EP2583390 - A METHOD AND APPARATUS FOR CHANGING A MODE IN AN OPTICAL NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.04.2020 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 03.05.2019 | ||
Former | Grant of patent is intended Status updated on 21.02.2019 | ||
Former | Examination is in progress Status updated on 15.12.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2019/23] |
Former [2013/17] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
ÖHLÉN, Peter Lundagatan 42A S-117 27 Stockholm / SE | [2013/17] | Representative(s) | Brann AB P.O. Box 3690 Sveavägen 63 103 59 Stockholm / SE | [N/P] |
Former [2019/23] | Brann AB P.O. Box 3690 Drottninggatan 27 103 59 Stockholm / SE | ||
Former [2013/17] | Strandin, Heléne Bergenstråhle & Lindvall AB P.O. Box 117 04 118 93 Stockholm / SE | Application number, filing date | 10853323.3 | 18.06.2010 | [2019/23] | WO2010SE50694 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011159212 | Date: | 22.12.2011 | Language: | EN | [2011/51] | Type: | A1 Application with search report | No.: | EP2583390 | Date: | 24.04.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.12.2011 takes the place of the publication of the European patent application. | [2013/17] | Type: | B1 Patent specification | No.: | EP2583390 | Date: | 05.06.2019 | Language: | EN | [2019/23] | Search report(s) | International search report - published on: | SE | 22.12.2011 | (Supplementary) European search report - dispatched on: | EP | 18.05.2016 | Classification | IPC: | H04B10/079, H04B10/572 | [2016/24] | CPC: |
H04B10/572 (EP,US);
H04B10/07957 (US)
|
Former IPC [2013/17] | H04B10/08, H04B14/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2013/17] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR ÄNDERUNG EINES MODUS BEI EINEM OPTISCHEN NETZWERK | [2013/17] | English: | A METHOD AND APPARATUS FOR CHANGING A MODE IN AN OPTICAL NETWORK | [2013/17] | French: | PROCÉDÉ ET APPAREIL POUR CHANGER UN MODE DANS UN RÉSEAU OPTIQUE | [2013/17] | Entry into regional phase | 17.01.2013 | National basic fee paid | 17.01.2013 | Search fee paid | 17.01.2013 | Designation fee(s) paid | 17.01.2013 | Examination fee paid | Examination procedure | 17.01.2013 | Examination requested [2013/17] | 06.10.2016 | Amendment by applicant (claims and/or description) | 14.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 06.04.2018 | Reply to a communication from the examining division | 31.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 21.11.2018 | Reply to a communication from the examining division | 22.02.2019 | Communication of intention to grant the patent | 24.04.2019 | Fee for grant paid | 24.04.2019 | Fee for publishing/printing paid | 24.04.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.12.2017 | Opposition(s) | 06.03.2020 | No opposition filed within time limit [2020/20] | Fees paid | Renewal fee | 31.12.2012 | Renewal fee patent year 03 | 27.06.2013 | Renewal fee patent year 04 | 30.06.2014 | Renewal fee patent year 05 | 29.06.2015 | Renewal fee patent year 06 | 27.06.2016 | Renewal fee patent year 07 | 27.06.2017 | Renewal fee patent year 08 | 27.06.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.06.2010 | AL | 05.06.2019 | AT | 05.06.2019 | CY | 05.06.2019 | CZ | 05.06.2019 | DK | 05.06.2019 | EE | 05.06.2019 | ES | 05.06.2019 | FI | 05.06.2019 | HR | 05.06.2019 | IT | 05.06.2019 | LT | 05.06.2019 | LV | 05.06.2019 | MC | 05.06.2019 | MK | 05.06.2019 | MT | 05.06.2019 | NL | 05.06.2019 | PL | 05.06.2019 | RO | 05.06.2019 | SE | 05.06.2019 | SI | 05.06.2019 | SK | 05.06.2019 | SM | 05.06.2019 | TR | 05.06.2019 | IE | 18.06.2019 | LU | 18.06.2019 | BE | 30.06.2019 | CH | 30.06.2019 | LI | 30.06.2019 | FR | 05.08.2019 | BG | 05.09.2019 | NO | 05.09.2019 | GR | 06.09.2019 | IS | 05.10.2019 | PT | 07.10.2019 | [2022/31] |
Former [2021/34] | HU | 18.06.2010 | |
AL | 05.06.2019 | ||
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
MT | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 18.06.2019 | ||
LU | 18.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
FR | 05.08.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2021/32] | HU | 18.06.2010 | |
AL | 05.06.2019 | ||
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 18.06.2019 | ||
LU | 18.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
FR | 05.08.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2021/26] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 18.06.2019 | ||
LU | 18.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
FR | 05.08.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/36] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 18.06.2019 | ||
LU | 18.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
FR | 05.08.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/25] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 18.06.2019 | ||
LU | 18.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/22] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 18.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/21] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 18.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/17] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/13] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/12] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/11] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/10] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/09] | AL | 05.06.2019 | |
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2020/07] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/51] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/50] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/49] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/48] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/47] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
NO | 05.09.2019 | Documents cited: | Search | [XI]US2007154217 (KIM TAE Y [KR], et al) [X] 1,5,8,16 * figures 1,2,4,5 * * paragraphs [0017] , [0020] , [0045] , [0046] , [0047] , [0050] , [0057] , [0058] , [0060] , [0061] , [0062] , [0065] , [0067] - [0072] - [0075] , [0076] *[I] 2-4,6,7,9-15,17-19 | International search | [A]US2004033022 (ALTHAUS HANS-LUDWIG [DE], et al); | [A]US2007280681 (FRANKEL MICHAEL Y [US], et al); | [A]GB2466212 (BOOKHAM TECHNOLOGY PLC [GB]) | by applicant | US2007154217 |