blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2625884

EP2625884 - METHOD AND APPARATUS FOR LTE CHANNEL STATE INFORMATION ESTIMATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.05.2021
Database last updated on 29.06.2024
FormerThe patent has been granted
Status updated on  12.06.2020
FormerGrant of patent is intended
Status updated on  16.05.2020
FormerExamination is in progress
Status updated on  04.05.2020
FormerGrant of patent is intended
Status updated on  15.01.2020
FormerExamination is in progress
Status updated on  25.01.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, ON N2K 0A7 / CA
[2020/29]
Former [2013/48]For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, ON N2K 0A7 / CA
Former [2013/36]For all designated states
BlackBerry Limited
295 Phillip Street
Waterloo ON N2L 3W8 / CA
Former [2013/33]For all designated states
Research In Motion Limited
295 Phillip Street
Waterloo, ON N2L 3W8 / CA
Inventor(s)01 / SIMMONS, Sean, Bartholomew
72437 - 305 Phillip Street
Waterloo, Ontario N2L 3W8 / CA
02 / WU, Huan
12225 - 4000 Innovation Drive
Kanata, Ontario K2K 3K1 / CA
03 / JIA, Yongkang
12637 - 450 March Road
Ottawa, Ontario K2K 3K2 / CA
 [2013/33]
Representative(s)Vigand, Philippe, et al
Novagraaf International SA
Chemin de l'Echo 3
1213 Onex - Genève / CH
[2020/29]
Former [2013/33]Roberts, Gwilym Vaughan, et al
Kilburn & Strode LLP
Electronics
20 Red Lion Street
London WC1R 4PJ / GB
Application number, filing date10858019.208.10.2010
[2020/29]
WO2010CA01575
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012045143
Date:12.04.2012
Language:EN
[2012/15]
Type: A1 Application with search report 
No.:EP2625884
Date:14.08.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 12.04.2012 takes the place of the publication of the European patent application.
[2013/33]
Type: B1 Patent specification 
No.:EP2625884
Date:15.07.2020
Language:EN
[2020/29]
Search report(s)International search report - published on:CA12.04.2012
(Supplementary) European search report - dispatched on:EP30.10.2017
ClassificationIPC:H04W24/00, H04B7/06, H04L1/00, H04L1/20, H04L25/02, H04L25/03, H04W24/10, H04B7/0452
[2017/30]
CPC:
H04L25/0204 (EP,US); H04B7/0689 (EP,US); H04L1/0026 (EP,US);
H04L1/0031 (EP,US); H04L1/20 (EP,US); H04L25/03343 (EP,US);
H04B7/0452 (EP,US); H04B7/063 (EP,US); H04B7/0632 (EP,US);
H04B7/0639 (EP,US); H04B7/0697 (EP,US); H04L25/0244 (EP,US);
H04L25/0248 (EP,US); H04W24/10 (EP,US) (-)
Former IPC [2013/33]H04W24/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/33]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR SCHÄTZUNG VON LTE-KANALSTATUSINFORMATIONEN[2013/33]
English:METHOD AND APPARATUS FOR LTE CHANNEL STATE INFORMATION ESTIMATION[2013/33]
French:PROCÉDÉ ET APPAREIL POUR L'ESTIMATION DE DONNÉES D'ÉTAT DE CANAL LTE[2013/33]
Entry into regional phase08.05.2013National basic fee paid 
08.05.2013Search fee paid 
08.05.2013Designation fee(s) paid 
08.05.2013Examination fee paid 
Examination procedure08.05.2013Examination requested  [2013/33]
28.03.2018Amendment by applicant (claims and/or description)
25.01.2019Despatch of a communication from the examining division (Time limit: M04)
16.05.2019Reply to a communication from the examining division
16.01.2020Communication of intention to grant the patent
01.05.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
01.05.2020Fee for grant paid
01.05.2020Fee for publishing/printing paid
15.05.2020Information about intention to grant a patent
15.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  25.01.2019
Opposition(s)16.04.2021No opposition filed within time limit [2021/25]
Fees paidRenewal fee
08.05.2013Renewal fee patent year 03
28.10.2013Renewal fee patent year 04
27.10.2014Renewal fee patent year 05
27.10.2015Renewal fee patent year 06
27.10.2016Renewal fee patent year 07
27.10.2017Renewal fee patent year 08
29.10.2018Renewal fee patent year 09
28.10.2019Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.10.2010
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
MK15.07.2020
MT15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
TR15.07.2020
IE08.10.2020
LU08.10.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
IS15.11.2020
PT16.11.2020
[2022/32]
Former [2022/27]HU08.10.2010
AL15.07.2020
AT15.07.2020
CY15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
MT15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
TR15.07.2020
IE08.10.2020
LU08.10.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
IS15.11.2020
PT16.11.2020
Former [2022/26]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
TR15.07.2020
IE08.10.2020
LU08.10.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/46]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
IE08.10.2020
LU08.10.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/37]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
LU08.10.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/36]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SI15.07.2020
SK15.07.2020
SM15.07.2020
LU08.10.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
BE31.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/31]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
MC15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SK15.07.2020
SM15.07.2020
LU08.10.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/28]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SK15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/25]AL15.07.2020
AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/23]AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
SM15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/22]AT15.07.2020
CZ15.07.2020
DK15.07.2020
EE15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RO15.07.2020
RS15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/20]AT15.07.2020
DK15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
IT15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RS15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/17]AT15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
NL15.07.2020
PL15.07.2020
RS15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/10]AT15.07.2020
ES15.07.2020
FI15.07.2020
HR15.07.2020
LT15.07.2020
LV15.07.2020
PL15.07.2020
RS15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
IS15.11.2020
PT16.11.2020
Former [2021/09]AT15.07.2020
ES15.07.2020
FI15.07.2020
LT15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
GR16.10.2020
PT16.11.2020
Former [2021/08]ES15.07.2020
FI15.07.2020
LT15.07.2020
SE15.07.2020
BG15.10.2020
NO15.10.2020
PT16.11.2020
Former [2021/07]FI15.07.2020
LT15.07.2020
NO15.10.2020
Documents cited:Search[Y]US2006224655  (SHIRAI HIDEKI [JP], et al) [Y] 3,4 * paragraph [0001] * * paragraph [0066] - paragraph [0067] * * paragraph [0085] - paragraph [0086] * * paragraph [0111] - paragraph [0112] * * paragraph [0118] * * paragraph [0120] *;
 [A]US2006285585  (SAMPATH HEMANTH [US]) [A] 8-15 * abstract * * paragraph [0011] - paragraph [0012] * * paragraph [0041] - paragraph [0047] * * paragraph [0051] *;
 [X]US2010002598  (PAN KYLE JUNG-LIN [US], et al) [X] 1,2 * paragraph [0006] - paragraph [0007] * * paragraph [0023] - paragraph [0027] * * paragraph [0064] - paragraph [0067] *;
 [XY]  - NOKIA ET AL, "Performance of Explicit Feedback and Implicit Feedback in Supporting DL Multi-Antenna", 3GPP DRAFT; R1-094655, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091109), no. Jeju; 20091109, XP050389060 [X] 1,2 * 1. Introduction * * 2. Single-Cell Transmission * [Y] 3,4
 [Y]  - RITT ET AL, "Eigen-mode Close-Loop Transmission for E-UTRA MIMO", 3GPP DRAFT; R1-060421, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20060209), vol. RAN WG1, no. Denver, USA; 20060209, XP050101365 [Y] 3,4 * 2. ECLT * * 2.1.1 Signal Model * * 2.1.2 Calculation and eigen-decomposition of correlation matrix * * 2.1.4 Determination of stream number * * 2.2 Feedback channel requirements *
 [Y]  - ERMOLAYEV V T ET AL, "Estimation of channel matrix rank for multielement antenna arrays working in multipath fading environment", CIRCUITS AND SYSTEMS FOR COMMUNICATIONS, 2002. PROCEEDINGS. ICCSC '02. 1ST IEEE INTERNATIONAL CONFERENCE ON 26-28 JUNE 2002, PISCATAWAY, NJ, USA,IEEE, (20020626), ISBN 978-5-7422-0260-8, pages 416 - 419, XP010600469 [Y] 3,4 * abstract * * I. Introduction * * II. MCIR matrix and space signal proseccing in antenna array * * III. Estimation of MCIR matrix rank *
 [A]  - ZTE, "Performance comparison between explicit feedback and implicit feedback", 3GPP DRAFT; R1-101406_MU_IMPEXP_COMPARISON, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100216), vol. RAN WG1, no. San Francisco, USA; 20100222, XP050418874 [A] 8-15 * 2. Simulation Setup * * 2.2 Explicit feedback *
 [AD]  - ERICSSON, "System-leven evaluation of OFDM - further considerations", 3GPP DRAFT; R1-031303, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20031119), vol. RAN WG1, no. Lisbon, Portugal; 20031119, XP050098349 [AD] 8-15 * 1. Introduction * * 3. The exponential ESM *
 [AD]  - KRISHNA SAYANA ET AL, "Short Term Link Performance Modeling for ML Receivers with Mutual Information per Bit Metrics", 2008 IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE : [IEEE GLOBECOM 2008] ; NEW ORLEANS, LOUISIANA, 30 NOVEMBER 2008 - 04 DECEMBER 2008, IEEE, PISCATAWAY, NJ, USA, (20081130), ISBN 978-1-4244-2324-8, pages 1 - 6, XP031370510 [AD] 8-15 * the whole document *
International search[A]WO2009002097  (LG ELECTRONICS INC [KR], et al);
 [Y]WO2010015429  (ICERA INC [US], et al);
 [Y]WO2010106549  (CT OF EXCELLENCE IN WIRELESS [IN], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.