EP2625884 - METHOD AND APPARATUS FOR LTE CHANNEL STATE INFORMATION ESTIMATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.05.2021 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 12.06.2020 | ||
Former | Grant of patent is intended Status updated on 16.05.2020 | ||
Former | Examination is in progress Status updated on 04.05.2020 | ||
Former | Grant of patent is intended Status updated on 15.01.2020 | ||
Former | Examination is in progress Status updated on 25.01.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, ON N2K 0A7 / CA | [2020/29] |
Former [2013/48] | For all designated states BlackBerry Limited 2200 University Avenue East Waterloo, ON N2K 0A7 / CA | ||
Former [2013/36] | For all designated states BlackBerry Limited 295 Phillip Street Waterloo ON N2L 3W8 / CA | ||
Former [2013/33] | For all designated states Research In Motion Limited 295 Phillip Street Waterloo, ON N2L 3W8 / CA | Inventor(s) | 01 /
SIMMONS, Sean, Bartholomew 72437 - 305 Phillip Street Waterloo, Ontario N2L 3W8 / CA | 02 /
WU, Huan 12225 - 4000 Innovation Drive Kanata, Ontario K2K 3K1 / CA | 03 /
JIA, Yongkang 12637 - 450 March Road Ottawa, Ontario K2K 3K2 / CA | [2013/33] | Representative(s) | Vigand, Philippe, et al Novagraaf International SA Chemin de l'Echo 3 1213 Onex - Genève / CH | [2020/29] |
Former [2013/33] | Roberts, Gwilym Vaughan, et al Kilburn & Strode LLP Electronics 20 Red Lion Street London WC1R 4PJ / GB | Application number, filing date | 10858019.2 | 08.10.2010 | [2020/29] | WO2010CA01575 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012045143 | Date: | 12.04.2012 | Language: | EN | [2012/15] | Type: | A1 Application with search report | No.: | EP2625884 | Date: | 14.08.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.04.2012 takes the place of the publication of the European patent application. | [2013/33] | Type: | B1 Patent specification | No.: | EP2625884 | Date: | 15.07.2020 | Language: | EN | [2020/29] | Search report(s) | International search report - published on: | CA | 12.04.2012 | (Supplementary) European search report - dispatched on: | EP | 30.10.2017 | Classification | IPC: | H04W24/00, H04B7/06, H04L1/00, H04L1/20, H04L25/02, H04L25/03, H04W24/10, H04B7/0452 | [2017/30] | CPC: |
H04L25/0204 (EP,US);
H04B7/0689 (EP,US);
H04L1/0026 (EP,US);
H04L1/0031 (EP,US);
H04L1/20 (EP,US);
H04L25/03343 (EP,US);
H04B7/0452 (EP,US);
H04B7/063 (EP,US);
H04B7/0632 (EP,US);
H04B7/0639 (EP,US);
H04B7/0697 (EP,US);
H04L25/0244 (EP,US);
|
Former IPC [2013/33] | H04W24/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR SCHÄTZUNG VON LTE-KANALSTATUSINFORMATIONEN | [2013/33] | English: | METHOD AND APPARATUS FOR LTE CHANNEL STATE INFORMATION ESTIMATION | [2013/33] | French: | PROCÉDÉ ET APPAREIL POUR L'ESTIMATION DE DONNÉES D'ÉTAT DE CANAL LTE | [2013/33] | Entry into regional phase | 08.05.2013 | National basic fee paid | 08.05.2013 | Search fee paid | 08.05.2013 | Designation fee(s) paid | 08.05.2013 | Examination fee paid | Examination procedure | 08.05.2013 | Examination requested [2013/33] | 28.03.2018 | Amendment by applicant (claims and/or description) | 25.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.05.2019 | Reply to a communication from the examining division | 16.01.2020 | Communication of intention to grant the patent | 01.05.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 01.05.2020 | Fee for grant paid | 01.05.2020 | Fee for publishing/printing paid | 15.05.2020 | Information about intention to grant a patent | 15.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.01.2019 | Opposition(s) | 16.04.2021 | No opposition filed within time limit [2021/25] | Fees paid | Renewal fee | 08.05.2013 | Renewal fee patent year 03 | 28.10.2013 | Renewal fee patent year 04 | 27.10.2014 | Renewal fee patent year 05 | 27.10.2015 | Renewal fee patent year 06 | 27.10.2016 | Renewal fee patent year 07 | 27.10.2017 | Renewal fee patent year 08 | 29.10.2018 | Renewal fee patent year 09 | 28.10.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.10.2010 | AL | 15.07.2020 | AT | 15.07.2020 | CY | 15.07.2020 | CZ | 15.07.2020 | DK | 15.07.2020 | EE | 15.07.2020 | ES | 15.07.2020 | FI | 15.07.2020 | HR | 15.07.2020 | IT | 15.07.2020 | LT | 15.07.2020 | LV | 15.07.2020 | MC | 15.07.2020 | MK | 15.07.2020 | MT | 15.07.2020 | NL | 15.07.2020 | PL | 15.07.2020 | RO | 15.07.2020 | RS | 15.07.2020 | SE | 15.07.2020 | SI | 15.07.2020 | SK | 15.07.2020 | SM | 15.07.2020 | TR | 15.07.2020 | IE | 08.10.2020 | LU | 08.10.2020 | BG | 15.10.2020 | NO | 15.10.2020 | GR | 16.10.2020 | BE | 31.10.2020 | CH | 31.10.2020 | LI | 31.10.2020 | IS | 15.11.2020 | PT | 16.11.2020 | [2022/32] |
Former [2022/27] | HU | 08.10.2010 | |
AL | 15.07.2020 | ||
AT | 15.07.2020 | ||
CY | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
MT | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
TR | 15.07.2020 | ||
IE | 08.10.2020 | ||
LU | 08.10.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2022/26] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
TR | 15.07.2020 | ||
IE | 08.10.2020 | ||
LU | 08.10.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/46] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
IE | 08.10.2020 | ||
LU | 08.10.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/37] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 08.10.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
LI | 31.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/36] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 08.10.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
BE | 31.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/31] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
LU | 08.10.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/28] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/25] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/23] | AT | 15.07.2020 | |
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/22] | AT | 15.07.2020 | |
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/20] | AT | 15.07.2020 | |
DK | 15.07.2020 | ||
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
IT | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/17] | AT | 15.07.2020 | |
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
NL | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/10] | AT | 15.07.2020 | |
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/09] | AT | 15.07.2020 | |
ES | 15.07.2020 | ||
FI | 15.07.2020 | ||
LT | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
PT | 16.11.2020 | ||
Former [2021/08] | ES | 15.07.2020 | |
FI | 15.07.2020 | ||
LT | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
PT | 16.11.2020 | ||
Former [2021/07] | FI | 15.07.2020 | |
LT | 15.07.2020 | ||
NO | 15.10.2020 | Documents cited: | Search | [Y]US2006224655 (SHIRAI HIDEKI [JP], et al) [Y] 3,4 * paragraph [0001] * * paragraph [0066] - paragraph [0067] * * paragraph [0085] - paragraph [0086] * * paragraph [0111] - paragraph [0112] * * paragraph [0118] * * paragraph [0120] *; | [A]US2006285585 (SAMPATH HEMANTH [US]) [A] 8-15 * abstract * * paragraph [0011] - paragraph [0012] * * paragraph [0041] - paragraph [0047] * * paragraph [0051] *; | [X]US2010002598 (PAN KYLE JUNG-LIN [US], et al) [X] 1,2 * paragraph [0006] - paragraph [0007] * * paragraph [0023] - paragraph [0027] * * paragraph [0064] - paragraph [0067] *; | [XY] - NOKIA ET AL, "Performance of Explicit Feedback and Implicit Feedback in Supporting DL Multi-Antenna", 3GPP DRAFT; R1-094655, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091109), no. Jeju; 20091109, XP050389060 [X] 1,2 * 1. Introduction * * 2. Single-Cell Transmission * [Y] 3,4 | [Y] - RITT ET AL, "Eigen-mode Close-Loop Transmission for E-UTRA MIMO", 3GPP DRAFT; R1-060421, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20060209), vol. RAN WG1, no. Denver, USA; 20060209, XP050101365 [Y] 3,4 * 2. ECLT * * 2.1.1 Signal Model * * 2.1.2 Calculation and eigen-decomposition of correlation matrix * * 2.1.4 Determination of stream number * * 2.2 Feedback channel requirements * | [Y] - ERMOLAYEV V T ET AL, "Estimation of channel matrix rank for multielement antenna arrays working in multipath fading environment", CIRCUITS AND SYSTEMS FOR COMMUNICATIONS, 2002. PROCEEDINGS. ICCSC '02. 1ST IEEE INTERNATIONAL CONFERENCE ON 26-28 JUNE 2002, PISCATAWAY, NJ, USA,IEEE, (20020626), ISBN 978-5-7422-0260-8, pages 416 - 419, XP010600469 [Y] 3,4 * abstract * * I. Introduction * * II. MCIR matrix and space signal proseccing in antenna array * * III. Estimation of MCIR matrix rank * | [A] - ZTE, "Performance comparison between explicit feedback and implicit feedback", 3GPP DRAFT; R1-101406_MU_IMPEXP_COMPARISON, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100216), vol. RAN WG1, no. San Francisco, USA; 20100222, XP050418874 [A] 8-15 * 2. Simulation Setup * * 2.2 Explicit feedback * | [AD] - ERICSSON, "System-leven evaluation of OFDM - further considerations", 3GPP DRAFT; R1-031303, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20031119), vol. RAN WG1, no. Lisbon, Portugal; 20031119, XP050098349 [AD] 8-15 * 1. Introduction * * 3. The exponential ESM * | [AD] - KRISHNA SAYANA ET AL, "Short Term Link Performance Modeling for ML Receivers with Mutual Information per Bit Metrics", 2008 IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE : [IEEE GLOBECOM 2008] ; NEW ORLEANS, LOUISIANA, 30 NOVEMBER 2008 - 04 DECEMBER 2008, IEEE, PISCATAWAY, NJ, USA, (20081130), ISBN 978-1-4244-2324-8, pages 1 - 6, XP031370510 [AD] 8-15 * the whole document * | International search | [A]WO2009002097 (LG ELECTRONICS INC [KR], et al); | [Y]WO2010015429 (ICERA INC [US], et al); | [Y]WO2010106549 (CT OF EXCELLENCE IN WIRELESS [IN], et al) |