EP2514255 - BASE STATION, USER EQUIPMENT, COMMUNICATION SYSTEM AND NON-TRANSITORY COMPUTER READABLE MEDIUM FOR PERFORMING HANDOVER [Right-click to bookmark this link] | |||
Former [2012/43] | METHOD FOR PERFORMING HANDOVER, USER EQUIPMENT, BASE STATION, AND RADIO COMMUNICATION SYSTEM | ||
[2018/51] | Status | No opposition filed within time limit Status updated on 05.03.2021 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 27.03.2020 | ||
Former | Grant of patent is intended Status updated on 19.11.2019 | ||
Former | Examination is in progress Status updated on 13.04.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2020/18] |
Former [2012/43] | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | Inventor(s) | 01 /
TAKANO, Hiroaki c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | 02 /
SAKODA, Kazuyuki c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2012/43] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2014/26] |
Former [2012/43] | Körber, Martin Hans Mitscherlich & Partner Sonnenstraße 33 80331 München / DE | Application number, filing date | 10837237.6 | 02.12.2010 | [2020/18] | WO2010JP07036 | Priority number, date | JP20090285373 | 16.12.2009 Original published format: JP 2009285373 | [2012/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011074200 | Date: | 23.06.2011 | Language: | EN | [2011/25] | Type: | A1 Application with search report | No.: | EP2514255 | Date: | 24.10.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.06.2011 takes the place of the publication of the European patent application. | [2012/43] | Type: | B1 Patent specification | No.: | EP2514255 | Date: | 29.04.2020 | Language: | EN | [2020/18] | Search report(s) | International search report - published on: | JP | 23.06.2011 | (Supplementary) European search report - dispatched on: | EP | 03.02.2016 | Classification | IPC: | H04W72/04, H04W36/30, H04L5/00, // H04W36/28 | [2018/51] | CPC: |
H04W36/0058 (EP,CN,RU,US);
H04W36/02 (EP,CN,RU,US);
H04L5/0055 (RU,US);
H04W36/30 (US);
H04W36/302 (EP,CN,RU);
H04W72/0453 (EP,US);
H04W72/542 (US);
H04W74/0833 (US);
H04W76/15 (EP,US);
H04W36/28 (EP,CN,RU,US)
(-)
|
Former IPC [2016/09] | H04W72/04, H04W36/00 | ||
Former IPC [2012/43] | H04W72/04, H04W36/00, H04W76/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BASISSTATION, BENUTZERVORRICHTUNG, KOMMUNIKATIONSSYSTEM UND NICHTTRANSITORISCHES COMPUTERLESBARES MEDIUM ZUR DURCHFÜHRUNG EINER WEITERLEITUNG | [2018/51] | English: | BASE STATION, USER EQUIPMENT, COMMUNICATION SYSTEM AND NON-TRANSITORY COMPUTER READABLE MEDIUM FOR PERFORMING HANDOVER | [2018/51] | French: | STATION DE BASE, ÉQUIPEMENT UTILISATEUR, SYSTÈME DE COMMUNICATION ET SUPPORT LISIBLE PAR ORDINATEUR NON TRANSITOIRE POUR LA MISE EN OEUVRE DE TRANSFERT INTERCELLULAIRE | [2018/51] |
Former [2012/43] | VERFAHREN ZUR DURCHFÜHRUNG EINER WEITERLEITUNG, BENUTZERVORRICHTUNG, BASISSTATION UND FUNKKOMMUNIKATIONSSYSTEM | ||
Former [2012/43] | METHOD FOR PERFORMING HANDOVER, USER EQUIPMENT, BASE STATION, AND RADIO COMMUNICATION SYSTEM | ||
Former [2012/43] | PROCÉDÉ DE MISE EN OEUVRE DE TRANSFERT INTERCELLULAIRE, INSTALLATION D'ABONNÉ, STATION DE BASE ET SYSTÈME DE RADIOCOMMUNICATION | Entry into regional phase | 08.06.2012 | National basic fee paid | 08.06.2012 | Search fee paid | 08.06.2012 | Designation fee(s) paid | 08.06.2012 | Examination fee paid | Examination procedure | 08.06.2012 | Examination requested [2012/43] | 17.08.2016 | Amendment by applicant (claims and/or description) | 17.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 09.08.2018 | Reply to a communication from the examining division | 20.11.2019 | Communication of intention to grant the patent | 20.03.2020 | Fee for grant paid | 20.03.2020 | Fee for publishing/printing paid | 20.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18189351.2 / EP3445114 | EP19177922.2 / EP3637941 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.04.2018 | Opposition(s) | 01.02.2021 | No opposition filed within time limit [2021/14] | Fees paid | Renewal fee | 19.12.2012 | Renewal fee patent year 03 | 27.12.2013 | Renewal fee patent year 04 | 22.12.2014 | Renewal fee patent year 05 | 22.12.2015 | Renewal fee patent year 06 | 23.12.2016 | Renewal fee patent year 07 | 21.12.2017 | Renewal fee patent year 08 | 19.12.2018 | Renewal fee patent year 09 | 23.12.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.12.2010 | AL | 29.04.2020 | AT | 29.04.2020 | CY | 29.04.2020 | CZ | 29.04.2020 | DK | 29.04.2020 | EE | 29.04.2020 | ES | 29.04.2020 | FI | 29.04.2020 | HR | 29.04.2020 | IT | 29.04.2020 | LT | 29.04.2020 | LV | 29.04.2020 | MC | 29.04.2020 | MK | 29.04.2020 | MT | 29.04.2020 | NL | 29.04.2020 | PL | 29.04.2020 | RO | 29.04.2020 | RS | 29.04.2020 | SE | 29.04.2020 | SI | 29.04.2020 | SK | 29.04.2020 | SM | 29.04.2020 | TR | 29.04.2020 | BG | 29.07.2020 | NO | 29.07.2020 | GR | 30.07.2020 | IS | 29.08.2020 | PT | 31.08.2020 | IE | 02.12.2020 | LU | 02.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/33] |
Former [2022/32] | HU | 02.12.2010 | |
AL | 29.04.2020 | ||
AT | 29.04.2020 | ||
CY | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
MK | 29.04.2020 | ||
MT | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/27] | HU | 02.12.2010 | |
AL | 29.04.2020 | ||
AT | 29.04.2020 | ||
CY | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
MT | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/26] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
TR | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/47] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 02.12.2020 | ||
LU | 02.12.2020 | ||
Former [2021/46] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
IE | 02.12.2020 | ||
Former [2021/40] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
MC | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/24] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SI | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/10] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
PL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SK | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/09] | AL | 29.04.2020 | |
AT | 29.04.2020 | ||
CZ | 29.04.2020 | ||
DK | 29.04.2020 | ||
EE | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
IT | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/08] | AL | 29.04.2020 | |
DK | 29.04.2020 | ||
ES | 29.04.2020 | ||
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RO | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
SM | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/04] | AL | 29.04.2020 | |
FI | 29.04.2020 | ||
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
NL | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2021/01] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
BG | 29.07.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/51] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
RS | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/50] | FI | 29.04.2020 | |
HR | 29.04.2020 | ||
LT | 29.04.2020 | ||
LV | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
GR | 30.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/48] | FI | 29.04.2020 | |
LT | 29.04.2020 | ||
SE | 29.04.2020 | ||
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
PT | 31.08.2020 | ||
Former [2020/47] | LT | 29.04.2020 | |
NO | 29.07.2020 | ||
IS | 29.08.2020 | ||
Former [2020/46] | IS | 29.08.2020 | Documents cited: | Search | [X] - "DRAFT Amendment to IEEE Standard for Local and metropolitan area networks Part 16: Air Interface for Fixed and Mobile Broadband Wireless Access Systems ; P80216m_D2", IEEE DRAFT; P80216M_D2, IEEE-SA, PISCATAWAY, NJ USA, (20091015), vol. 802.16m, no. D2, pages 1 - 621, XP017716353 [X] 1-13 * chapter 15.2.8.2.9.2.3.6 * * chapters 15.2.8, 15.2.6.3, 15.2.8.2.11.1, 15.3.7.2.6.7.1, 15.3.9.1.3, 15.2.8.1, 15.2.8.2, 15.2.6.5.2.3.1, 15.2.6.5.2.3.2 * * chapters 3, 15.2.6.1, 5.2.11, 15.3.5.1, 15.3.5.3.1, 15.3.6.2.2.2, 15.3.8.1, 15.3.8.2, 15.3.8.3.1, 15.3.5.3.1, 15.3.9.3.1.3, 15.3.6.5.2.2, 15.3.6.5.2.3 * * figures 9, 10, 386, 516, 524, 562, 734 * | [X] - "Multi-Carrier DG Harmonized Text Proposal - MAC ; C80216m-09_1283r2", IEEE DRAFT; C80216M-09_1283R2, IEEE-SA, PISCATAWAY, NJ USA, (20090716), vol. 802.16m, pages 1 - 21, XP017612497 [X] 1-13 * chapter 15.2.9.2.9.2.3.3 * * chapters 15.2.9 * | [X] - CATT, "Handover for Carrier Aggregation", 3GPP DRAFT; R2-093722, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090623), no. Los Angeles, USA; 20090623, XP050351955 [X] 1-13 *chapter 2, 2.1 * | [I] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Feasibility study for Further Advancements for E-UTRA (LTE-Advanced) (Release 9)", 3GPP STANDARD; 3GPP TR 36.912, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091214), no. V9.1.0, pages 1 - 58, XP050400838 [I] 1-13 * chapters 5, 16.5, 11 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 9)", 3GPP STANDARD; 3GPP TS 36.300, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090901), no. V9.1.0, pages 1 - 165, XP050377587 [A] 1-13 * chapter 7, 10.1.2-10.1.5, 11, 16.1.4 * | International search | [Y]JP2002112304 (MITSUBISHI ELECTRIC CORP); | [X] - CATT, "Handover for Carrier Aggregation", 3GPP TSG RAN WG2 Meeting #66bis R2-093722, (20090629), XP008157409 | [A] - HUAWEI, "Intra LTE-A UE Handover Procedure inter-eNB for CA", 3GPP TSG RAN WG2 Meeting #67 R2-094731, (20090824), XP008157474 | by applicant | JP2009232293 | - "Draft amendment to IEEE standard for local and metropolitan area networks part 16: Air interface for fixed and mobile broadband wireless access systems; P80216M_D2", IEEE-SA, PISCATAWAY, NJ USA, (20091015), vol. 802, pages 1 - 621 | - "Multi-carrier DG Harmonized text proposal - MAC; C80216m-09_1283r2", IEEE DRAFT; IEEE-SA, PISCATAWAY, NJ USA, (20090716), vol. 802, pages 1 - 21 |