blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2366895

EP2366895 - Method of determining the azimuth angle during maintenance of a wind turbine [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.02.2015
Database last updated on 03.09.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Senvion SE
Überseering 10 (Oval Office)
22297 Hamburg / DE
[2014/50]
Former [2014/16]For all designated states
Senvion SE
Überseering 10
22297 Hamburg / DE
Former [2012/32]For all designated states
REpower Systems AG
Überseering 10
22297 Hamburg / DE
Former [2011/38]For all designated states
Repower Systems AG
Überseering 10
22297 Hamburg / DE
Inventor(s)01 / Von Mutius, Martin
Bergstr. 122
24358 Ascheffel / DE
02 / Steudel, Dirk
Sternstr. 8
24116 Kiel / DE
 [2011/38]
Representative(s)Groth, Wieland
Patentanwalt
Zippelhaus 4
20457 Hamburg / DE
[N/P]
Former [2011/38]Groth, Wieland
Schopenstehl 22
20095 Hamburg / DE
Application number, filing date11001715.902.03.2011
[2011/38]
Priority number, dateDE2010101154915.03.2010         Original published format: DE102010011549
[2011/38]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2366895
Date:21.09.2011
Language:DE
[2011/38]
Type: B1 Patent specification 
No.:EP2366895
Date:23.04.2014
Language:DE
[2014/17]
Search report(s)(Supplementary) European search report - dispatched on:EP01.07.2011
ClassificationIPC:F03D7/02, F03D1/00
[2011/38]
CPC:
F03D7/0204 (EP,US); F03D7/0264 (EP,US); F03D7/0268 (EP,US);
F03D7/0288 (EP,US); F03D80/50 (EP,US); F03D17/00 (EP,US);
F03D7/04 (EP,US); F05B2230/80 (EP,US); F05B2270/329 (EP,US);
G01L25/003 (EP,US); Y02E10/72 (EP,US); Y02P70/50 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2011/38]
TitleGerman:Verfahren zur Bestimmung eines Wartungsazimutwinkels einer Windenergieanlage[2011/38]
English:Method of determining the azimuth angle during maintenance of a wind turbine[2011/38]
French:Procédé de détermination d'un angle d'azimut pendant une activité de maintenance d'éolienne[2011/38]
Examination procedure18.11.2011Amendment by applicant (claims and/or description)
18.11.2011Examination requested  [2011/52]
19.07.2012Communication of intention to grant the patent
20.11.2012Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
20.11.2012Fee for grant paid
20.11.2012Fee for publishing/printing paid
22.07.2013Despatch of a communication from the examining division (Time limit: M04)
25.09.2013Reply to a communication from the examining division
28.10.2013Despatch of a communication from the examining division (Time limit: M02)
03.01.2014Reply to a communication from the examining division
20.02.2014Communication of intention to grant the patent
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.07.2012
Opposition(s)26.01.2015No opposition filed within time limit [2015/14]
Fees paidRenewal fee
28.03.2013Renewal fee patent year 03
14.03.2014Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.03.2011
AL23.04.2014
CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
IT23.04.2014
LT23.04.2014
LV23.04.2014
MC23.04.2014
MK23.04.2014
MT23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SI23.04.2014
SK23.04.2014
SM23.04.2014
TR23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
[2018/46]
Former [2018/31]HU02.03.2011
CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
IT23.04.2014
LT23.04.2014
LV23.04.2014
MC23.04.2014
MK23.04.2014
MT23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SI23.04.2014
SK23.04.2014
SM23.04.2014
TR23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2017/38]HU02.03.2011
CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
IT23.04.2014
LT23.04.2014
LV23.04.2014
MC23.04.2014
MT23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SI23.04.2014
SK23.04.2014
SM23.04.2014
TR23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2017/03]CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
IT23.04.2014
LT23.04.2014
LV23.04.2014
MC23.04.2014
MT23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SI23.04.2014
SK23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2015/46]CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
IT23.04.2014
LT23.04.2014
LV23.04.2014
MC23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SI23.04.2014
SK23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2015/36]CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
IT23.04.2014
LT23.04.2014
LV23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SI23.04.2014
SK23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2015/18]CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
IT23.04.2014
LT23.04.2014
LV23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SK23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2015/11]CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
LT23.04.2014
LV23.04.2014
NL23.04.2014
PL23.04.2014
RO23.04.2014
RS23.04.2014
SE23.04.2014
SK23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2015/10]CY23.04.2014
CZ23.04.2014
EE23.04.2014
FI23.04.2014
HR23.04.2014
LT23.04.2014
LV23.04.2014
NL23.04.2014
PL23.04.2014
RS23.04.2014
SE23.04.2014
SK23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2015/02]CY23.04.2014
FI23.04.2014
HR23.04.2014
LT23.04.2014
LV23.04.2014
NL23.04.2014
PL23.04.2014
RS23.04.2014
SE23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
PT25.08.2014
Former [2014/52]CY23.04.2014
FI23.04.2014
HR23.04.2014
LT23.04.2014
LV23.04.2014
NL23.04.2014
PL23.04.2014
RS23.04.2014
SE23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
Former [2014/50]CY23.04.2014
FI23.04.2014
HR23.04.2014
LT23.04.2014
LV23.04.2014
NL23.04.2014
PL23.04.2014
SE23.04.2014
BG23.07.2014
NO23.07.2014
GR24.07.2014
IS23.08.2014
Former [2014/49]CY23.04.2014
FI23.04.2014
LT23.04.2014
BG23.07.2014
NO23.07.2014
IS23.08.2014
Former [2014/48]CY23.04.2014
LT23.04.2014
BG23.07.2014
Former [2014/47]CY23.04.2014
Documents cited:Search[XA]EP2058513  (REPOWER SYSTEMS AG [DE]) [X] 14,15 * abstract * [A] 2-13;
 [XA]US2005175451  (WOBBEN ALOYS [DE]) [X] 14,15 * abstract * [A] 2-13;
 [XA]DE19717059  (AERODYN ENG GMBH [DE]) [X] 14,15 * abstract * [A] 2-13;
 [XA]WO2008145126  (VESTAS WIND SYS AS [DK], et al) [X] 14,15 * abstract * [A] 2-13
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.