blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2384641

EP2384641 - Supply of suspension elements with anti-tamper seal and device for their feeding into a packaging machine [Right-click to bookmark this link]
Former [2011/45]Pre-assembled loop with plumb
[2020/11]
StatusNo opposition filed within time limit
Status updated on  11.06.2021
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  03.07.2020
FormerGrant of patent is intended
Status updated on  26.02.2020
FormerExamination is in progress
Status updated on  31.01.2019
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Poly-clip System GmbH & Co. KG
Niedeckerstraße 1
65795 Hattersheim / DE
[2019/29]
Former [2011/45]For all designated states
Poly-clip System GmbH
Westerbachstrasse 45
60489 Frankfurt am Main / DE
Inventor(s)01 / Hinter, Marco
Erlenweg 8
35767 Breidscheid / DE
 [2011/45]
Representative(s)Eisenführ Speiser
Patentanwälte Rechtsanwälte PartGmbB
Postfach 31 02 60
80102 München / DE
[2020/32]
Former [2011/45]Eisenführ, Speiser & Partner
Postfach 31 02 60
80102 München / DE
Application number, filing date11003661.304.05.2011
[2011/45]
Priority number, dateDE20102006403U04.05.2010         Original published format: DE 202010006403 U
[2011/45]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2384641
Date:09.11.2011
Language:DE
[2011/45]
Type: A3 Search report 
No.:EP2384641
Date:12.12.2012
Language:DE
[2012/50]
Type: B1 Patent specification 
No.:EP2384641
Date:05.08.2020
Language:DE
[2020/32]
Search report(s)(Supplementary) European search report - dispatched on:EP08.11.2012
ClassificationIPC:A22C15/00
[2011/45]
CPC:
A22C15/002 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/32]
Former [2011/45]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Vorrat an flexiblen Aufhängeelementen mit Plombe und Vorrichtung zu ihrer Zuführung in eine Verpackungsmaschine[2020/11]
English:Supply of suspension elements with anti-tamper seal and device for their feeding into a packaging machine[2020/32]
French:Ensemble d'éléments de suspension fournis avec un plomb et dispositif pour leur alimentation dans une machine d'emballage[2020/11]
Former [2011/45]Vorkonvektionierte Schlaufe mit Plombe
Former [2011/45]Pre-assembled loop with plumb
Former [2011/45]Boucle préconfectionnée dotée d'un plomb
Examination procedure10.06.2013Amendment by applicant (claims and/or description)
12.06.2013Examination requested  [2013/30]
11.03.2016Despatch of a communication from the examining division (Time limit: M04)
20.07.2016Reply to a communication from the examining division
25.01.2019Despatch of a communication from the examining division (Time limit: M06)
30.07.2019Reply to a communication from the examining division
27.02.2020Communication of intention to grant the patent
17.06.2020Fee for grant paid
17.06.2020Fee for publishing/printing paid
17.06.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  11.03.2016
Opposition(s)07.05.2021No opposition filed within time limit [2021/28]
Fees paidRenewal fee
31.05.2013Renewal fee patent year 03
02.06.2014Renewal fee patent year 04
01.06.2015Renewal fee patent year 05
31.05.2016Renewal fee patent year 06
31.05.2017Renewal fee patent year 07
01.06.2018Renewal fee patent year 08
31.05.2019Renewal fee patent year 09
09.03.2020Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.05.2011
AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
MT05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT04.05.2021
GB04.05.2021
IE04.05.2021
LU04.05.2021
[2024/41]
Former [2024/29]HU04.05.2011
AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT04.05.2021
GB04.05.2021
IE04.05.2021
LU04.05.2021
Former [2024/22]HU04.05.2011
AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT04.05.2021
GB04.05.2021
IE04.05.2021
LU04.05.2021
Former [2023/29]HU04.05.2011
AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT04.05.2021
GB04.05.2021
IE04.05.2021
LU04.05.2021
Former [2023/24]AL05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT04.05.2021
GB04.05.2021
IE04.05.2021
LU04.05.2021
Former [2022/37]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
AT04.05.2021
GB04.05.2021
IE04.05.2021
LU04.05.2021
Former [2022/22]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
GB04.05.2021
IE04.05.2021
LU04.05.2021
Former [2022/21]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE04.05.2021
LU04.05.2021
Former [2022/09]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
LU04.05.2021
Former [2022/07]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/36]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/28]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/25]AL05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/23]CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/22]CZ05.08.2020
DK05.08.2020
EE05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/20]DK05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/12]FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/10]FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/09]FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
PT07.12.2020
Former [2021/08]FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
PT07.12.2020
Former [2021/07]FI05.08.2020
LT05.08.2020
NO05.11.2020
Documents cited:Search[Y]DE19700891  (POLY CLIP SYSTEM GMBH & CO KG [DE]) [Y] 1-13 * abstract * * column 1, line 3 - column 2, line 63 *;
 [Y]DE19741932  (NEUKAEMPER UWE [DE], et al) [Y] 1-13 * abstract * * column 1, line 3 - column 6, line 47 *;
 [A]US2005245187  (STEINKE GARY L [US], et al) [A] 1-15 * paragraphs [0001] - [0030]; figures 1-6 *;
 [A]DE2529821  (NIEDECKER HERBERT) [A] 1-15 * pages 1-7; figures 1-8; claims 1-11 *;
 [A]DE2352000  (NIEDECKER HERBERT DIPL-ING) [A] 1-15 * column 1, line 32 - column 4, line 11; figures 1,2; claims 1-4 *;
 [A]DE2412284  (BUCHHOLZ ANTON [DE]) [A] 1-15 * column 1, line 41 - column 4, line 20; figures 1-5; claims 1-5 *;
 [A]DE8510076U  (C. HOEGGER & CIE.) [A] 1-15 * pages 3-7; figures 1-4; claims 1-6 *
ExaminationCH372943
by applicantDE102006041829
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.