EP2357666 - III-nitride power device with solderable front metal [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.06.2022 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 02.07.2021 | ||
Former | Grant of patent is intended Status updated on 21.02.2021 | ||
Former | Examination is in progress Status updated on 10.02.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Infineon Technologies Americas Corp. 101 N. Sepulveda Boulevard El Segundo, CA 90245 / US | [2018/40] |
Former [2011/33] | For all designated states International Rectifier Corporation 233 Kansas Street El Segundo CA 90245 / US | Inventor(s) | 01 /
Cheah, Chuan 4708 Pacific Coast Highway Torrance, CA 90505 / US | 02 /
Briere, Michael, A. 2013 Hayemeyer Lane no. A Redondo Beach CA 90278 / US | [2011/33] | Representative(s) | JENSEN & SON 366-368 Old Street London EC1V 9LT / GB | [2021/31] |
Former [2011/33] | Dr. Weitzel & Partner Patentanwälte Friedenstrasse 10 89522 Heidenheim / DE | Application number, filing date | 11000918.0 | 04.02.2011 | [2011/33] | Priority number, date | US20100337924P | 16.02.2010 Original published format: US 337924 P | US201113018780 | 01.02.2011 Original published format: US201113018780 | [2013/13] |
Former [2011/33] | US20100337924P | 16.02.2010 | |
US20110018780 | 01.02.2011 | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2357666 | Date: | 17.08.2011 | Language: | EN | [2011/33] | Type: | A3 Search report | No.: | EP2357666 | Date: | 30.10.2013 | Language: | EN | [2013/44] | Type: | B1 Patent specification | No.: | EP2357666 | Date: | 04.08.2021 | Language: | EN | [2021/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.09.2013 | Classification | IPC: | H01L23/488, H01L23/482, H01L23/29, H01L23/00, H01L29/20, H01L29/778 | [2021/11] | CPC: |
H01L23/293 (EP,US);
H01L29/41758 (US);
H01L23/4824 (EP,US);
H01L24/05 (EP,US);
H01L24/06 (EP,US);
H01L24/29 (EP,US);
H01L24/30 (EP,US);
H01L24/32 (EP,US);
H01L24/33 (EP,US);
H01L27/088 (US);
H01L29/2003 (EP,US);
H01L29/201 (US);
H01L29/205 (US);
H01L29/4175 (US);
H01L29/452 (US);
H01L29/7787 (EP,US);
H02M3/158 (US);
H01L2224/02166 (EP,US);
H01L2224/0401 (EP,US);
H01L2224/04026 (EP,US);
H01L2224/05022 (EP,US);
H01L2224/05082 (EP,US);
H01L2224/05155 (EP,US);
H01L2224/05166 (EP,US);
H01L2224/05555 (EP,US);
H01L2224/05556 (EP,US);
H01L2224/05563 (EP,US);
H01L2224/05567 (EP,US);
H01L2224/056 (EP,US);
H01L2224/05639 (EP,US);
H01L2224/0603 (EP,US);
H01L2224/0615 (EP,US);
H01L2224/0616 (EP,US);
H01L2224/06177 (EP,US);
H01L2224/131 (EP,US);
H01L2224/29005 (EP,US);
H01L2224/29014 (EP,US);
H01L2224/29023 (EP,US);
H01L2224/291 (EP,US);
H01L2224/29101 (EP,US);
H01L2224/2919 (EP,US);
H01L2224/3003 (EP,US);
H01L2224/3015 (EP,US);
H01L2224/30177 (EP,US);
H01L2924/00014 (EP,US);
H01L2924/01004 (EP,US);
H01L2924/01006 (EP,US);
H01L2924/01013 (EP,US);
H01L2924/01014 (EP,US);
H01L2924/01022 (EP,US);
H01L2924/01029 (EP,US);
H01L2924/01033 (EP,US);
H01L2924/01047 (EP,US);
H01L2924/01082 (EP,US);
H01L2924/014 (EP,US);
H01L2924/04941 (EP,US);
H01L2924/0665 (EP,US);
H01L2924/10253 (EP,US);
H01L2924/1306 (EP,US);
H01L2924/13064 (EP,US);
| C-Set: |
H01L2224/05082, H01L2924/01028 (US,EP);
H01L2224/05155, H01L2924/00014 (US,EP);
H01L2224/05166, H01L2924/00014 (US,EP);
H01L2224/05556, H01L2924/00014 (US);
H01L2224/05639, H01L2924/00014 (US,EP);
H01L2224/056, H01L2924/014 (US,EP);
H01L2224/131, H01L2924/014, H01L2924/00014 (US,EP);
H01L2224/29101, H01L2924/014, H01L2924/00 (EP,US);
H01L2224/2919, H01L2924/0665, H01L2924/00 (EP,US);
H01L2224/291, H01L2924/014 (US,EP);
H01L2924/00014, H01L2224/05556 (US,EP);
H01L2924/0665, H01L2924/00 (US,EP);
H01L2924/13064, H01L2924/00 (EP,US);
H01L2924/1306, H01L2924/00 (US,EP); |
Former IPC [2021/10] | H01L23/29, H01L23/00, H01L23/482, H01L29/20, H01L29/778 | ||
Former IPC [2011/33] | H01L23/482 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/31] |
Former [2011/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | III-Nitrid-Leistungsbauelement mit lötbarem Frontmetall | [2011/33] | English: | III-nitride power device with solderable front metal | [2011/33] | French: | Dispositif de puissance à nitrure de groupe III avec partie métallique frontale pouvant être soudée | [2011/33] | Examination procedure | 28.04.2014 | Amendment by applicant (claims and/or description) | 28.04.2014 | Examination requested [2014/24] | 07.10.2016 | Despatch of a communication from the examining division (Time limit: M06) | 07.04.2017 | Reply to a communication from the examining division | 15.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 29.01.2020 | Reply to a communication from the examining division | 27.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2020 | Reply to a communication from the examining division | 22.02.2021 | Communication of intention to grant the patent | 23.06.2021 | Fee for grant paid | 23.06.2021 | Fee for publishing/printing paid | 23.06.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.10.2016 | Opposition(s) | 06.05.2022 | No opposition filed within time limit [2022/28] | Fees paid | Renewal fee | 27.02.2013 | Renewal fee patent year 03 | 27.02.2014 | Renewal fee patent year 04 | 26.02.2015 | Renewal fee patent year 05 | 26.02.2016 | Renewal fee patent year 06 | 17.02.2017 | Renewal fee patent year 07 | 22.02.2018 | Renewal fee patent year 08 | 22.02.2019 | Renewal fee patent year 09 | 26.02.2020 | Renewal fee patent year 10 | 24.02.2021 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.02.2011 | AL | 04.08.2021 | AT | 04.08.2021 | CY | 04.08.2021 | CZ | 04.08.2021 | DK | 04.08.2021 | EE | 04.08.2021 | ES | 04.08.2021 | FI | 04.08.2021 | HR | 04.08.2021 | IT | 04.08.2021 | LT | 04.08.2021 | LV | 04.08.2021 | MC | 04.08.2021 | MK | 04.08.2021 | NL | 04.08.2021 | PL | 04.08.2021 | RO | 04.08.2021 | RS | 04.08.2021 | SE | 04.08.2021 | SI | 04.08.2021 | SK | 04.08.2021 | SM | 04.08.2021 | BG | 04.11.2021 | NO | 04.11.2021 | GR | 05.11.2021 | IS | 04.12.2021 | PT | 06.12.2021 | GB | 04.02.2022 | IE | 04.02.2022 | LU | 04.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | FR | 28.02.2022 | LI | 28.02.2022 | [2024/22] |
Former [2024/20] | HU | 04.02.2011 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 04.02.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/18] | HU | 04.02.2011 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 04.02.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/10] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 04.02.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/09] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 04.02.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/08] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
GB | 04.02.2022 | ||
IE | 04.02.2022 | ||
LU | 04.02.2022 | ||
FR | 28.02.2022 | ||
Former [2023/03] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
LU | 04.02.2022 | ||
FR | 28.02.2022 | ||
Former [2022/47] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
LU | 04.02.2022 | ||
Former [2022/44] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/36] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/29] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/26] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/24] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/21] | AT | 04.08.2021 | |
DK | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/16] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/10] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/09] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
PT | 06.12.2021 | ||
Former [2022/08] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
Former [2022/07] | AT | 04.08.2021 | |
LT | 04.08.2021 | ||
NO | 04.11.2021 | Documents cited: | Search | [I]US2005017299 (SHEN ZHENG JOHN [US]) [I] 1-20 * figures 1-4 * * paragraphs [0012] - [0039] *; | [A]US2005200011 (STANDING MARTIN [GB], et al) [A] 7,17* paragraph [0014] *; | [I]US2006202320 (SCHAFFER CHRISTOPHER P [US]) [I] 1-20 * figures 6-8 * * paragraphs [0009] , [0 27] , [0 30] , [0 31] * | Examination | - GUPTA D D, "A NOVEL ACTIVE AREA BUMPED FLIP CHIP TECHNOLOGY FOR CONVERGENT HEATTRANSFER FROM GALLIUM ARSENIDE POWER DEVICES", IEEE TRANSACTIONS ON COMPONENTS, PACKAGING ANDMANUFACTURING TECHNOLOGY: PART A, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, (19950301), vol. 18, no. 1, doi:10.1109/95.370739, ISSN 1070-9886, pages 82 - 86, XP000493558 DOI: http://dx.doi.org/10.1109/95.370739 |