blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2465219

EP2465219 - FILTER DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  21.06.2019
FormerGrant of patent is intended
Status updated on  31.01.2019
FormerExamination is in progress
Status updated on  29.09.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2019/30]
Former [2012/25]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
Inventor(s)01 / Fabian Nikolaus HAUSKE
Huawei Technologies Co., Ltd.
Intellectual Property Department
B1-3A, Bantian Longgand District 518129
Shenzhen / CN
 [2019/09]
Former [2012/25]01 / FABIAN, Nikolaus Hauske
European Research Centre P&S
Huawei Technologies Co. LTD.
Riesstrasse 25
80992 Munich / DE
Representative(s)Kreuz, Georg Maria
Huawei Technologies Duesseldorf GmbH
Riesstraße 25
80992 München / DE
[2019/30]
Former [2012/25]Kreuz, Georg Maria
Huawei Technologies Dessauerstrasse 3
80992 Munich / DE
Application number, filing date10846855.404.03.2010
[2019/30]
WO2010CN70866
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2011106936
Date:09.09.2011
Language:EN
[2011/36]
Type: A1 Application with search report 
No.:EP2465219
Date:20.06.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 09.09.2011 takes the place of the publication of the European patent application.
[2012/25]
Type: B1 Patent specification 
No.:EP2465219
Date:24.07.2019
Language:EN
[2019/30]
Search report(s)International search report - published on:CN09.09.2011
(Supplementary) European search report - dispatched on:EP14.08.2012
ClassificationIPC:H04L7/027, H04B10/60, H04B10/2513
[2019/04]
CPC:
H04B10/60 (EP,BR,US); H04B10/25133 (EP,BR,US); H04L7/027 (EP,BR,US)
Former IPC [2012/37]H04B10/18, H03H17/00, H03H21/00, H04L7/027
Former IPC [2012/25]H04B10/18, H03H17/00, H03H21/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/25]
Extension statesALNot yet paid
BANot yet paid
MENot yet paid
RSNot yet paid
TitleGerman:FILTERVORRICHTUNG[2012/25]
English:FILTER DEVICE[2012/25]
French:DISPOSITIF DE FILTRAGE[2012/25]
Entry into regional phase06.03.2012National basic fee paid 
06.03.2012Search fee paid 
06.03.2012Designation fee(s) paid 
06.03.2012Examination fee paid 
Examination procedure06.03.2012Examination requested  [2012/25]
11.03.2013Amendment by applicant (claims and/or description)
21.06.2016Despatch of a communication from the examining division (Time limit: M04)
17.10.2016Reply to a communication from the examining division
19.09.2017Despatch of a communication from the examining division (Time limit: M04)
25.10.2017Reply to a communication from the examining division
02.02.2018Despatch of a communication from the examining division (Time limit: M02)
05.04.2018Reply to a communication from the examining division
07.08.2018Despatch of a communication from the examining division (Time limit: M04)
28.11.2018Reply to a communication from the examining division
01.02.2019Communication of intention to grant the patent
11.06.2019Fee for grant paid
11.06.2019Fee for publishing/printing paid
11.06.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  21.06.2016
Opposition(s)03.06.2020No opposition filed within time limit [2020/33]
Fees paidRenewal fee
06.03.2012Renewal fee patent year 03
02.04.2013Renewal fee patent year 04
31.03.2014Renewal fee patent year 05
31.03.2015Renewal fee patent year 06
31.03.2016Renewal fee patent year 07
31.03.2017Renewal fee patent year 08
03.04.2018Renewal fee patent year 09
01.04.2019Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.03.2010
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MK24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE04.03.2020
LU04.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/32]
Former [2022/27]HU04.03.2010
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE04.03.2020
LU04.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/12]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE04.03.2020
LU04.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/08]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE04.03.2020
LU04.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
LU04.03.2020
Former [2020/49]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/37]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/36]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/27]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/25]AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
SK24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/24]AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/23]AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/22]AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/17]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/12]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/11]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
Former [2020/10]AT24.07.2019
FI24.07.2019
LT24.07.2019
NL24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
PT25.11.2019
Former [2020/09]FI24.07.2019
LT24.07.2019
NL24.07.2019
NO24.10.2019
Former [2020/08]LT24.07.2019
NL24.07.2019
NO24.10.2019
Former [2020/07]NL24.07.2019
Documents cited:Search[XI]US7596323  (PRICE ALISTAIR J [US], et al) [X] 1,14 * column 11, line 4 - column 12, line 47 * * column 19, line 17 - column 20, line 8; figure 3 * [I] 2-13,15;
 [XI]US2004252754  (WOOD JERRY BUSBY [US], et al) [X] 1,14 * paragraph [0006] * * paragraph [0011] - paragraph [0017]; figure 1; claim 8 * [I] 2-13,15;
 [A]EP0551081  (MITSUBISHI ELECTRIC CORP [JP]) [A] 1-15 * abstract *;
 [A]US2008205905  (TAO ZHENNING [CN], et al) [A] 1-15 * abstract *;
 [A]US2003074381  (AWAD THOMAS JEFFERSON [CA], et al) [A] 1-15 * abstract *
International search[A]CN1734988  (LUCENT TECHNOLOGIES INC [US]);
 [A]CN101411063  (ERICSSON TELEFON AB L M [SE]);
 [A]US6970896  (AWAD THOMAS JEFFERSON [CA], et al);
 [A]  - HAUSKE, FABIAN. N. ET AL., "Optical Performance Monitoring in Digital Coherent Receivers", JOURNAL OF LIGHTWAVE TECHNOLOGY, (20090815), vol. 27, no. 16, pages 3623 - 3631, XP011262206
 [A]  - KUSCHNEROV, MAXIM ET AL., "DSP for Coherent Single-Carrier Receivers", JOURNAL OF LIGHTWAVE TECHNOLOGY, (20090815), vol. 27, no. 16, pages 3614 - 3622, XP011262207
ExaminationUS2007092260
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.