blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2608633

EP2608633 - Element which produces heat [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 20.07.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  11.03.2020
FormerExamination is in progress
Status updated on  24.02.2020
FormerGrant of patent is intended
Status updated on  29.11.2019
FormerExamination is in progress
Status updated on  02.11.2016
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Eberspächer catem GmbH & Co. KG
Gewerbepark West 16
76863 Herxheim / DE
[2013/26]
Inventor(s)01 / Bohlender, Franz
Jahnstrasse 15a
76870 Kandel / DE
02 / Niederer, Michael
Ludwig-Körberstrasse 21a
76889 Kapellen-Drusweiler / DE
03 / Morgen, Christian
Beethovenring 14
76761 Rülzheim / DE
 [2013/26]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2020/35]
Former [2013/26]Grünecker, Kinkeldey, Stockmair & Schwanhäusser
Leopoldstrasse 4
80802 München / DE
Application number, filing date11010088.022.12.2011
[2013/26]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2608633
Date:26.06.2013
Language:DE
[2013/26]
Type: B1 Patent specification 
No.:EP2608633
Date:26.08.2020
Language:DE
[2020/35]
Search report(s)(Supplementary) European search report - dispatched on:EP14.06.2012
ClassificationIPC:H05B3/50
[2013/26]
CPC:
H05B3/46 (EP,US); H05B3/02 (US); H05B3/30 (EP,US);
B60H1/2225 (US); H05B2203/02 (EP,US); H05B2203/023 (EP,US);
H05B3/50 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/26]
TitleGerman:Wärme erzeugendes Element[2013/26]
English:Element which produces heat[2013/26]
French:Elément générateur de chaleur[2013/26]
Examination procedure05.07.2012Amendment by applicant (claims and/or description)
05.07.2012Examination requested  [2013/26]
18.07.2016Despatch of a communication from the examining division (Time limit: M04)
28.10.2016Reply to a communication from the examining division
17.12.2018Despatch of a communication from the examining division (Time limit: M04)
07.03.2019Reply to a communication from the examining division
28.11.2019Communication of intention to grant the patent
21.02.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
12.03.2020Communication of intention to grant the patent
16.07.2020Fee for grant paid
16.07.2020Fee for publishing/printing paid
16.07.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.07.2016
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
23.12.2013Renewal fee patent year 03
23.12.2014Renewal fee patent year 04
23.12.2015Renewal fee patent year 05
23.12.2016Renewal fee patent year 06
28.12.2017Renewal fee patent year 07
21.12.2018Renewal fee patent year 08
17.12.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.12.2011
AL26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
AT22.12.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/34]
Former [2022/32]HU22.12.2011
AL26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
AT22.12.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU22.12.2011
AL26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MT26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
AT22.12.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/26]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
AT22.12.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/23]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
AT22.12.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/21]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
AT22.12.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/10]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/49]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
GB22.12.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
Former [2021/47]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE22.12.2020
LU22.12.2020
IS26.12.2020
PT28.12.2020
Former [2021/46]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE22.12.2020
IS26.12.2020
PT28.12.2020
Former [2021/40]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/23]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/20]DK26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/12]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
NO26.11.2020
Documents cited:Search[Y]EP1580495  (HALLA CLIMATE CONTROL CORP [KR], et al);
 [A]US2008173637  (TAGUCHI KOSHIRO [JP]);
 [XA]EP2190256  (BEHR FRANCE ROUFFACH SAS [FR]);
 [XY]EP2211589  (BEHR GMBH & CO KG [DE], et al);
 [A]EP2393336  (BEHR FRANCE ROUFFACH S A R L [FR])
ExaminationDE102010004034
by applicantEP0350528
 EP1768457
 EP1768458
 EP2299200
 EP2298582
 EP2299201
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.