017/25]H04B7/024, H04L5/00, H04W72/12
Former IPC [2012/32]H04W72/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/32]
TitleGerman:VERFAHREN UND SYSTEME FÜR KOORDINIERTES SCHEDULING (CoMP) AUF BASIS VON ZELLPRIORITÄTEN[2019/20]
English:METHOD AND SYSTEMS FOR COORDINATED SCHEDULING (CoMP) BASED ON CELL PRIORITY[2019/20]
French:PROCÉDÉ ET SYSTÈMEs DE PLANIFICATION COORDONNÉE (CoMP) BASÉE SUR UNE PRIORITÉ DE CELLULE[2019/20]
Former [2012/32]VERFAHREN UND SYSTEM FÜR KOORDINIERTE TERMINPLANUNG AUF BASIS VON ZELLPRIORITÄTEN
Former [2012/32]METHOD AND SYSTEM FOR COORDINATED SCHEDULING BASED ON CELL PRIORITY
Former [2012/32]PROCÉDÉ ET SYSTÈME DE PLANIFICATION COORDONNÉE BASÉE SUR UNE PRIORITÉ DE CELLULE
Entry into regional phase04.05.2012Translation filed 
27.03.2012National basic fee paid 
27.03.2012Search fee paid 
27.03.2012Designation fee(s) paid 
27.03.2012Examination fee paid 
Examination procedure27.03.2012Examination requested  [2012/32]
22.09.2017Amendment by applicant (claims and/or description)
14.02.2019Despatch of a communication from the examining division (Time limit: M04)
02.04.2019Reply to a communication from the examining division
02.05.2019Communication of intention to grant the patent
13.09.2019Application deemed to be withdrawn, date of legal effect  [2020/11]
17.10.2019Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2020/11]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  14.02.2019
Fees paidRenewal fee
11.12.2012Renewal fee patent year 03
12.12.2013Renewal fee patent year 04
11.12.2014Renewal fee patent year 05
23.12.2015Renewal fee patent year 06
13.12.2016Renewal fee patent year 07
12.12.2017Renewal fee patent year 08
21.12.2018Renewal fee patent year 09
Penalty fee
Additional fee for renewal fee
31.12.201910   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]  - CATT, "Considerations on Spatial Domain Coordination in LTE-A", 3GPP DRAFT; R1-094144, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091012), no. Miyazaki; 20091012, XP050388614 [X] 1-12 * paragraphs [0001] , [0003] - [03.1]; figures 1,2 *
 [A]  - 3gpp Ran Wg1, "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Further Advancements for E-UTRA Physical Layer Aspects (Release 9) 3GPP TR 36.814 V1.5.0(2009-11)", (20091113), pages 1 - 51, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_59/Docs/R1-095091.zip, (20170509), XP055370428 [A] 1-12 * paragraphs [0008] - [8.1.1] *
 [A]  - BENGTSSON M ET AL, "D1.4 Initial report on advanced multiple antenna systems", WIRELESS WORLD INITIATIVE NEW RADIO - WINNER+,, vol. Final/1.0, (20090116), pages 1 - 110, URL: http://projects.celtic-initiative.org/winner+/WINNER+%20Deliverables/D1.4_v1.0.pdf, (20090116), XP008113535 [A] 1-12 * paragraphs [0002] - [2.1.3.1]; figures 2.1,2.5 * * paragraphs [0003] - [3.2.1.2]; figure 3.2 *
International search[A]CN101442808  (UNIV XIDIAN [CN]);
 [A]CN101478342  (UNIV TSINGHUA [CN]);
 [A]CN101516112  (UNIV SHANGHAI JIAOTONG [CN]);
 [A]EP2101460  (NEC LAB AMERICA INC [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.