EP2353354 - Double disc coulter with depth guide roller [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.03.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 17.04.2020 | ||
Former | Grant of patent is intended Status updated on 01.01.2020 | ||
Former | Examination is in progress Status updated on 08.12.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Lemken GmbH & Co. KG Weseler Strasse 5 46519 Alpen / DE | [2020/21] |
Former [2011/32] | For all designated states Lemken GmbH & Co. KG Weseler Strasse 5 46519 Alpen / DE | Inventor(s) | 01 /
Gebbeken, Martin, Dipl.-Ing. 67b, Alte Strasse 46519 Alpen / DE | 02 /
Werries, Dieter 26, Riller Weg 46519 Alpen / DE | 03 /
Peaßens, Christian 38, Wiesenweg 47661 Issum / DE | 04 /
Lukas, Thomas 40a Quantwicker Str. 48683 Ahaus-Wüllen / DE | 05 /
Berendsen, Mark 4a, Korenhorster Weg 4a 7044 AJ Lengel / NL | 06 /
Geraats, Marcel 194a, Steyler Strasse 42334 Nettetal / DE | [2011/32] | Representative(s) | (deleted) | [2020/21] |
Former [2011/32] | Schulte & Schulte Hauptstrasse 2 45219 Essen / DE | Application number, filing date | 11000646.7 | 27.01.2011 | [2011/32] | Priority number, date | DE20101006169 | 29.01.2010 Original published format: DE102010006169 | [2011/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2353354 | Date: | 10.08.2011 | Language: | DE | [2011/32] | Type: | A8 Corrected patent application | No.: | EP2353354 | Date: | 28.09.2011 | [2011/39] | Type: | B1 Patent specification | No.: | EP2353354 | Date: | 20.05.2020 | Language: | DE | [2020/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.05.2011 | Classification | IPC: | A01C5/06, A01C7/20 | [2011/32] | CPC: |
A01C7/205 (EP);
A01C5/064 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/21] |
Former [2011/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Doppelscheibenschar mit Tiefenführungsrolle | [2011/39] | English: | Double disc coulter with depth guide roller | [2011/32] | French: | Soc à double disque doté d'un rouleau de guidage en profondeur | [2011/32] |
Former [2011/32] | Doppelscheibenschar mit Tiefenhührungsrolle | Examination procedure | 10.02.2012 | Amendment by applicant (claims and/or description) | 10.02.2012 | Examination requested [2012/12] | 06.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 18.06.2018 | Reply to a communication from the examining division | 13.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 23.09.2019 | Reply to a communication from the examining division | 02.01.2020 | Communication of intention to grant the patent | 02.04.2020 | Fee for grant paid | 02.04.2020 | Fee for publishing/printing paid | 02.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.12.2017 | Opposition(s) | 23.02.2021 | No opposition filed within time limit [2021/17] | Fees paid | Renewal fee | 31.01.2013 | Renewal fee patent year 03 | 31.01.2014 | Renewal fee patent year 04 | 02.02.2015 | Renewal fee patent year 05 | 01.02.2016 | Renewal fee patent year 06 | 31.01.2017 | Renewal fee patent year 07 | 31.01.2018 | Renewal fee patent year 08 | 31.01.2019 | Renewal fee patent year 09 | 31.01.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 20.05.2020 | CY | 20.05.2020 | DK | 20.05.2020 | EE | 20.05.2020 | ES | 20.05.2020 | FI | 20.05.2020 | HR | 20.05.2020 | LT | 20.05.2020 | LV | 20.05.2020 | MC | 20.05.2020 | MK | 20.05.2020 | NL | 20.05.2020 | RO | 20.05.2020 | RS | 20.05.2020 | SI | 20.05.2020 | SK | 20.05.2020 | SM | 20.05.2020 | TR | 20.05.2020 | BG | 20.08.2020 | NO | 20.08.2020 | GR | 21.08.2020 | IS | 20.09.2020 | PT | 21.09.2020 | IE | 27.01.2021 | LU | 27.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | [2024/29] |
Former [2024/22] | AL | 20.05.2020 | |
CY | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
MK | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
IE | 27.01.2021 | ||
LU | 27.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/24] | AL | 20.05.2020 | |
CY | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
IE | 27.01.2021 | ||
LU | 27.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/33] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
IE | 27.01.2021 | ||
LU | 27.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/07] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
IE | 27.01.2021 | ||
LU | 27.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/52] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
LU | 27.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/43] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
LU | 27.01.2021 | ||
Former [2021/40] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/24] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/10] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/09] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/08] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/04] | AL | 20.05.2020 | |
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RS | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/01] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
RS | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/51] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
RS | 20.05.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/50] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/48] | FI | 20.05.2020 | |
LT | 20.05.2020 | ||
NO | 20.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/47] | LT | 20.05.2020 | |
NO | 20.08.2020 | ||
IS | 20.09.2020 | ||
Former [2020/46] | IS | 20.09.2020 | Documents cited: | Search | [XI]US6389999 (DUELLO DENNIS [US]) [X] 1-3,6,8,11 * abstract * * column 5, line 41 - line 58 * * column 6, line 1 - line 65 * * figure -; claim - * [I] 5,7; | [I]CA2549371 (BAKER CHRISTOPHER JOHN [NZ], et al) [I] 1-11 * abstract * * page 17, line 19 - line 23 * * page 18, line 1 - line 23 * * page 19, line 8 - line 24 * * figure -; claim - *; | [A]EP1911339 (LEMKEN GMBH & CO KG [DE]) [A] 1 * abstract ** figure -; claim - *; | [A]WO2008086283 (PREC PLANTING INC [US], et al) [A] 7 * abstract * * page 7, paragraph 3 * * page 8, paragraph 1 * * page 9, paragraph 3 * * page 10, paragraphs 1,3 * * figure -; claim - * | by applicant | EP1911340 |