EP2649129 - POLY (ARYLENE ETHER)-POLYOLEFIN COMPOSITION AND ITS USE IN WIRE AND CABLE INSULATION AND SHEATHING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.11.2018 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 22.12.2017 | ||
Former | Grant of patent is intended Status updated on 24.07.2017 | ||
Former | Examination is in progress Status updated on 07.04.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states SABIC Global Technologies B.V. Plasticslaan 1 4612 PX Bergen op Zoom / NL | [N/P] |
Former [2016/22] | For all designated states SABIC Global Technologies B.V. Plasticslaan 1 4612 PX Bergen op Zoom / NL | ||
Former [2013/42] | For all designated states SABIC Innovative Plastics IP B.V. Plasticslaan 1 4612 PX Bergen op Zoom / NL | Inventor(s) | 01 /
QIU, Weili 5 Cambridge Road Formby Liverpool L37 2EL / GB | 02 /
LI, Xiucuo 31-602, 200 Ru Shan Road Shanghai 200120 / CN | 03 /
SHAN, Wei Room 1702 No. 17, Lane 88 Dongxin Road Shanghai 200063 / CN | [2013/47] |
Former [2013/42] | 01 /
QIU, Weili 36-1601 Chen Hui Road Pudong New Area Shanghai 201203 / CN | ||
02 /
LI, Xiucuo 31-602, 200 Ru Shan Road Shanghai 200120 / CN | |||
03 /
SHAN, Wei Room 1702 No. 17, Lane 88 Dongxin Road Shanghai 200063 / CN | Representative(s) | Lang, Johannes, et al Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2018/04] |
Former [2013/42] | Bublak, Wolfgang Bardehle Pagenberg Partnerschaft Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 10860617.9 | 07.12.2010 | [2018/04] | WO2010CN79498 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012075621 | Date: | 14.06.2012 | Language: | EN | [2012/24] | Type: | A1 Application with search report | No.: | EP2649129 | Date: | 16.10.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.06.2012 takes the place of the publication of the European patent application. | [2013/42] | Type: | B1 Patent specification | No.: | EP2649129 | Date: | 24.01.2018 | Language: | EN | [2018/04] | Search report(s) | International search report - published on: | CN | 14.06.2012 | (Supplementary) European search report - dispatched on: | EP | 05.08.2016 | Classification | IPC: | C08L71/12, C08L25/10, C08L23/02, H01B3/30, H01B3/42, C09K11/00, H01B1/00, H01L51/00 | [2016/36] | CPC: |
C08L23/0815 (EP,KR,US);
C08L71/12 (EP,KR,US);
C08L9/06 (US);
C08K3/22 (EP,KR,US);
C08L23/20 (EP,US);
C08L23/26 (KR,US);
C08L53/005 (KR,US);
C08L53/02 (EP,US);
C08L71/08 (KR,US);
G02B6/443 (KR,US);
H01B3/427 (EP,KR,US);
H01B3/441 (EP,KR,US);
H01B7/02 (KR,US);
C08L2205/035 (KR);
C08L23/06 (EP,US);
| C-Set: |
C08L71/12, C08K3/22, C08L23/20, C08L53/02 (EP,US)
|
Former IPC [2013/42] | C08L71/12, C08L25/10, C08L23/02, H01B3/30, H01B3/42 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | POLY (ARYLENETHER) -POLYOLEFINZUSAMMENSETZUNG UND IHRE VERWENDUNG IN DER DRAHT- UND KABELISOLIERUNG UND UMHÜLLUNG | [2013/42] | English: | POLY (ARYLENE ETHER)-POLYOLEFIN COMPOSITION AND ITS USE IN WIRE AND CABLE INSULATION AND SHEATHING | [2013/42] | French: | COMPOSITION DE POLY(ÉTHER ARYLÉNIQUE)-POLYOLÉFINE ET SON UTILISATION DANS L'ISOLATION ET LE GAINAGE DE FIL MÉTALLIQUE ET DE CÂBLE | [2013/42] | Entry into regional phase | 26.06.2013 | National basic fee paid | 26.06.2013 | Search fee paid | 26.06.2013 | Designation fee(s) paid | 26.06.2013 | Examination fee paid | Examination procedure | 26.06.2013 | Examination requested [2013/42] | 02.03.2017 | Amendment by applicant (claims and/or description) | 06.04.2017 | Despatch of a communication from the examining division (Time limit: M02) | 14.06.2017 | Reply to a communication from the examining division | 25.07.2017 | Communication of intention to grant the patent | 27.11.2017 | Fee for grant paid | 27.11.2017 | Fee for publishing/printing paid | 27.11.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.04.2017 | Opposition(s) | 25.10.2018 | No opposition filed within time limit [2019/01] | Fees paid | Renewal fee | 28.05.2013 | Renewal fee patent year 03 | 12.12.2013 | Renewal fee patent year 04 | 11.12.2014 | Renewal fee patent year 05 | 10.12.2015 | Renewal fee patent year 06 | 13.12.2016 | Renewal fee patent year 07 | 12.12.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.12.2010 | AL | 24.01.2018 | AT | 24.01.2018 | CY | 24.01.2018 | CZ | 24.01.2018 | DK | 24.01.2018 | EE | 24.01.2018 | ES | 24.01.2018 | FI | 24.01.2018 | HR | 24.01.2018 | IT | 24.01.2018 | LT | 24.01.2018 | LV | 24.01.2018 | MC | 24.01.2018 | MK | 24.01.2018 | NL | 24.01.2018 | PL | 24.01.2018 | PT | 24.01.2018 | RO | 24.01.2018 | RS | 24.01.2018 | SE | 24.01.2018 | SI | 24.01.2018 | SK | 24.01.2018 | SM | 24.01.2018 | TR | 24.01.2018 | BG | 24.04.2018 | NO | 24.04.2018 | GR | 25.04.2018 | IS | 24.05.2018 | [2020/31] |
Former [2020/30] | HU | 07.12.2010 | |
AL | 24.01.2018 | ||
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2020/27] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2020/16] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2019/40] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2019/13] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SI | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/52] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/51] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
DK | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/50] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/47] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/46] | AL | 24.01.2018 | |
AT | 24.01.2018 | ||
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/40] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/39] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RS | 24.01.2018 | ||
SE | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/38] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/37] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
Former [2018/36] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/35] | CY | 24.01.2018 | |
FI | 24.01.2018 | ||
HR | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/34] | FI | 24.01.2018 | |
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | Documents cited: | Search | [Y]WO2007079026 (GEN ELECTRIC [US], et al) [Y] 1-13* page 1 - page 25; example -; claims 1-69 *; | [Y]US2009084574 (BALFOUR KIM GENE [US], et al) [Y] 1-13 * paragraph [0001] - paragraph [0093]; example -; claims 1-41 * | International search | [A]WO2008076480 (GEN ELECTRIC [US], et al); | [Y]CN101351505 (GEN ELECTRIC [US]); | [A]WO2009042369 (SABIC INNOVATIVE PLASTICS IP [NL], et al); | [A]WO2010030478 (SABIC INNOVATIVE PLASTICS IP [NL], et al); | [Y]CN101874075 (SABIC INNOVATIVE PLASTICS IP) | by applicant | US2003181584 | US6914097 | US2006106139 | US2006131059 | US2006182967 | WO2007079026 | US2007261878 | US2009084574 | US2010139944 |